Level II scour analysis for Bridge 30 (NEWFVT00300013) on Vermont Highway 30, crossing Smith Brook, Newfane, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NEWFVT00300013 on State Route 30 crossing Smith Brook, Newfane, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 9.38-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is grass and shrubs except for the upstream right bank which is forested. In the study area, Smith Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 53 ft and an average bank height of 5 ft. The channel bed material is predominantly cobbles with a median grain size (D 50 ) of 79.5 mm (0.261 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 20, 1996, indicated that the reach was stable. The State Route 30 crossing of Smith Brook is a 69-ft-long, two-lane bridge consisting of one 66-foot steel-beam span (Vermont Agency of Transportation, written communication, March 30, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 45 degrees to the opening while the opening-skew-to- roadway is 55 degrees. The scour protection measures at the site were type-1 stone fill (less than 12 inches diameter) along the upstream right bank. There was also type-2 stone fill (less than 36 inches diameter) along the upstream left bank. A stone wall extends to 72 feet upstream from the end of the upstream left wingwall. There is another stone wall along the upstream right bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 14.4 to 18.2 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 39 (LOWETH00080039) on Town Highway 8, crossing Potter Brook, Lowell, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure LOWETH00080039 on Town Highway 8 crossing Potter Brook, Lowell, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 4.69-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of shrub and brushland, except for the left overbank upstream which is forest. In the study area, Potter Brook has a sinuous channel with a slope of approximately 0.004 ft/ft, an average channel top width of 34 feet and an average bank height of 3 ft. The predominant channel bed materials are gravel and sand with a median grain size (D 50 ) of 18.7 mm (0.0613 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 15, 1995, indicated that the reach was laterally unstable. This assessment of the reach was primarily due to the meandering of the channel with cut-banks and narrow point bars and the fine bank and bed material near the site. The Town Highway 8 crossing of Potter Brook is a 23-ft-long, one-lane bridge consisting of one 21-foot steel-beam span (Vermont Agency of Transportation, written communication, March 7, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening while the opening-skew-toroadway is zero degrees. A scour hole 2.0 feet deeper than the mean thalweg depth was observed along the left abutment during the Level I assessment. There were no scour protection measures evident at the site. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 1.8 to 5.5 feet. The worst-case abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Changes in streamflow seasonality associated with hydroclimatic variability in the north-central United States among three discrete temporal periods, 1946–2020

Study region North-central United States Study focus This study uses circular statistics to characterize the seasonal properties of annual maximum (AMS) and peaks-over-threshold (POT) streamflow time series for 841 and 623 selected U.S. Geological Survey (USGS) streamgages, respectively, without regulation or substantial diversion among common 75-, 50-, and 30-year trend periods through water year 2020 (the period from October 1, 2019, through September 30, 2020). A subset of AMS time series with detected change points (abrupt changes) in the median and (or) scale are analyzed on either side of the change point to evaluate changes in their circular statistics. New hydrologic insights for the region In the 50-year trend period, five regions share common mean flood timing in the AMS and POT partial duration series. Changes from asymmetric distributions to reflective symmetric distributions are detected particularly among the 50- and 30-year trend periods in the northernmost States of Minnesota, North Dakota, and Wisconsin. For the subset of streamgages with abrupt change points in the AMS, regional patterns of changes in seasonality are detected between the period of records before and after the change point. These findings can inform decisions related to the AMS used for flood frequency and potential mixed population analyses and flood control operations that may be affected by changes in when seasonal events occur, how long seasonal events last, and the long-term variability in the intensity and frequency of seasonal events.

