Results for “Circular”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 829 records · Page 46Linked to original sources

Level II scour analysis for Bridge 39 (PEACTH00620039) on Town Highway 62, crossing South Peacham Brook, Peacham, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure PEACTH00620039 on Town Highway 62 crossing South Peacham Brook, Peacham, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 9.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the left bank upstream and downstream of the bridge. The surface cover on the right bank upstream and downstream is shrubs and brush. In the study area, South Peacham Brook has an incised, straight channel with a slope of approximately 0.02 ft/ft, an average channel top width of 43 ft and an average bank height of 8 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 51.4 mm (0.168 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 23, 1995, indicated that the reach was stable. The Town Highway 62 crossing of South Peacham Brook is a 23-ft-long, one-lane bridge consisting of one 22-foot steel-beam span (Vermont Agency of Transportation, written communication, March 27, 1995). The opening length of the structure parallel to the bridge face is 20.1 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the computed openingskew-to-roadway is 10 degrees. The footing on the right abutment and the footing on the upstream left wingwall were exposed during the Level I assessment. The scour countermeasures at the site included type- 2 stone fill (less than 36 inches diameter) along the upstream and downstream right wingwalls and at the upstream end of the upstream left wingwall and at the downstream end of the downstream left wingwall. Type-3 stone fill (less than 48 inches diameter) was along the upstream left and right banks and the downstream right bank. On the downstream left bank, the scour countermeasure was a stone wall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.0 to 1.6 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 5.9 to 7.4 ft. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge, which is less than the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. However, there is a bedrock outcrop across the channel just upstream of the bridge. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 34 (CONCTH00110034) on Town Highway 11, crossing Miles Stream, Concord, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CONCTH00110034 on Town Highway 11 crossing Miles Stream, Concord, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 24.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is shrub and brush on the left bank upstream and downstream of the bridge. The surface cover on the right bank upstream is pasture while downstream it is forest. In the study area, Miles Stream has an incised, sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 48 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 102 mm (0.335 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 15, 1995, indicated that the reach was stable. The Town Highway 11 crossing of Miles Stream is a 38-ft-long, two-lane bridge consisting of one 36-foot concrete slab span (Vermont Agency of Transportation, written communication, March 16, 1995). The opening length of the structure parallel to the bridge face is 33.9 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening. The calculated opening-skewto-roadway is 25 degrees while the VTAOT determined opening-skew-to-roadway is 22 degrees. The scour countermeasures at the site included type-2 stone fill (less than 36 inches diameter) along the entire base length of all four wingwalls, scattered in front of the left and right abutments, and along the downstream left and right banks. Also, there is type-3 stone fill (less than 48 inches diameter) along the upstream left and right banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.3 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. The right abutment scour ranged from 7.4 to 9.6 ft while the left abutment scour ranged from 12.8 to 14.4 ft. The worst-case abutment scour for the left and right abutments occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. However, there is exposed bedrock in the channel upstream and downstream of the bridge. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 27 (STJOTH00080027) on Town Highway 8, crossing the Sleepers River, St. Johnsbury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STJOTH00080027 on Town Highway 8 crossing the Sleepers River, St. Johnsbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 40.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream right bank with some pasture on the upstream left bank. The downstream right overbank cover is comprised of cut grass, trees and shrubs while the immediate banks have dense woody vegetation. The downstream left bank is forested with some pasture. In the study area, the Sleepers River has an incised, sinuous channel with a slope of approximately 0.007 ft/ft, an average channel top width of 72 ft and an average bank height of 5 ft. The channel bed material ranges from gravel to cobble with a median grain size (D 50 ) of 48.5 mm (0.159 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 10, 1995, indicated that the reach was stable. The Town Highway 8 crossing of the Sleepers River is a 74-ft-long, two-lane bridge consisting of one 71-foot steel-beam span (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 68 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the computed openingskew-to-roadway is 45 degrees. The VTAOT database states the opening-skew-to-roadway as 30 degrees. A scour hole 2.5 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. There is also a three to four foot deep scour hole in the channel adjacent to the upstream right wingwall. The scour protection at the site included type-3 stone fill (less than 48 inches diameter) at the