USGS ScienceSearch

USGS · 70141433

Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load

Abstract

The Elwha River restoration project, in Washington State, includes the largest dam-removal project in United States history to date. Starting September 2011, two nearly century-old dams that collectively contained 21 &plusmn; 3 million m 3 of sediment were removed over the course of three years with a top-down deconstruction strategy designed to meter the release of a portion of the dam-trapped sediment. Gauging with sediment-surrogate technologies during the first two years downstream from the project measured 8,200,000 &plusmn; 3,400,000 tonnes of transported sediment, with 1,100,000 and 7,100,000 t moving in years 1 and 2, respectively, representing 3 and 20 times the Elwha River annual sediment load of 340,000 &plusmn; 80,000 t/y. During the study period, the discharge in the Elwha River was greater than normal (107% in year 1 and 108% in year 2); however, the magnitudes of the peak-flow events during the study period were relatively benign with the largest discharge of 292 m 3 /s (73% of the 2-year annual peak-flow event) early in the project when both extant reservoirs still retained sediment. Despite the muted peak flows, sediment transport was large, with measured suspended-sediment concentrations during the study period ranging from 44 to 16,300 mg/L and gauged bedload transport as large as 24,700 t/d. Five distinct sediment-release periods were identified when sediment loads were notably increased (when lateral erosion in the former reservoirs was active) or reduced (when reservoir retention or seasonal low flows and cessation of lateral erosion reduced sediment transport). Total suspended-sediment load was 930,000 t in year 1 and 5,400,000 t in year 2. Of the total 6,300,000 &plusmn; 3,200,000 t of suspended-sediment load, 3,400,000 t consisted of silt and clay and 2,900,000 t was sand. Gauged bedload on the lower Elwha River in year 2 of the project was 450,000 &plusmn; 360,000 t. Bedload was not quantified in year 1, but qualitative observations using bedload-surrogate instruments indicated detectable bedload starting just after full removal of the downstream dam. Using comparative studies from other sediment-laden rivers, the total ungauged fraction of < 2-mm bedload was estimated to be on the order of 1.5 Mt.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 47.939806921954094° to 48.17341248658084° latitude; -123.73283386230467° to -123.43482971191405° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Christopher S. Magirl, Robert C. Hilldale, Christopher A. Curran, Jeffrey J. Duda, Timothy D. Straub, Marian M. Domanski, James R. Foreman. 2015. Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load. https://doi.org/10.1016/j.geomorph.2014.12.032

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

The influence of riparian zone grazing on channel stability in an arroyo

The introduction of large herds of domesticated grazing animals by European immigrants in the late 19th century is one primary hypothesis used to explain the initiation of arroyo cutting in the American West. But studies designed to quantify the effects of grazing on watershed hydrology and sedimentation have had conflicting results that are often scale dependent. We used a before-and-after study design to examine effects of changes in cattle grazing practices on channel stability in Muddy Creek, an arroyo in the Colorado River headwaters. We digitized 620 meander loop cutoff geometries in the alluvial bottom of Muddy Creek and used meander loop cutoff rate as a broad measure of channel stability. Poisson regression modeling indicated that the change in grazing practices caused an order-of-magnitude decrease in meander loop cutoff rate that was independent of other forcings. Repeat measurements of channel geometry showed a decline in bankfull channel width of about 40% after the changes were implemented. Increases in riparian vegetation density are deduced to be the primary mechanism for the increase in channel stability. Prior to the changes in grazing practices, at least one meander loop cutoff occurred each year, some of which were large enough to create headcuts that scale with the depth of downcutting in this arroyo system. Our analysis demonstrates the profound effects that different grazing practices have on channel stability in headwater arroyo systems, and the potential for grazing animals to initiate a cascade of sediment yields to receiving stream networks.

Colorado, Utah, Wyoming

Revisiting the geochronology of late Quaternary marine terraces and uplift rates in coastal Santa Barbara County, California, USA

In several early studies, central California marine terraces between Santa Barbara and Point Conception were interpreted to record sea-level high stands of the last interglacial complex, ∼80 ka to ∼120 ka (marine isotope stage [MIS] 5). These ages and their elevations (∼20 m to ∼45 m) indicate modest rates of tectonic uplift, similar to those from other localities in southern and central California. A recent study, using a combination of luminescence and radiocarbon dating, has challenged the older age interpretations, implying much younger terrace ages, between ∼40 ka and ∼55 ka (MIS 3). From these new ages and a considerably lower sea level during MIS 3, much higher rates of tectonic uplift are inferred. In the present study, new uranium-series ages of terrace corals and amino acid age estimates of terrace mollusks were determined to test these competing interpretations. With the exception of a low-elevation terrace in Isla Vista (near Santa Barbara) that dates to MIS 3, terraces farther west are interpreted to date to MIS 5 and imply tectonic uplift rates of 0.20–0.34 m/kyr. A compilation of data for the region yields a decreasing rate of late Quaternary uplift from east, near Ventura, to west, near Point Conception. This trend is interpreted to reflect a decreasing influence of the processes of compression and crustal shortening south of the Big Bend in the San Andreas fault.

California

Toward an efficient framework for remote sensing of river bathymetry: Comparing sensors and algorithms on an inaccessible proglacial river in Alaska

Remote sensing can provide reliable information on river depths and this approach might be particularly valuable in areas that are difficult to survey via conventional field methods. In this study, we assessed the potential to map the bathymetry of an inaccessible proglacial river in Alaska from both aerial orthophotos and a multispectral satellite image. In addition, we evaluated a variety of depth retrieval algorithms with different input data requirements, including some methods that require field measurements of water depth for calibration and other techniques that can be applied even when such field data are not available. These approaches might enable more efficient use of remote sensing methods by resource management agencies. Our results suggest that bathymetric mapping along the turquoise-colored river we examined was not only feasible but highly accurate ( R 2 up to 0.94) for both types of image data. Algorithms that use paired observations of depth and reflectance to train depth retrieval models were the most accurate, with errors on the order of 15%–20% and little or no bias. Alternative techniques based on hydraulic and statistical concepts also led to strong agreement between predicted and observed depths but were more susceptible to systematic biases toward under- or over-estimation of depth. In contrast to clear-flowing streams, bathymetric mapping in this environment was enabled by a direct relationship between the depth and brightness of the water due to scattering by suspended sediment. In selecting an appropriate depth retrieval method, a compromise might need to be reached between the level of field effort invested and the accuracy of the resulting image-derived bathymetry. Standalone software for implementing these techniques is freely available.

Alaska