Illinois, Iowa, Michigan, Minnesota, Missouri, Mon

Geologic Map of MTM 35337, 40337, and 45337 Quadrangles, Deuteronilus Mensae Region of Mars

Deuteronilus Mensae, first defined as an albedo feature at lat 35.0 deg N., long 5.0 deg E., by U.S. Geological Survey (USGS) and International Astronomical Union (IAU) nomenclature, is a gradational zone along the dichotomy boundary in the northern mid-latitudes of Mars. The boundary in this location includes the transition from the rugged cratered highlands of Arabia Terra to the northern lowland plains of Acidalia Planitia. Within Deuteronilus Mensae, polygonal mesas are prominent along with features diagnostic of Martian fretted terrain, including lobate debris aprons, lineated valley fill, and concentric crater fill. Lobate debris aprons, as well as the valley and crater fill deposits, are geomorphic indicators of ground ice, and their concentration in Deuteronilus Mensae is of great interest because of their potential association with Martian climate change. The paucity of impact craters on the surfaces of debris aprons and the presence of ice-cemented mantle material imply young (for example, Amazonian) surface ages that are consistent with recent climate change in this region of Mars. North of Deuteronilus Mensae are the northern lowlands, a potential depositional sink that may have had large standing bodies of water or an ocean in the past. The northern lowlands have elevations that are several kilometers below the ancient cratered highlands with significantly younger surface ages. The morphologic and topographic characteristics of the Deuteronilus Mensae region record a diverse geologic history, including significant modification of the ancient highland plateau and resurfacing of low-lying regions. Previous studies of this region have interpreted a complex array of geologic processes, including eolian, fluvial and glacial activity, coastal erosion, marine deposition, mass wasting, tectonic faulting, effusive volcanism, and hydrovolcanism. The origin and age of the Martian crustal dichotomy boundary are fundamental questions that remain unresolved at the present time. Several scenarios for its formation, including single and multiple large impact events, have been proposed and debated in the literature. Endogenic processes whereby crust is thinned by internal mantle convection and tectonic processes have also been proposed. Planetary accretion models and isotopic data from Martian meteorites suggest that the crust formed very early in Martian history. Using populations of quasi-circular depressions extracted from the topography of Mars, other studies suggest that the age difference between the highlands and lowlands could be ~100 m.y.. Furthermore, understanding the origin and age of the dichotomy boundary has been made more complicated due to significant erosion and deposition that have modified the boundary and its adjacent regions. The resulting diversity of terrains and features is likely a combined result of ancient and recent events. Detailed geologic analyses of dichotomy boundary zones are important for understanding the spatial and temporal variations in highland evolution. This information, and comparisons to other highland regions, can help elucidate the scale of potential environmental changes. Previous geomorphic and geologic mapping investigations of the Deuteronilus Mensae region have been completed at local to global scales. The regional geology was first mapped by Lucchitta (1978) at 1:5,000,000 scale using Mariner 9 data. This study concluded that high crater flux early in Martian history formed overlapping craters and basins that were later filled by voluminous lava flows that buried the impacted surface, creating the highlands. After this period of heavy bombardment, fluvial erosion of the highlands formed the canyons and valleys, followed by dissection that created the small mesas and buttes, and later, formation of the steep escarpment marking the present-day northern highland margin. After valley dissection, mass wasting and eolian processes caused lateral retreat of mesas and buttes

Scientific Investigations Map

Level II scour analysis for Bridge 37 (BRIDTH00050037) on Town Highway 5, crossing North Branch Ottauquechee River, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00050037 on town highway 5 crossing the North Branch Ottauquechee River, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 10.5-mi 2 drainage area is a predominantly rural basin. In the vicinity of the study site, the left and right banks are forested. Town highway 5 runs parallel to the upstream left and downstream right banks. In the study area, the North Branch Ottauquechee River has a sinuous channel with a slope of approximately 0.013 ft/ft, an average channel top width of 50 ft and an average channel depth of 5 ft. The predominant channel bed materials are gravel and cobble (D 50 is 79.3 mm or 0.260 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 2, 1994, indicated that the reach was stable. The town highway 5 crossing of the North Branch Ottauquechee Riveris a 38-ft-long, onelane bridge consisting of one 35-foot steel beam span (Vermont Agency of Transportation, written commun., August 25, 1994). The bridge is supported by vertical, stone abutments with wingwalls. The right abutment has settled due to scour. Type-3 stone fill (less than 36 inches diameter) provides protection to the upstream end of the upstream left wingwall and the base of the downstream right wingwall. The channel is skewed approximately 35 degrees; the opening-skew-to-roadway is 20 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendix E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.4 to 1.5 ft. The worst-case contraction scour occurred at the incipient overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 11.0 to 14.9 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 29 (CRAFTH00550029) on Town Highway 55, crossing the Black River, Craftsbury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CRAFTH00550029 on town highway 55 crossing the Black River, Craftsbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province of north-central Vermont in the town of Craftsbury. The 24.