USGS ScienceSearch

Geology topics

Robert C. Hilldale

Publications and source records attributed to Robert C. Hilldale.

4 recordsLinked to original sources

Declining geomorphic diversity and potential adaptive management opportunities on a highly regulated reach of the Bighorn River, Montana

Rivers downstream from dams often experience decreased flow variability and disrupted sediment transport. We investigated a highly regulated 35.5-kilometre reach of the Bighorn River, downstream from Yellowtail Dam, emplaced in 1965. This dam created a thriving trout fishery, but more recently, side channel networks and habitat diminished. We document how the Bighorn River's anabranching morphology responded to flow regulation and a near cessation of sediment supply. Geomorphic diversity drastically decreased since 1939 and the Bighorn River abandoned numerous side channels. By 1980, geomorphic loss slowed, and the river became laterally static. The 1980 river and side channel network could represent the maximum areal extent of a downscaled morphology, maintained through restoration and adaptive management. However, side channel restoration alone will not return natural alluvial processes to this river reach. The Bighorn River needs sediment to reinstate dynamic lateral movement, even within a downscaled morphology. Sediment augmentation is an option, but more complex to implement on rivers where potential downstream impacts and landowners must be considered. The decline of geomorphic diversity and potential adaptive management solutions on the Bighorn River has wide applicability to numerous dammed rivers, where similar changes to the flow and sediment transport regime are common.

Montana, Wyoming

Morphodynamic evolution following sediment release from the world’s largest dam removal

Sediment pulses can cause widespread, complex changes to rivers and coastal regions. Quantifying landscape response to sediment-supply changes is a long-standing problem in geomorphology, but the unanticipated nature of most sediment pulses rarely allows for detailed measurement of associated landscape processes and evolution. The intentional removal of two large dams on the Elwha River (Washington, USA) exposed ~30 Mt of impounded sediment to fluvial erosion, presenting a unique opportunity to quantify source-to-sink river and coastal responses to a massive sediment-source perturbation. Here we evaluate geomorphic evolution during and after the sediment pulse, presenting a 5-year sediment budget and morphodynamic analysis of the Elwha River and its delta. Approximately 65% of the sediment was eroded, of which only ~10% was deposited in the fluvial system. This restored fluvial supply of sand, gravel, and wood substantially changed the channel morphology. The remaining ~90% of the released sediment was transported to the coast, causing ~60 ha of delta growth. Although metrics of geomorphic change did not follow simple time-coherent paths, many signals peaked 1–2 years after the start of dam removal, indicating combined impulse and step-change disturbance responses.

Washington

Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load

The Elwha River restoration project, in Washington State, includes the largest dam-removal project in United States history to date. Starting September 2011, two nearly century-old dams that collectively contained 21 &plusmn; 3 million m 3 of sediment were removed over the course of three years with a top-down deconstruction strategy designed to meter the release of a portion of the dam-trapped sediment. Gauging with sediment-surrogate technologies during the first two years downstream from the project measured 8,200,000 &plusmn; 3,400,000 tonnes of transported sediment, with 1,100,000 and 7,100,000 t moving in years 1 and 2, respectively, representing 3 and 20 times the Elwha River annual sediment load of 340,000 &plusmn; 80,000 t/y. During the study period, the discharge in the Elwha River was greater than normal (107% in year 1 and 108% in year 2); however, the magnitudes of the peak-flow events during the study period were relatively benign with the largest discharge of 292 m 3 /s (73% of the 2-year annual peak-flow event) early in the project when both extant reservoirs still retained sediment. Despite the muted peak flows, sediment transport was large, with measured suspended-sediment concentrations during the study period ranging from 44 to 16,300 mg/L and gauged bedload transport as large as 24,700 t/d. Five distinct sediment-release periods were identified when sediment loads were notably increased (when lateral erosion in the former reservoirs was active) or reduced (when reservoir retention or seasonal low flows and cessation of lateral erosion reduced sediment transport). Total suspended-sediment load was 930,000 t in year 1 and 5,400,000 t in year 2. Of the total 6,300,000 &plusmn; 3,200,000 t of suspended-sediment load, 3,400,000 t consisted of silt and clay and 2,900,000 t was sand. Gauged bedload on the lower Elwha River in year 2 of the project was 450,000 &plusmn; 360,000 t. Bedload was not quantified in year 1, but qualitative observations using bedload-surrogate instruments indicated detectable bedload starting just after full removal of the downstream dam. Using comparative studies from other sediment-laden rivers, the total ungauged fraction of < 2-mm bedload was estimated to be on the order of 1.5 Mt.

Washington