USGS Science⌕ Search

USGS · ofr20181166

Overview and progress of the pallid sturgeon assessment framework redesign process

Abstract

The Pallid Sturgeon Population Assessment Program (PSPAP) was initiated in 2003, and full implementation began in 2006, to monitor the trend of Scaphirhynchus albus (pallid sturgeon) and native fish communities in the Upper and Lower Missouri River Basins. The original PSPAP (v. 1.0) was a catch-effort based monitoring program where population abundance and trend were monitored using a relative index, catch per unit effort. In 2013, the Missouri River Recovery Program (MRRP), led by the U.S. Army Corps of Engineers (USACE) and the U.S. Fish and Wildlife Service (USFWS), began a reassessment of science and monitoring approaches to support a new river management plan. The need to redesign the PSPAP was triggered by the recognition that the PSPAP v. 1.0 would not be optimally effective in contributing information needed to make decisions about the pallid sturgeon fundamental management objective—to avoid jeopardizing the continued existence of the pallid sturgeon from USACE actions in the Missouri River—identified in the Missouri River Science and Adaptive Management Plan. The fundamental management objective includes two management subobjectives: (1) increase pallid sturgeon recruitment to age 1 and (2) maintain or increase numbers of pallid sturgeon as an interim measure until sufficient and sustained natural recruitment occurs. These two management subobjectives motivated the development of two fundamental information objectives for PSPAP v. 2.0: (1) to provide information needed to quantify recruitment to age 1 and (2) to quantify pallid sturgeon population abundance and trend. The charge to the authors of this report was to develop an approach to monitoring the pallid sturgeon population in the Missouri River that would contribute information toward gauging overall performance of management actions to achieve the fundamental objectives of the MRRP and to potentially improve understanding of linkages from the management activities to population responses. We used transparent and robust processes to identify alternative monitoring designs that meet the fundamental objectives for managing pallid sturgeon in the MRRP, with a focus on simulation models to evaluate the performance of varying monitoring. This report documents the process of comparing potential alternative monitoring design abilities to provide decision-relevant information for management of the species. The process includes evaluation of information content and attendant uncertainties and considers tradeoffs in types of information valued by stakeholders. The anticipated end product of this process will be synthesized in a decision-support tool that can be used to facilitate learning and iterative revisions of the monitoring roadmap.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Michael E. Colvin, Sara Reynolds, Robert B. Jacobson, Landon L. Pierce, Kirk D. Steffensen, Timothy L. Welker. 2018-11-14. Overview and progress of the pallid sturgeon assessment framework redesign process. https://doi.org/10.3133/ofr20181166

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

ECCOE Landsat quarterly calibration and validation report—Quarter 2, 2026

Executive Summary The U.S. Geological Survey Earth Resources Observation and Science Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continually monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 8 and 9 for quarter 2 (April–June), 2026. All data used to compile the Cal/Val analysis results presented in this report are freely available from the U.S. Geological Survey EarthExplorer website: https://earthexplorer.usgs.gov.

Open-File Report↗

ECCOE Landsat quarterly calibration and validation report—Quarter 1, 2026

Executive Summary The U.S. Geological Survey Earth Resources Observation and Science Calibration and Validation (Cal/Val) Center of Excellence (ECCOE) focuses on improving the accuracy, precision, calibration, and product quality of remote-sensing data, leveraging years of multiscale optical system geometric and radiometric calibration and characterization experience. The ECCOE Landsat Cal/Val Team continually monitors the geometric and radiometric performance of active Landsat missions and makes calibration adjustments, as needed, to maintain data quality at the highest level. This report provides observed geometric and radiometric analysis results for Landsats 8 and 9 for quarter 1 (January–March) of 2026. All data used to compile the Cal/Val analysis results presented in this report are freely available from the U.S. Geological Survey EarthExplorer website: https://earthexplorer.usgs.gov . One specific activity that the ECCOE Landsat Cal/Val Team closely monitored was a Landsat 8 Thermal Infrared Sensor encoder alerts anomaly. On March 18, 2026, the Thermal Infrared Sensor instrument’s mechanism control electronics board reset, driving several parameters to default power-on values. Subsequent telemetry and analysis determined that no persistent hardware misconfiguration was present and no radiometric or geometric degradation was observed.

Open-File Report↗

Floods of June 20–July 6, 2024, in the Big Sioux River, Rock River, Little Sioux River, Ocheyedan River, and Floyd River Basins, northwestern Iowa

Major flooding occurred on June 20–July 6, 2024, in northwestern Iowa affecting the Big Sioux, Rock, Little Sioux, Ocheyedan, and Floyd River Basins. Heavy rain fell in northwestern Iowa, southwestern Minnesota, and southeastern South Dakota on June 20–22, 2024. Parts of northwestern Iowa recorded 2–6 inches of rainfall and localized amounts exceeding 12 inches. A maximum peak-of-record streamflow of 175,000 cubic feet per second at the U.S. Geological Survey streamgage Big Sioux River at Akron, Iowa (06485500), was recorded on June 22, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at four locations along the Big Sioux River between U.S. Interstate 29 at Sioux City, Iowa, upstream to Iowa Highway 10 north of Hawarden, Iowa, a distance of 75.7 river miles. A maximum peak-of-record streamflow of 157,000 cubic feet per second at the U.S. Geological Survey streamgage Rock River near Rock Valley, Iowa (06483500), was recorded on June 22, 2024, and had an annual exceedance probability of less than 0.2 percent. High-water marks were measured at eight locations along the Rock River between County Road B30 east of Hudson, South Dakota, upstream to Iowa Highway 9 at Rock Rapids, Iowa, a distance of 39.3 river miles. A maximum peak-of-record streamflow of 63,000 cubic feet per second at the U.S. Geological Survey streamgage Little Sioux River at Correctionville, Iowa (06606600), was recorded on June 24, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at 11 locations along the Little Sioux River between Iowa Highway 31 west of Correctionville, Iowa, upstream to U.S. Highway 18 north of Spencer, Iowa, a distance of 134.8 river miles. A maximum streamflow of 24,500 cubic feet per second at the U.S. Geological Survey streamgage Ocheyedan River near Spencer, Iowa (06605000), was recorded on June 22, 2024, and had an annual exceedance probability range of 0.2–0.49 percent. High-water marks were measured at three locations along the Ocheyedan River between County Road M38 west of Spencer, Iowa, upstream to U.S. Highway 18 west of Everly, Iowa, a distance of 12.8 river miles. A maximum streamflow of 41,000 cubic feet per second at the U.S. Geological Survey streamgage Floyd River at Alton, Iowa (06600100), was recorded on June 22, 2024, and had an annual exceedance probability range of 1–1.99 percent. High-water marks were measured at six locations along the Floyd River between Iowa Highway 3 at Le Mars, Iowa, upstream to Iowa Highway 10 at Alton, Iowa, a distance of 27.5 river miles. The high-water marks were used to develop flood profiles for the Big Sioux, Rock, Little Sioux, Ocheyedan, and Floyd Rivers.

Iowa, Minnesota, South Dakota↗