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have woody vegetation coverage except for the upstream left bank and the downstream right bank, which have more brush cover than trees. In the study area, the Black River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 41 ft and an average channel depth of 5.5 ft. The predominant channel bed material is sand and gravel (D 50 is 44.7 mm or 0.147 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 7, 1995, indicated that the reach was stable. The town highway 55 crossing of the Black Riveris a 32-ft-long, one-lane bridge consisting of one 28-foot span steel stringer superstructure with a timber deck (Vermont Agency of Transportation, written communication, August 4, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 10 degrees. A scour hole 2 ft deeper than the mean thalweg depth was evident at mid-channel immediately downstream of the bridge during the Level I assessment. The only scour protection measure at the site was type-1 stone fill (less than 12 inches diameter) on the upstream right bank and road approach embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.9 to 1.4 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 12.1 to 15.5 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 36 (RICHVT01050036) on State Route 105, crossing Stanhope Brook, Richford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RICHVT01050036 on State Route 105 crossing Stanhope Brook, Richford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 7.03-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is short grass except for the upstream left overbank area which is forested. In the study area, Stanhope Brook has a steep, sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 47 ft and an average channel depth of 5 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 132 mm (0.432 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 28, 1995, indicated that the reach was laterally unstable. The State Route 105 crossing of Stanhope Brook is a 42-ft-long, two-lane bridge consisting of one 38-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 8, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is 20 degrees. A scour hole 0.5 ft deeper than the mean thalweg depth was observed along the downstream end of the right abutment wall during the Level I assessment. The scour protection measures at this site were type-2 stone fill (less than 36 inches diameter) along the entire lengths of the upstream wingwalls, at the corner of the downstream left abutment and downstream left wingwall and the downstream end of the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 6.6 to 9.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 4 (ARLITH00010004) on Town Highway 1, crossing Warm Brook, Arlington, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ARLITH00010004 on Town Highway 1 crossing Warm Brook, Arlington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Taconic section of the New England physiographic province in southwestern Vermont. The 12.1-mi 2 drainage area consists of a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is brush except for the upstream and downstream right banks which are covered by brush and grass. In the study area, Warm Brook has an incised, straight channel with a slope of approximately 0.003 ft/ft, an average channel top width of 19 ft and an average bank height of 1 ft. The channel bed material ranges from sand to cobble with a median grain size (D 50 ) of 33.3 mm (0.109 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 30, 1996, indicated that the reach was stable. The Town Highway 1 crossing of Warm Brook is a 49-ft-long, two-lane bridge consisting of one 44-foot steel-beam span (Vermont Agency of Transportation, written communication, January 30, 1996). The bridge is supported by vertical, concrete abutments with wingwalls. The abutments have been placed on top of the previous stone abutments. The channel is skewed approximately 0 degrees to the opening while the opening-skew-to- roadway is 20 degrees. A scour hole approximately 1.0 ft deeper than the mean thalweg depth was observed mid- channel in the upstream reach within 30 ft of the bridge. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream left bank approach to the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.7 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.3 to 11.9 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 15 (GRNVTH00230015) on Town Highway 23, crossing the Third Branch of the White River, Granville, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure GRNVTH00230015 on town highway 23 crossing the Third Branch of the White River, Granville, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Granville. The 23.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have woody vegetation coverage except for the downstream banks, which are residential. In the study area, the Third Branch of the White River has an incised, sinuous channel with a slope of approximately 0.0128 ft/ft, an average channel top width of 42 ft and an average channel depth of 4 ft. The predominant channel bed material is cobble (D 50 is 108 mm or 0.353 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 21, 1994, indicated that the reach was laterally unstable. The town highway 23 crossing of the Third Branch of the White River is a 35-ft-long, one-lane bridge consisting of one 31-foot steel beam span (Vermont Agency of Transportation, written communication, August 26, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 10 degrees. The only scour protection measures in place at the site were type-1 stone fill (less than 12 inches diameter) along the upstream right bank, upstream right wingwall, and right abutment. Retaining walls are in place along the upstream left bank up to the upstream end of the upstream left wingwall and both downstream banks with the left bank wall extending from the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute scour depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0 to 0.4 ft. The worst-case contraction scour occurred at the incipient overtopping discharge. Abutment scour ranged from 9.8 to 13.9 ft. The worst-case abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 6 (MORRTH00030006) on Town Highway 3, crossing Ryder Brook, Morristown, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure MORRTH00030006 on Town Highway 3 crossing Ryder Brook, Morristown, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in north-central Vermont. The 19.