upstream end of the upstream left wingwall, at the downstream end of the downstream right wingwall, and along the downstream left bank. There was also type-2 stone fill (less than 36 inches diameter) at the downstream end of the downstream left wingwall, along the upstream left bank, and along the downstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour computed for all modelled flows was zero ft. Abutment scour ranged from 6.2 to 9.7 ft. The worst-case abutment scour occurred at the 100-year discharge at the right abutment and at the 500-year discharge at the left abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 36 (STOWTH00430036) on Town Highway 43, crossing Miller Brook, Stowe, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STOWTH00430036 on Town Highway 43 crossing the Miller Brook, Stowe, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north central Vermont. The 5.5-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is predominantly forested. In the study area, the Miller Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 43 ft and an average bank height of 7 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 70.4 mm (0.231 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 15, 1996, indicated that the reach was stable. The Town Highway 43 crossing of the Miller Brook is a 24-ft-long, two-lane bridge consisting of one 21-foot steel-beam span (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the bridge face is 21.5 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening and the computed opening-skew-to-roadway is also 10 degrees. The footing on the left abutment was exposed 2.5 ft and the footing on the right abutment was exposed 3.0 ft during the Level I assessment. Scour protection measures at the site were type-4 stone fill (less than 60 inches diameter) on the left and right bank upstream, type-3 stone fill (less than 48 inches diameter) along the entire base length of the upstream right wingwall, right abutment, and type-2 stone fill (less than 36 inches diameter) along the entire base length of the downstream right wingwall, and left and right banks downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.9 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.1 to 6.5 ft. The worst-case abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 37 (CABOTH00410037) on Town Highway 41, crossing the Winooski River, Cabot, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CABOTH00410037 on Town Highway 41 crossing the Winooski River (also referred to as Coit’s Pond Brook), Cabot, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 21.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is primarily shrub and brushland while the immediate banks have dense woody vegetation. In the study area, the Winooski River has an incised, straight channel with a slope of approximately 0.01 ft/ft, an average channel top width of 53 ft and an average bank height of 4 ft. The channel bed material is primarily cobbles and boulder with a median grain size (D 50 ) of 64.5 mm (0.212 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 16, 1996, indicated that the reach was stable. The Town Highway 41 crossing of the Winooski River is a 29-ft-long, one-lane bridge consisting of one 26-foot span (Vermont Agency of Transportation, written communication, October 13, 1995) with four steel I-beams and a wooden deck . The opening length of the structure parallel to the bridge face is 26 ft.The bridge is supported by “laid up” granite block abutments with concrete footings. The channel is skewed approximately 35 degrees to the opening while the computed opening-skew-to-roadway is 15 degrees. The VTAOT computed opening-skew-to-roadway is zero degrees. The only scour protection measure observed at the site during the Level I assessment was type-2 stone fill (less than 36 inches diameter) along the entire base length of the left abutment and upstream right wingwall, along the upstream left bank and along the downstream left and right banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping and maximum free-surface flow discharges were determined and analyzed as two other potential worst-case scour scenarios. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.7 ft. The worst-case contraction scour occurred at the maximum free-surface flow (with road overflow) discharge, which was less than the 100-year discharge. Abutment scour ranged from 9.8 to 10.7 ft along the left abutment and from 16.2 to 19.9 ft along the right abutment. The worstcase abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich and Hire equations (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 17 (SHEFTH00380017) on Town Highway 38, crossing Miller Run, Sheffield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure SHEFTH00380017 on Town Highway 38 crossing Miller Run, Sheffield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the White Mountain section of the New England physiographic province in northeastern Vermont. The 24.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture along the right bank while the immediate banks are covered by trees, shrubs, and brush. The surface cover along the left bank is grass and Route 122 with shrubs and brush along the immediate banks. In the study area, Miller Run has a sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 52 ft and an average bank height of 3 ft. The channel bed material ranges from sand to bedrock with a median grain size (D 50 ) of 80.5 mm (0.264 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 1, 1995, indicated that the reach was stable. The Town Highway 38 crossing of Miller Run is a 52-ft-long, one-lane bridge consisting of one 48-foot steel I-beam span with a wooden deck (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 42.4 ft. The bridge is supported by vertical, concrete abutments with wingwalls on the upstream end. The channel is skewed approximately 30 degrees to the opening while the computed opening-skew-to-roadway is 5 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed under the bridge during the Level I assessment. The only scour protection measure at the site was type-4 stone fill (less than 60 inches diameter) at the upstream end of the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for modelled flows ranged from 0.0 to 2.4 ft. Abutment scour ranged from 6.1 to 7.9 ft at the left abutment and 11.4 to 17.4 ft at the right abutment. The worstcase contraction and abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 5 (MORRTH00060005) on Town Highway 6, crossing Bedell Brook, Morristown, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure MORRTH00060005 on Town Highway 6 crossing Bedell Brook, Morristown, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 6.28-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of pasture, shrubs, and brushland. In the study area, Bedell Brook has a sinuous channel with a slope of approximately 0.01 ft/ ft, an average channel top width of 56 ft and an average bank height of 4 ft. The predominant channel bed material is gravel with a median grain size (D 50 ) of 35.8 mm (0.117 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 16, 1996, indicated that the reach was laterally unstable. There are wide point bars and cut-banks with slipping bank material noted upstream and downstream of this site. The Town Highway 6 crossing of Bedell Brook is a 44-ft-long, two-lane bridge consisting of one 42-foot concrete T-beam span (Vermont Agency of Transportation, written communication, October 26, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole up to 1.5 ft deeper than the mean thalweg depth was observed along the left abutment and upstream and downstream left wingwalls during the Level I assessment. The scour protection measure at this site was type-4 stone fill (less than 60 inches diameter) on the left bank and left wingwall upstream, the left abutment and the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.1 to 2.0 feet. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.9 to 8.6 feet. The worst-case abutment scour occurred at the 500-year event. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 39 (STOWTH00160039) on Town Highway 16, crossing Moss Glen Brook, Stowe, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STOWTH00160039 on Town Highway 16 crossing Moss Glen Brook, Stowe, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 4.75-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream and on the right bank downstream. The downstream left bank is pasture while the immediate bank has dense woody vegetation. In the study area, Moss Glen Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 52 ft and an average bank height of 7 ft. The channel bed material ranges from sand to cobble with a median grain size (D 50 ) of 56.5 mm (0.185 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 10, 1996, indicated that the reach was stable. The Town Highway 16 crossing of Moss Glen Brook is a 22-ft-long galvanized plate arch culvert with an opening span width of 21 ft (Vermont Agency of Transportation, written communication, October 13, 1995). The opening length of the structure parallel to the culvert face is 20.6 ft. The culvert is supported by vertical, concrete abutments with no wingwalls. The channel is skewed approximately zero degrees to the opening. The opening skew-to-roadway value from the VTAOT database is 5 degrees while zero degrees was computed from surveyed points. The only scour counter measure at the site was type-3 stone fill (less than 48 inches diameter) at the upstream and downstream ends of the left and right abutments and extending along the banks upstream and downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 12.6 to 16.2 ft. Right abutment scour ranged from 12.1 to 14.3 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 23 (WEELTH00210023) on Town Highway 21, crossing Miller Run, Wheelock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WEELTH00210023 on Town Highway 21 crossing Miller Run, Wheelock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 28.3-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest on the upstream and downstream right banks while the surface cover on the upstream and downstream left banks consists primarily of short grass and buildings with shrubs, brush and trees along the immediate banks. In the study area, Miller Run has an incised, straight channel with a slope of approximately 0.003 ft/ft, an average channel top width of 76 ft and an average bank height of 6 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 67.5 mm (0.221 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 2, 1995, indicated that the reach was stable. The Town Highway 21 crossing of Miller Run is a 46-ft-long, one-lane bridge consisting of one 43-foot steel-beam span with a wooden deck (Vermont Agency of Transportation, written communication, April 5, 1995). The opening length of the structure parallel to the bridge face is 42.1 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening while the computed opening-skew-to-roadway is 25 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed under the bridge, along the center of the channel, during the Level I assessment. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along the downstream left bank and along the entire base length of the upstream and downstream right wingwalls. Type-3 stone fill (less than 48 inches diameter) protection was observed along the upstream end of the upstream left wingwall and randomly scattered along the left abutment. Type-4 stone fill (less than 60 inches diameter) protection was observed along the entire base length of the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was computed to be zero ft. Abutment scour ranged from 9.1 to 10.8 ft along the right abutment and from 9.8 to 12.3 ft along the left abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 25 (DANVTH00610025) on Town Highway 61, crossing Water Andric Brook, Danville, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure DANVTH00610025 on Town Highway 61 crossing Water Andric Brook, Danville, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 9.69-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the downstream left bank while the upstream right bank is grass with trees along the immediate banks. The downstream right bank and upstream left bank are forested. In the study area, Water Andric Brook has a straight channel with a slope of approximately 0.007 ft/ft, an average channel top width of 45 ft and an average bank height of 4 ft. The predominant channel bed material is gravel with a median grain size (D 50 ) of 53.4 mm (0.175 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 22, 1995, indicated that the reach was stable. The Town Highway 61 crossing of Water Andric Brook is a 24-ft-long, two-lane bridge consisting of one 22-foot concrete slab span (Vermont Agency of Transportation, written communication, March 24, 1995). The opening length of the structure parallel to the bridge face is 22.9 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening and the computed opening-skewto-roadway is 5 degrees. The VTAOT computed opening-skew-to-roadway is zero degrees. A scour hole 0.5 ft deeper than the mean thalweg depth was observed along the upstream half of the left abutment during the Level I assessment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) at the upstream end of the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.7 to 1.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 9.1 to 12.5 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 39 (TOPSTH00510039) on Town Highway 51, crossing Tabor Branch Waits River, Topsham, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure TOPSTH00510039 on Town Highway 51 crossing the Tabor Branch Waits River, Topsham, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 17.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is predominantly pasture. However, beyond one bridge length on the right bank upstream the surface cover abruptly changes to forest. In the study area, the Tabor Branch Waits River has a sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 53 ft and an average bank height of 6 ft. The predominant channel bed material is cobbles with a median grain size (D 50 ) of 86.4 mm (0.283 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 30, 1995, indicated that the reach was stable. The Town Highway 51 crossing of the Tabor Branch Waits River is a 34-ft-long, one-lane bridge consisting of one 32-foot concrete slab span (Vermont Agency of Transportation, written communication, March 28, 1995). The opening length of the structure parallel to the bridge face is 31.0 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 10 degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the left and right bank upstream, along the base of the upstream left wingwall, upstream right wingwall, left abutment, right abutment, downstream left wingwall, downstream right wingwall, and along the left and right bank downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.4 ft. The worst-case contraction scour occurred at the maximum free surface flow discharge, which was less than the 100-year discharge. Abutment scour ranged from 4.8 to 8.0 ft. The worst-case abutment scour occurred at 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 50 (STARTH00250050) on Town Highway 25, crossing Lewis Creek, Starksboro, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STARTH00250050 on Town Highway 25 crossing Lewis Creek, Starksboro, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in west-central Vermont. The 10.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the left bank downstream and upstream of the bridge. On the right bank upstream and downstream of the bridge the surface cover is forest. In the study area, Lewis Creek has an incised, straight channel with a slope of approximately 0.007 ft/ft, an average channel top width of 64 ft and an average bank height of 7 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 35.4 mm (0.116 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 12, 1996, indicated that the reach was stable. The Town Highway 25 crossing of Lewis Creek is a 28-ft-long, one-lane bridge consisting of one 25-foot steel-beam span (Vermont Agency of Transportation, written communication, December 15, 1995). The opening length of the structure parallel to the bridge face is 23.8 ft. The bridge is supported by vertical, concrete abutments with wingwalls on all corners except the downstream left. The channel is skewed approximately zero degrees to the opening and the opening-skew-to-roadway is also zero degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. Also, the footing is exposed along the left and right abutments and all three wingwalls. The scour countermeasures at the site included type-1 stone fill (less than 12 inches diameter) along the left abutment and type-2 stone fill (less than 36 inches diameter) along the right abutment and the upstream and downstream right wingwalls. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 5.2 to 9.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 13.1 to 18.2 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 21 (WALDTH00450021) on Town Highway 45, crossing Joes Brook, Walden, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WALDTH00450021 on Town Highway 45 crossing Joes Brook, Walden, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The VTAOT files state that the stream is Coles Brook, both the USGS and the VTAOT maps state that it is Joes Brook. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 18.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Joes Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 76 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 75.4 mm (0.247 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 27, 1995, indicated that the reach was stable. The Town Highway 45 crossing of Joes Brook is a 35-ft-long, one-lane bridge consisting of one 29-foot steel-beam span with a wooden deck (Vermont Agency of Transportation, written communication, April 5, 1995). The opening length of the structure parallel to the bridge face is 26.2 ft. The bridge is supported by vertical, “laid-up” concrete block abutments with no wingwalls. The channel is skewed approximately zero degrees to the opening while the computed opening-skew-to-roadway is 5 degrees. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream left bank and along the entire base length of the left abutment. There is also type-2 stone fill (less than 36 inches diameter) along the entire base length of the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 12.4 to 24.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 7 (WARRTH00010007) onTown Highway 1, crossing Freemans Brook, Warren, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WARRTH00010007 on Town Highway 1 crossing Freeman Brook, Warren, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 6.45-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the predominant surface cover is grass and trees with the exception of the upstream left overbank which is forest. The banks of the channel are tree covered. In the study area, Freeman Brook has an incised, straight channel with a slope of approximately 0.03 ft/ft, an average channel top width of 51 ft and an average channel depth of 6 ft. The predominant channel bed material ranges from gravel to bedrock with a median grain size (D 50 ) of 86.8 mm (0.285 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 22, 1996 indicated that the reach was stable. The Town Highway 1 crossing of Freeman Brook is a 64-ft-long, two-lane bridge consisting of one 62-foot steel-beam span (Vermont Agency of Transportation, written communication, February 1, 1996). The bridge is supported by vertical, concrete abutments with spill-through slopes. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 30 degrees. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the entire length of the left and right abutments and along the downstream channel banks. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. The computed contraction scour for all modelled flows was 0.0 feet. Abutment scour ranged from 5.3 to 8.2 ft. The worst-case abutment scour occurred at the right abutment for the incipient-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 33 (TUNBTH00450033) on Town Highway 45, crossing the First Branch White River, Tunbridge, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure TUNBTH00450033 on Town Highway 45 crossing the First Branch White River, Tunbridge, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 86.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge, while woody vegetation sparsely covers the immediate banks. In the study area, the First Branch White River has an incised, sinuous channel with a slope of approximately 0.003 ft/ft, an average channel top width of 68 ft and an average bank height of 7 ft. The channel bed material ranges from sand to gravel with a median grain size (D 50 ) of 27.1 mm (0.089 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 18, 1995, indicated that the reach was laterally unstable due to a cut-bank present on the upstream right bank and a wide channel bar in the upstream reach. The Town Highway 45 crossing of the First Branch White River is a 67-ft-long, one-lane bridge consisting of one 54-foot timber thru-truss span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 53.5 ft. The bridge is supported on the right by a vertical, concrete abutment with an upstream wingwall, and on the left by a vertical, stone abutment. The channel is skewed approximately 20 degrees to the opening while the computed opening-skew-to-roadway is 10 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. Scour countermeasures at the site include type-1 stone fill (less than 12 inches diameter) along the upstream right wingwall, type-2 stone fill (less than 36 inches diameter) along the right abutment, and type-3 stone fill (less than 48 inches diameter) along the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge was determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 3.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 12.8 to 31.0 ft. Right abutment scour ranged from 9.8 to 19.0 ft. The worst-case left and right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in Tables 1 and 2. A cross-section of the scour computed at the bridge is presented in Figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 65 (NEWBTH00500065) on Town Highway 50, crossing Peach Brook, Newbury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NEWBTH00500065 on Town Highway 50 crossing Peach Brook, Newbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 15.3-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest upstream of the bridge and shrub and brushland downstream of the bridge. In the study area, Peach Brook has an incised, sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 40 ft and an average bank height of 8 ft. The channel bed material ranges from cobble to boulder with a median grain size (D50) of 83.1 mm (0.273 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 29, 1995, indicated that the reach was stable. The Town Highway 50 crossing of the Peach Brook is a 29-ft-long, two-lane bridge consisting of one 25-foot steel-beam span (Vermont Agency of Transportation, written communication, March 27, 1995). The opening length of the structure parallel to the bridge face is 24.9 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 50 degrees to the opening while the computed openingskew-to-roadway is 20 degrees. A channel scour hole 0.75 ft deeper than the mean thalweg depth was observed under the bridge during the Level I assessment. Also observed was channel scour 0.75 ft deeper than the mean thalweg at the upstream face of the bridge and channel scour 0.25 ft deeper than the mean thalweg along the right bank downstream. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) along the upstream and downstream right wingwalls and type-2 stone fill (less than 36 inches diameter) along the upstream right bank and along the downstream left wingwall and bank. In addition, there are four 3 ft square concrete blocks at the corner where the upstream right wingwall joins the right abutment. The upstream left wingwall and upstream half of the left abutment were constructed on top of a bedrock outcrop. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.3 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. The right abutment scour ranged from 6.1 to 7.2 ft. The worstcase right abutment scour occurred at the incipient roadway-overtopping discharge. The left abutment scour ranged from 7.1 to 10.3 ft. The worst-case left abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented he

Vermont↗

Level II scour analysis for Bridge 16 (GROTTH00170016) on Town Highway 17, crossing the Wells River, Groton, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure GROTTH00170016 on Town Highway 17 crossing the Wells River, Groton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in eastern Vermont. The 43.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is predominantly shrub and brushland, while the left bank downstream is forested. In the study area, the Wells River has an incised, straight channel with a slope of approximately 0.003 ft/ft, an average channel top width of 57 ft and an average bank height of 4 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 77.8 mm (0.255 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 29, 1995, indicated that the reach was stable. The Town Highway 17 crossing of the Wells River is a 43-ft-long, one-lane bridge consisting of one 41-foot steel-beam span with a concrete deck (Vermont Agency of Transportation, written communication, March 24, 1995). The opening length of the structure parallel to the bridge face is 39.4 ft. The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 0 degrees and the opening-skew-toroadway is also zero degrees. A scour hole 1.7 ft deeper than the mean thalweg depth was observed from 30 ft upstream to 70 ft downstream in mid-channel during the Level I assessment. Scour protection measures at the site included: type-3 stone fill (less than 48 inches diameter) along the left and right bank upstream, and along the left and right bank downstream. The protection along the banks begins in the road embankment areas where the wingwalls would be located. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was 0 ft. Abutment scour ranged from 7.6 to 8.4 ft at the left abutment and from 9.9 to 14.8 ft at the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 71 (WODSTH00050071) on Town Highway 5, crossing Kedron Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00050071 on Town Highway 5 crossing Kedron Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 16.1-mi 2 drainage area is in a predominantly rural and forested basin. However, the bridge site is within the Village of Woodstock. In the vicinity of the study site, the surface cover is best described as suburban downstream of the bridge and forest and brush upstream of the bridge. In the study area, Kedron Brook has an incised, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 33 ft and an average bank height of 11 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 112 mm (0.368 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 14, 1994, indicated that the reach was vertically degraded. Evidence of the degradation was observed at the outlet of the bridge where the stream bed is 4 ft below the downstream invert of the structure (see figure 6). The Town Highway 5 crossing of Kedron Brook is a 30-ft-long, two-lane bridge/box culvert consisting of one 25-foot concrete span (Vermont Agency of Transportation, written communication, August 3, 1994). The opening length of the structure parallel to the bridge face is 23.5 ft.The bridge is supported by vertical, concrete abutments with wingwalls. The channel bed under the bridge is covered entirely by a concrete slab. The channel is skewed approximately 45 degrees to the opening and the opening-skew-to-roadway is also 45 degrees. Scour countermeasures at the site include concrete retaining walls on both the left and right downstream banks extending approximately 130 ft downstream; a drywall constructed of stone on the upstream right bank extending to the next bridge upstream; type-2 stone fill (less than 36 inches diameter) along the upstream left bank, at the upstream end of the upstream right wingwall, and along the base of the retaining wall on the downstream left bank; and type-3 stone-fill (less than 48 inches diameter) along the base of the retaining wall on the downstream right bank. In addition, the channel under the bridge is concrete. Further details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. In addition, the incipient roadway-overtopping discharge is determined and analyzed as another potential worst-case scour scenario. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 2.5 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. The contraction scour depths do not take the concrete channel bed under the bridge into account. Abutment scour ranged from 8.7 to 18.2 ft. The worstcase abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scouredstreambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particlesize distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