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover also is forested. In the study area, Ryder Brook has a straight channel with an average channel top width of 450 ft and an average bank height of 7 ft. The predominant channel bed material is silt and clay with a median grain size (D 50 ) of 0.0719 mm (0.000236 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 18, 1996, indicated that the reach was aggraded, but the channel through the bridge was scoured. The Town Highway 3 crossing of Ryder Brook is a 72-ft-long, two-lane bridge consisting of one 70-foot steel-beam span (Vermont Agency of Transportation, written communication, January 31, 1996). The bridge is supported by vertical, concrete abutments with spill-through embankments and wingwalls. The channel is not skewed to the opening and the opening-skew-to-roadway is zero degrees. Channel scour under the bridge was evident at this site during the Level I assessment. The depth of the channel increases from 3 feet at the upstream bridge face to 10 feet at the downstream bridge face. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) on the spill-through embankments of each abutment, the upstream road embankments and the downstream left road embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 20.4 to 25.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.3 to 10.5 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 53 (WILMVT01000053) on State Route 100, crossing Cold Brook, Wilmington, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WILMVT01000053 on State Route 100 crossing Cold Brook, Wilmington, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south-central Vermont. The 8.38-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover predominantly is pasture except for the immediate channel banks, which are tree covered. In the study area, Cold Brook has a straight channel with a slope of approximately 0.04 ft/ft, an average channel top width of 63 feet and an average bank height of 9 feet. The channel is constructed with stone fill completely covering both banks for 300 feet upstream of the site. The predominant channel bed materials are gravel and cobbles with a median grain size (D 50 ) of 66.2 mm (0.217 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 7, 1996, indicated that the reach was constructed. The State Route 100 crossing of Cold Brook is a 23-ft-long, two-lane bridge divided by a median strip consisting of one 20-foot concrete span (Vermont Agency of Transportation, written communication, November 1, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is not skewed to the opening and the opening-skew- to-roadway also is zero degrees. The scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) on the upstream banks, the upstream wingwalls, and the downstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.6 to 2.7 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 4.8 to 10.9 ft. The worst-case abutment scour occurred at the left abutment for the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Science and the storms: The USGS response to the hurricanes of 2005

This report is designed to give a view of the immediate response of the U.S. Geological Survey (USGS) to four major hurricanes of 2005: Dennis, Katrina, Rita, and Wilma. Some of this response took place days after the hurricanes; other responses included fieldwork and analysis through the spring. While hurricane science continues within the USGS, this overview of work following these hurricanes reveals how a Department of the Interior bureau quickly brought together a diverse array of its scientists and technologies to assess and analyze many hurricane effects. Topics vary from flooding and water quality to landscape and ecosystem impacts, from geotechnical reconnaissance to analyzing the collapse of bridges and estimating the volume of debris. Thus, the purpose of this report is to inform the American people of the USGS science that is available and ongoing in regard to hurricanes. It is the hope that such science will help inform the decisions of those citizens and officials tasked with coastal restoration and planning for future hurricanes. Chapter 1 is an essay establishing the need for science in building a resilient coast. The second chapter includes some hurricane facts that provide hurricane terminology, history, and maps of the four hurricanes’ paths. Chapters that follow give the scientific response of USGS to the storms. Both English and metric measurements are used in the articles in anticipation of both general and scientific audiences in the United States and elsewhere. Chapter 8 is a compilation of relevant ongoing and future hurricane work. The epilogue marks the 2-year anniversary of Hurricane Katrina. An index of authors follows the report to aid in finding articles that are cross-referenced within the report. In addition to performing the science needed to understand the effects of hurricanes, USGS employees helped in the rescue of citizens by boat and through technology by “geoaddressing” 911 calls after Katrina and Rita so that other rescuers could find persons trapped in attics and porches. They also delivered food and water to residents stranded along the lower Mississippi River for several days. That work is reported in chapter 3 of this volume. A great number of scientists contributed to this peer-reviewed report designed for a general audience. Because they work for USGS—an unbiased, multidisciplinary science organization that focuses on biology, geography, geology, geospatial information, and water—they are dedicated to the timely, relevant, and impartial study of the landscape and natural resources of the Nation, as well as natural hazards, like hurricanes, that threaten the Nation. To learn more about their work, visit the USGS Web site (www.usgs.gov).

Circular

Level II scour analysis for Bridge 145 (HANCVT01000145) on Vermont Highway 100, crossing the Hancock Branch of the White River, Hancock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HANCVT01000145 on State Route 100 crossing the Hancock Branch of the White River, Hancock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 22.0-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is urban on left bank and forested on the right bank upstream of the bridge while the immediate banks have woody vegetation. Downstream of the bridge surface cover on both banks is pasture while the immediate banks have woody vegetation. In the study area, the Hancock Branch of the White River has an incised, sinuous channel with a slope of approximately 0.006 ft/ft, an average channel top width of 48 ft and an average channel depth of 3 ft. The predominant channel bed materials are cobble and gravel with a median grain size (D 50 ) of 71.9 mm (0.236 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 16, 1994, indicated that the reach was stable. State Route 100 crossing the Hancock Branch of the White River is a 55-ft-long, two-lane bridge consisting of one 53-foot steel-beam span (Vermont Agency of Transportation, written communication, August 26, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is not skewed to the opening and the opening-skewto-roadway is 0 degrees. The only scour protection measures at the site were type-3 stone fill (less than 48 inches diameter) at the upstream right wingwall, both downstream wingwalls and the downstream ends of both abutments. Also there was type-2 stone fill (less than 36 inches diameter) at the upstream left wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 3.4 to 4.3 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.2 to 11.1 ft. The worst-case abutment scour occurred at the 100-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 28 (HARDTH00300028) on Town Highway 30, crossing the Lamoille River, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00300028 on town highway 30 crossing the Lamoille River, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 63.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover upstream and on the downstream right is primarily pasture with some row crops. Trees line the immediate channel banks. The left bank downstream surface cover is primarily brush. In the study area, the Lamoille River has an incised, sinuous channel with a slope of approximately 0.002 ft/ft, an average channel top width of 76 ft and an average bank height of 6 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 46.6 mm (0.153 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 25, 1995, indicated that the reach was laterally unstable. The site was revisited on August 21, 1995, after the August 5-6, 1995 flood on the Lamoille River. Findings from this follow-up visit are presented in Appendix G. The town highway 30 crossing of the Lamoille River is a 54-ft-long, one-lane bridge consisting of one 52-foot steel-beam span (Vermont Agency of Transportation, written communication, April 3, 1995). The bridge is supported by vertical, stone abutments with wingwalls. Scour, about one foot below the mean thalweg, exists along the right abutment and right upstream wingwall. Sheet piling has been driven around the right abutment and wingwalls and filled with concrete. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.9 to 2.5 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 11.2 to 17.8 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 38 (ANDOVT00110038) on State Route 11, crossing the Middle Branch Williams River, Andover, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ANDOVT00110038 on State Route 11 crossing the Middle Branch Williams River, Andover, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in south central Vermont. The 5.65-mi 2 drainage area is in a predominantly rural and forested basin. Upstream and downstream of the study site banks and overbanks are forested. In the study area, the Middle Branch Williams River has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 44 ft and an average bank height of 4 ft. The channel bed material ranges from gravel to boulders with a median grain size (D 50 ) of 54.0 mm (0.177 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 5, 1996, indicated that the reach was stable. The State Route 11 crossing of the Middle Branch Williams River is a 33-ft-long, two-lane bridge consisting of one 31-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 29, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 55 degrees to the opening while the measured opening-skew-to-roadway is 45 degrees. There were no scour problems observed during the Level I assessment. Type-4 stone fill (less than 60 inches diameter) and type-3 stone fill (less than 48 inches diameter) was present on the left bank upstream and right bank upstream respectively. Type-2 stone fill (less than 36 inches diameter) was present in the upstream left wing wall area. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.8 to 3.4 ft. The worst-case contraction scour occurred at the 500-year flow. Abutment scour ranged from 12.0 to 14.0 ft. The worst-case abutment scour occurred at the 500-year flow at the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 4 (MNTGTH00020004) on Town Highway 2, crossing Wade Brook, Montgomery, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure MNTGTH00020004 on town highway 2 crossing Wade Brook, Montgomery, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of north-central Vermont in the town of Montgomery. The 1.68-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have woody vegetation coverage. In the study area, Wade Brook has an incised, sinuous channel with a slope of approximately 0.0454 ft/ft, an average channel top width of 30 ft and an average channel depth of 2 ft. The predominant channel bed materials are gravel and cobbles (D 50 is 77.7 mm or 0.255 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 8, 1994, indicated that the reach was degraded. There were no scour holes observed during the Level I assessment. However, general streambed lowering was evident as both abutments were undermined equally with no localized scour on one abutment over the other. The town highway 2 crossing of Wade Brook is a 23-ft-long, two-lane bridge consisting of one 20-foot concrete slab span (Vermont Agency of Transportation, written communication, August 3, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 30 degrees to the opening while the computed opening-skew-to-roadway is 25 degrees. The scour protection measures at the site were type-1 stone fill (less than 12 inches diameter) on the upstream right wingwall and all road approach embankments, type-2 stone fill (less than 36 inches diameter) on the left abutment, and a “laid-up” stone wall at the upstream end of the upstream left wingwall and in front of the upstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was 0.1 ft. The worst-case contraction scour occurred at the 100-year and 500-year discharges. Abutment scour ranged from 3.9 to 5.2 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 30 (BRNATH00470030) on Town Highway 47, crossing Locust Creek, Barnard, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRNATH00470030 on Town Highway 47 crossing Locust Creek, Barnard, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 4.18-mi 2 drainage area is a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of trees, shrubs, and brush. In the study area, Locust Creek has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 32 ft and an average bank height of 4 ft. The predominant channel bed material is gravel with a median grain size (D 50 ) of 49.5 mm (0.162 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 13, 1994, indicated that the reach was stable. The Town Highway 47 crossing of Locust Creek is a 28-ft-long, one-lane bridge consisting of one 25-foot concrete span (Vermont Agency of Transportation, written communication, August 23, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening. Historical bridge data indicates that the opening-skew-to-roadway is 45 degrees, but 35 degrees was computed by use of survey data from this study. A minor scour hole, 0.5 ft deeper than the mean thalweg depth was observed along the left abutment wall during the Level I assessment. The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) on the upstream wingwalls. There also is type-3 stone fill on the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.4 feet. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 2.3 to 8.9 feet. The worst-case abutment scour occurred at the 100-year discharge at the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 32 (CONCTH00030032) on Town Highway 3, crossing the Moose River, Concord, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CONCTH00030032 on Town Highway 3 crossing the Moose River, Concord, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. Approximately 85 percent of the drainage above the site is in the White Mountain section and 15 percent is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 98.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is primarily grass with several houses and other buildings while the immediate channel banks have dense woody vegetation. In the study area, the Moose River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 83 ft and an average channel depth of 3 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 86.2 mm (0.283 ft). There are bedrock exposures downstream of the bridge. The geomorphic assessment at the time of the Level I and Level II site visit on August 17, 1995, indicated that the reach was stable. The Town Highway 3 crossing of the Moose River is a 96-ft-long, two-lane bridge consisting of two steel-beam spans (Vermont Agency of Transportation, written communication, March 24, 1995). The bridge is supported by vertical, concrete abutments with wingwalls and a concrete pier. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. The right upstream end of the pier is undermined by 1.3 feet. The footing of the right abutment is exposed by as much as 4.0 feet vertically. The footing of the downstream right wingwall is exposed 3.5 feet and the end of the wingwall has broken and fallen into the river. Type-3 stone fill (less than 48 inches diameter) has been placed at the end of the existing wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.7 ft. Abutment scour ranged from 9.9 to 16.4 ft. Pier scour ranged from 14.4 to 16.2 ft. The worst-case contraction, abutment, and pier scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont