Level II scour analysis for Bridge 28 (HARDTH00300028) on Town Highway 30, crossing the Lamoille River, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00300028 on town highway 30 crossing the Lamoille River, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 63.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover upstream and on the downstream right is primarily pasture with some row crops. Trees line the immediate channel banks. The left bank downstream surface cover is primarily brush. In the study area, the Lamoille River has an incised, sinuous channel with a slope of approximately 0.002 ft/ft, an average channel top width of 76 ft and an average bank height of 6 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 46.6 mm (0.153 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 25, 1995, indicated that the reach was laterally unstable. The site was revisited on August 21, 1995, after the August 5-6, 1995 flood on the Lamoille River. Findings from this follow-up visit are presented in Appendix G. The town highway 30 crossing of the Lamoille River is a 54-ft-long, one-lane bridge consisting of one 52-foot steel-beam span (Vermont Agency of Transportation, written communication, April 3, 1995). The bridge is supported by vertical, stone abutments with wingwalls. Scour, about one foot below the mean thalweg, exists along the right abutment and right upstream wingwall. Sheet piling has been driven around the right abutment and wingwalls and filled with concrete. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.9 to 2.5 ft. The worst-case contraction scour occurred at the 100-year discharge. Abutment scour ranged from 11.2 to 17.8 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 22 (BRADTH00270022) on Town Highway 27, crossing the Waits River, Bradford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRADTH00270022 on Town Highway 27 crossing the Waits River, Bradford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, obtained from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the New England Upland section of the New England physiographic province in east-central Vermont. The 153-mi 2 drainage area is in a predominantly rural and forested basin. However, in the vicinity of the study site, the upstream and downstream left banks are suburban and the upstream and downstream right banks are shrub and brushland. In the study area, the Waits River has an incised, sinuous channel with a slope of approximately 0.0002 ft/ft, an average channel top width of 125 ft and an average bank height of 4 ft. The channel bed material ranges from silt and clay to bedrock with a median grain size (D 50 ) of 0.393 mm (0.00129 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 7, 1995, indicated that the reach was stable. The Town Highway 27 crossing of the Waits River is a 109-ft-long, one-lane bridge consisting of a 104-ft steel-truss span (Vermont Agency of Transportation, written communication, March 16, 1995). The opening length of the structure parallel to the bridge face is 99.2 ft. The bridge is supported by vertical, laid-up stone abutments. The channel is skewed approximately 30 degrees to the opening while the opening-skew-to-roadway is zero degrees. No evidence of scour was observed during the Level I assessment. Scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along the upstream right and downstream left banks and type-3 stone fill (less than 48 inches diameter) along the left and right abutments. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and Davis, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.5 to 2.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 11.8 to 18.8 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results.” Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and Davis, 1995, p. 46). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 42 (HARDELMSTR0042) on Elm Street, crossing Cooper Brook, Hardwick, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HARDELMSTR0042 on Elm Street crossing Cooper Brook, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 16.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the overbanks are primarily grass covered with some brush along the immediate channel banks except the upstream right bank and overbank which is forested and the downstream left overbank which has a lumberyard. In the study area, Cooper Brook has a sinuous channel with a slope of approximately 0.005 ft/ft, an average channel top width of 50 ft and an average channel depth of 6 ft. The predominant channel bed materials are sand and gravel with a median grain size (D50) of 1.25 mm (0.00409 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 24, 1995, indicated that the reach was stable. The Elm Street crossing of Cooper Brook is a 39-ft-long, two-lane bridge consisting of one 37-foot concrete span (Vermont Agency of Transportation, written communication, March 17, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 45 degrees. On August 17, 1995 the site was revisited to investigate the effect of the August 4-5, 1995 flood on the structure. Channel features such as scour holes and point bars were shifted by the high flow event. Details of these changes can be found in the Level I data form in Appendix E. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and G. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 3.4 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge which was less than the 100-year discharge. Abutment scour ranged from 7.1 to 10.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 7 (MORRTH00020007) on Town Highway 2 (FAS 239), crossing Ryder Brook, Morristown, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure MORRTH00020007 on Town Highway 2 crossing Ryder Brook, Morristown, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in North-central Vermont. The 18.5-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture and forest. In the study area, Ryder Brook generally is straight and incised with a slope of approximately 0.002 ft/ft, an average channel top width of 48 ft and an average channel depth of 3 ft. The channel bed is bedrock with pockets of sand and gravel in several locations through the reach. The gravel has a median grain size (D 50 ) of 17.7 mm (0.0581 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 16, 1996 indicated that the reach was stable. The Town Highway 2 crossing of Ryder Brook is a 84-ft-long, two-lane bridge consisting of one 84-foot steel-beam span (Vermont Agency of Transportation, written communication, January 31, 1996). The bridge is supported by vertical, concrete abutment walls with spill-through embankments. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 15 degrees. The only scour protection measure at the site was type-3 stone fill (less than 48 inches diameter) on the spill-through embankments of each abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour predictions for all modelled flows at this site were zero. Abutment scour predictions ranged from 5.6 to 8.1 ft. The worst-case abutment scour occurred at the 500- year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. However, historical bridge records and field notes indicate the abutment footings may be set on bedrock. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 11 (HINETH00040011) on Town Highway 4, crossing Lewis Creek, Hinesburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure HINETH00040011 on Town Highway 4 crossing Lewis Creek, Hinesburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 38.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture. In the study area, Lewis Creek has an incised, straight channel with a slope of approximately 0.001 ft/ft, an average channel top width of 60 ft and an average channel depth of 7 ft. The channel bed material ranges from gravel to boulder with a median grain size (D 50 ) of 47.0 mm (0.154 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 3, 1996, indicated that the reach was stable. The Town Highway 4 crossing of Lewis Creek is an 84-foot-long, two-lane bridge consisting of one 82-foot steel-beam span (Vermont Agency of Transportation, written communication, December 15, 1995). The bridge is supported by vertical, concrete abutments with wingwalls and spill-through embankments at each abutment. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 15 degrees. The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) at the downstream left and right wingwalls and the downstream right bank. Scour protection also included type-3 stone fill (less than 48 inches diameter) at the left and right upstream wingwalls, both abutments, both upstream banks, and the left bank downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 14.1 to 18.2 ft. Right abutment scour ranged from 9.9 to 13.4 ft. The worst-case abutment scour occurred at left abutment for the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured- streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle- size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 8 (BARTTH00020008) on Town Highway 2, crossing Roaring Brook, Barton, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BARTTH00020008 on town highway 2 crossing Roaring Brook, Barton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland section of the New England physiographic province of North-central Vermont in the town of Barton. The 9.89-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have woody vegetation coverage except for the downstream left bank, which has a few trees and grass and brush coverage. In the study area, Roaring Brook has an incised, sinuous channel with a slope of approximately 0.019 ft/ft, an average channel top width of 35 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel/cobble (D 50 is 49.1 mm or 0.161 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 18, 1994 indicated that the reach was laterally unstable. A cut-bank on the downstream right bank and overall channel configuration in the valley are indications of the lateral instability at this site. The town highway 2 crossing of Roaring Brook is a 30-ft-long, two-lane bridge consisting of one 26-foot span concrete T-beam type superstructure (Vermont Agency of Transportation, written communication, August 4, 1994). The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 15 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 2.5 ft deeper than the mean thalweg depth was observed near mid-channel downstream of the bridge during the Level I assessment. The only scour protection measure at the site was type-1 stone fill (less than 12 inches diameter) on the left upstream and downstream roadway embankments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term aggradation or degradation; 2) contraction scour (due to reduction in flow area caused by a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute scour depths for contraction and local scour and a summary of the results follows. Contraction scour for all modelled flows ranged from 1.4 to 2.8 feet and the worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 8.5 to 16.5 feet and the worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Systematic variation of rare-earth elements in cerium-earth minerals

In a continuation of a study reported previously, rare-earth elements and thorium have been determined in monazite, allanite, cerite, bastnaesite, and a number of miscellaneous cerium-earth minerals. A quantity called sigma (∑), which is the sum of the atomic percentages of La, Ce, and Pr, is proposed as an index of composition of all cerium-earth minerals with respect to the rare-earth elements. The value of ∑ for all of the minerals analysed falls between 58 and 92 atomic per cent. Monazites, allanites, and cerites cover the entire observed range, whereas bastnaesites are sharply restricted to the range between 80 and 92 atomic per cent. The minimum value of ∑ for a cerium-earth mineral corresponds to the smallest possible unit-cell size of the mineral. In monazite, this structurally controlled minimum value of ∑ is estimated to be around 30 atomic per cent. Neodymium, because of its abundance, and yttrium, because of its small size, have dominant roles in contraction of the structure. In the other direction, the limit of variation in composition will be reached when lanthanum becomes the sole rare-earth element in a cerium-earth mineral. Cerium-earth minerals from alkalic rocks are all characterized by values of ∑ greater than 80 atomic per cent, indicating that the processes that formed these rocks were unusually efficient in fractionating the rare-earth elements—efficient in the sense that a highly selected assemblage is produced without eliminating the bulk of these elements. Analyses of inner and outer parts of two large crystals of monazite from different deposits show no difference in ∑ in one crystal and a slightly smaller value of ∑ in the outer part of the other crystal compared to the inner part. The ∑ of monazites from pegmatites that intrude genetically related granitic rocks in North Carolina is found to be either higher or lower than the ∑ of monazites in the intruded host rock. These results indicate that the fractionation of the rare-earth elements is not a simple unidirectional process. When a cerium-earth mineral undergoes replacement, its rare-earth elements may be fractionated into two parts, one forming a new mineral with ∑ that is smaller, and the other a second new mineral with ∑ that is larger than that of the original mineral. The complete analysis of a cerium-earth mineral to determine its ∑ is time consuming. The discovery of a direct relationship between ∑ and the Ce/(Nd + Y) atomic ratio in cerium earth minerals allows a rapid determination of ∑ from spectrograms obtained in a previously described method for determining thorium in these minerals.

Geochimica et Cosmochimica Acta

Level II scour analysis for Bridge 32 (NFIEVT012A0032) on State Route 12A, crossing the Dog River, Northfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NFIEVT012A0032 on State Route 12A crossing the Dog River, Northfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 13.5-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture (golf course). In the study area, the Dog River has a straight channel with a slope of approximately 0.01 ft/ ft, an average channel top width of 47 ft and an average bank height of 7 ft. The predominant channel bed materials are gravel and cobbles with a median grain size (D 50 ) of 39.0 mm (0.128 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 22, 1996, indicated that the reach was stable. The State Route 12A crossing of the Dog River is a 35-ft-long, two-lane bridge consisting of one 32-foot concrete span (Vermont Agency of Transportation, written communication, October 13, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 30 degrees to the opening and the opening-skew-to- roadway also is 30 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the upstream end of the right abutment wall during the Level I assessment. The scour protection measures at the site were type-1 stone fill (less than 12 inches diameter) on the right bank downstream and type-2 stone fill (less than 36 inches diameter) on the upstream banks, the downstream left bank and the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.5 to 2.9 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 7.2 to 1 2.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross- section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 32 (FERRTH00190032) on Town Highway 19, crossing the South Slang Little Otter Creek, Ferrisburgh, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FERRTH00190032 on Town Highway 19 crossing the South Slang Little Otter Creek (Hawkins Slang Brook), Ferrisburg, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (FHWA, 1993). Results of a Level I scour investigation also are included in appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in appendix D. The site is in the Champlain section of the St. Lawrence Valley physiographic province in west-central Vermont. The 8.00-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of wetlands upstream and downstream of the bridge with trees and pasture on the wide flood plains. In the study area, the South Slang Little Otter Creek has a meandering channel with essentially no channel slope, an average channel top width of 932 ft and an average bank height of 6 ft. The channel bed material ranges from clay to sand. Sieve analysis indicates that greater than 50% of the sample is coarse silt and clay and thus a medium grain size by use of sieve analysis was indeterminate. The median grain size was assumed to be a course silt with a size (D 50 ) of 0.061mm (0.0002 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 2, 1996, indicated that the reach was stable. The Town Highway 19 crossing of the South Slang Little Otter Creek is a 45-ft-long, twolane bridge consisting of one 42-foot concrete box-beam span (Vermont Agency of Transportation, written communication, December 11, 1995). The opening length of the structure parallel to the bridge face is 41.8 ft. The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 3.5 ft deeper than the mean thalweg depth was observed in the upstream channel. Also a scour hole 2.0 ft deeper than the mean thalweg depth was observed along the right abutment during the Level I assessment. The scour protection measures at the site are type-1 stone fill (less than 12 inches diameter) around the left and right abutments, along the upstream and downstream road embankments, and across the entire upstream and downstream bridge face. Additional details describing conditions at the site are included in the Level II Summary and appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995) for the 100- and 500-year discharges. Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 14.0 to 20.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.2 to 8.3 ft. The worst-case abutment scour occurred at the 500-year discharge. The predicted scour is well above the pile bottom elevations. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. Computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 45b (BRIDTH00040045b) on Town Highway 4, crossing an unnamed Dailey Hollow Branch Tributary, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH0004045B on town highway 4 crossing an unnamed Dailey Hollow Branch Tributary, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 2.47-mi 2 drainage area is in a predominantly rural and forested basin. Surface cover in the vicinity of the study site is variable. A gravel road is adjacent to the left bank with the immediate upstream left bank covered by grass and the immediate downstream left bank covered by shrubs and brush. The upstream right bank is densely forested; the downstream right overbank is covered by grass with trees and brush on the immediate channel bank. In the study area, this unnamed Dailey Hollow Branch Tributary has an incised channel with a slope of approximately 0.04 ft/ft, an average channel top width of 29 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel with a median grain size (D 50 ) of 47.0 mm (0.154 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 15, 1994, indicated that the reach was stable. The town highway 4 crossing of the unnamed Dailey Hollow Branch Tributary is a 62-ft-long, corrugated steel multi-plate arch structure. It is supported by concrete footings leaving natural stream bed exposed (Vermont Agency of Transportation, written communication, January, 1996). The road embankments are protected by stone fill, however, the size is unknown due to sand and grass covering the fill except for the upstream left embankment which has type-2 stone fill (less than 36 inches diameter). The downstream left bank is protected by type-3 stone fill (less than 48 inches diameter) extending 25 feet downstream of the culvert. The channel approach to the culvert has a mild s-curve bend with the opening skewed ten degrees to flow. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.1 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 7.7 to 11.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Population and habitat analyses for greater sage-grouse (Centrocercus urophasianus) in the bi-state distinct population segment—2018 update

Executive Summary The Bi-State Distinct Population Segment (Bi-State DPS) of greater sage-grouse ( Centrocercus urophasianus , hereinafter “sage-grouse”) represents a genetically distinct and geographically isolated population that straddles the border between Nevada and California. The primary threat to these sage-grouse populations is the expansion of single-leaf pinyon ( Pinus monophylla ) and Utah juniper ( Juniperus osteosperma ) into sagebrush ecosystems, which fragments and reduces population connectivity and survival. Other important threats include low water availability during brood-rearing, particularly during drought, and increased predation by common ravens ( Corvus corax ), a generalist predator often associated with anthropogenic resource subsidies. Although the Bi-State DPS occurs at high elevations relative to sage-grouse range-wide, changes in historical wildfire cycles and the conversion of native shrubs to invasive annual grasslands still threaten these populations. The Bi-State DPS has undergone multiple federal status assessments and associated litigation. For example, in October of 2013, the Bi-State DPS was proposed for listing as threatened under the Endangered Species Act of 1973 by the U.S. Fish and Wildlife Service (USFWS), then withdrawn in April 2015. The withdrawal decision was challenged, and in May 2018, a Federal district court ordered the withdrawal decision to be vacated, and USFWS was required to re-open the October 2013 listing evaluation. In response, the U.S. Geological Survey (USGS), with State and Federal collaborators, embarked on a multipronged analysis to provide current and best available science regarding population status of sage-grouse within the Bi-State DPS. Using data from a long-term monitoring program, we carried out four analytical study objectives, and here, we provide preliminary results of these analyses. First, we used integrated population modeling (IPM) to predict annual population abundance and annual finite rate of population change for the Bi-State DPS, as a whole, and for each subpopulation between 1995 and 2018. Because sage-grouse exhibit population cycles (periodic increases and decreases in abundance across approximately 6- to 10-year wavelengths), we estimated trends across three nested temporal scales that represent one (11 years), two (18 years), and three (24 years) complete population cycles. These estimates of relatively long-term averaged population change account for temporal (that is, interannual) variation. Our model predicted population abundance for the Bi-State DPS during 2018 at 3,305 individuals (2,247–4,683), with the majority occupying Bodie Hills and Long Valley. The model also predicted cyclic dynamics in abundance through time with evidence of 24-year population growth and slight trends of decline over the past 18 years. Specifically, across the Bi-State DPS as a whole, we estimated annual average at 0.99, 0.99, and 1.02 over the one, two, and three population cycles, which equated to a 10.5 percent, 16.6 percent decrease, and 60.0 percent increase in abundance over the 11-, 18-, and 24-year cycles. Estimated abundance in 2018 had not reached numbers lower than those predicted during 1995. However, we found spatial variation in population trends across the three cycles. Bodie Hills subpopulation comprised the greatest (1,521) and exhibited average annual greater than 1.0 across all periods resulting in average annual increases of 7 percent. This relatively large subpopulation has grown 5 times larger than what was predicted in 1995 while experiencing cyclical dynamics within that period. Conversely, other smaller subpopulations within the Bi-State DPS exhibited average annual equal to or less than 1.0 resulting in estimated 10-year risks of extirpation ranging from 2.0 to 76.1 percent. In general, evidence of decline among smaller subpopulations was greatest for the most recent period (2008–18) compared to a period that encompassed three full population cycles (24-year). This difference coincides with an intense period of drought that began in 2012. For comparative purposes as part of this first objective, we conducted a similar analysis for populations of sage-grouse within Nevada and California but outside the Bi-State DPS. We developed a region-wide and distance-weighted IPM using lek count from Nevada Department of Wildlife (NDOW) and California Department of Fish and Wildlife (CDFW) databases and with telemetry data collected by USGS across 12 sage-grouse subpopulations. Our models predicted similar patterns in population cycling outside the Bi-State DPS but with much stronger evidence of long-term declines across 24 years. Specifically, median averaged across each year of the 11-, 18-, and 24-year periods resulted in average annual values of 0.94, 0.97, and 0.99, respectively. These values equate to 41.0 percent, 38.5 percent, and 21.3 percent declines over the corresponding periods. Second, we used lek count data in a state-space modeling framework to compare trends in population abundance across different spatial scales (that is, leks versus Bi-State DPS). This hierarchical framework allowed us to disentangle declines associated with climate conditions as opposed to other local level factors that might signal the need for management intervention. Specifically, we identified 7 leks that were both declining and recently decoupled from larger spatial scale trends, typically governed by climatic conditions (referred to as soft or hard signals). The goal of this analysis was to provide an early warning system that might have implications for conservation actions at local scales. Third, we developed phenological (spring, summer–fall, and winter) and reproductive life stage (nesting, early brood-rearing, and late-brood rearing) based resource selection functions using various environmental covariates. We report rankings of variable importance for each season and life stage, developed maps of habitat selection indices (HSI), binned categories representing low, moderate, and high classes of quality (where any category greater than or equal to low indicated selected habitat) for each phenological season and life stage, and produced composite maps by selected phenological and reproductive stage to estimate annual habitat. Fourth, we used for each lek within the Bi-State DPS to carry out a spatial analysis that quantified substantial changes in the distribution of occupied habitat across long- (24-year) and short- (11-year) term periods. Owing to differences among available datasets, the long-term analysis primarily reflected spatial shifts among subpopulations comprising the majority of the Bi-State DPS (that is, Bodie Hills and Long Valley) while the short-term analysis also quantified changes among subpopulations along the periphery. Over long and short-term periods, the overall distribution of occupied habitat (as measured by 99 percent utilization distributions intersecting any quantified habitat) was reduced by 20,573 ha and 55,492 ha, respectively. Occupied core areas (as measured by 50 percent utilization distributions intersecting any quantified habitat) over long-term periods were solely located in Bodie Hills and Long Valley. Although nearly all subpopulations experienced contractions in occupied overall and core distribution, Bodie Hills experienced spatial expansion that occurred with concomitant spatial contraction at Long Valley over both periods. Subpopulations at the northern (Pine Nuts), central (Sagehen) and southern (White-Mountains) extents of the Bi-State DPS also experienced spatial contraction over the short-term period. These findings, coupled with those of population trends, indicate long-term patterns in redistribution of sage-grouse from Long Valley and peripheral subpopulations to Bodie Hills. That is, sage-grouse subpopulations at the periphery are declining while the largest population at the core is increasing, which could have meaningful impacts on overall metapopulation persistence. We provide evidence for loss of occupied habitat (reduced distribution) given local extirpation of subpopulations. Fifth, we calculated percentages of selected phenological, life stage, and annual habitat that each subpopulation contributed to the Bi-State DPS. We then intersected these maps with a composite estimate of occupied habitat from the fourth objective and calculated percentages of selected habitat likely occupied by sage-grouse that each subpopulation contributed to the Bi-State DPS. These values provide evidence for loss of occupied habitat and subsequent reductions in spatial distribution given reductions in abundance and, in some cases, extirpation of leks within subpopulations. Lastly, we carried out an initial in-depth analysis of selection for irrigated pastures and wet meadows during the brood-rearing stage for the Long Valley subpopulation. We chose this subpopulation because it represents a population core, representing 26.5 percent of total sage-grouse within the Bi-State DPS, and has exhibited long-term declines in abundance and distribution. This subpopulation is highly sensitive to precipitation and other factors that influence water availability. Models predicted higher use of the interior portions of irrigated pastures and wet meadows during late brood-rearing period, which represented a potentially risky use of habitat that was exacerbated during periods of low moisture (for example, drought, reduced water delivery, or both). Sage-grouse typically used edges of riparian areas and pastures, largely because the interior of these mesic areas consisted of considerably less overhead concealment cover (for example, shrubs) that likely resulted in a higher risk of mortality. We found that a lack of water delivery to pastures in the form of overwinter precipitation or diversion ditches increased the movements of sage-grouse to the interior of pastures. Although further investigation of water delivery impacts on chick survival are warrented, our initial findings regarding resource selection may explain recent declines in population growth at Long Valley.

California, Nevada

Level II scour analysis for Bridge 22 (REDSVT01000022) on State Route 100, crossing the West Branch Deerfield River, Readsboro, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure REDSVT01000022 on State Route 100 crossing the West Branch Deerfield River, Readsboro, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in southern Vermont. The 25.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest. In the study area, the West Branch Deerfield River has an incised, straight channel with a slope of approximately 0.025 ft/ft, an average channel top width of 63 ft and an average channel depth of 10 ft. The predominant channel bed materials are cobbles and boulders with some bedrock exposure noted under the bridge. The bed material has a median grain size (D 50 ) of 141.0 mm (0.463 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 30, 1996, indicated that the reach was stable. The State Route 100 crossing of the West Branch Deerfield River is a 119-ft-long, two-lane bridge consisting of one 110-foot steel-beam span (Vermont Agency of Transportation, written communication, September 28, 1995). The bridge is supported by vertical, concrete abutments with spill-through embankments. The channel is skewed approximately 50 degrees to the opening while the opening-skew-to-roadway is 50 degrees. The scour protection measure at the site was type-3 stone fill (less than 48 inches diameter) on the spill-through embankments of each abutment and the banks upstream and downstream. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. There was no predicted contraction scour for any of the modelled flows. Abutment scour ranged from 4.9 to 11.6 ft. The worst-case abutment scour occurred at the right abutment for the 500-year discharge. However, historical information indicates the right abutment is in contact with bedrock at least in part. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 35 (BETHTH00190035) on Town Highway 19, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00190035 on town highway 19 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 6.40-mi 2 drainage area is predominantly rural and forested. In the vicinity of the study site, the immediate banks have woody vegetation coverage with pasture beyond. In the study area, Gilead Brook is an incised, sinuous channel with a slope of approximately 0.015 ft/ft, an average channel top width of 31 ft and an average channel depth of 2.5 ft. The predominant channel bed material is gravel and cobble (D 50 is 62.5 mm or 0.205 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 20, 1994, indicated that the reach was stable. The town highway 19 crossing of Gilead Brook is a 30-ft-long, one-lane bridge consisting of one 24-foot steel-beam span with timber deck (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 10 degrees. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) at the downstream wingwalls, left abutment, and upstream right road embankment; type-2 stone fill (less than 36 inches diameter) is at the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.1 to 2.1 ft. with the worst-case scenario occurring at the 500-year discharge. Abutment scour ranged from 3.9 to 9.5 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 26 (PUTNTH00010026) on Town Highway 1, crossing Sacketts Brook, Putney, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure PUTNTH00010026 on Town Highway 1 crossing Sacketts Brook, Putney, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in southern Vermont. The 10.1-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge while the immediate banks have dense woody vegetation. In the study area, Sacketts Brook has an incised, straight channel with a slope of approximately 0.01 ft/ft, an average channel top width of 35 ft and an average bank height of 5 ft. The channel bed material is predominantly cobble with a median grain size (D 50 ) of 68.3 mm (0.224 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 20, 1996, indicated that the reach was stable. The Town Highway 1 crossing of Sacketts Brook is a 49-ft-long, two-lane bridge consisting of one 46-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 30, 1995). The bridge is supported by vertical, concrete abutments. The channel is skewed approximately 35 degrees to the opening while the opening-skew-to- roadway is 45 degrees. The scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) at the upstream end of the left abutment and along the entire base length of the right abutment. There was also a vertical stone wall along the upstream left bank. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for modelled flows ranged from 0.0 to 2.7 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 7.9 to 9.9 ft. with the worst-case occurring at the 100-year discharge. Right abutment scour ranged from 12.6 to 17.0 ft. with the worst-case occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 24 (WODSTH00190024) on Town Highway 19, crossing North Bridgewater Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00190024 on Town Highway 19 crossing North Bridgewater Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of east-central Vermont in the town of Woodstock. The 3.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are covered by moderate tree cover along the immediate banks with some pasture/ grassland beyond. In the study area, the North Bridgewater Brook has a sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 44 ft and an average channel depth of 4 ft. The channel bed materials ranges from sand to boulders with a D 50 (median diameter)of 70.1 mm or 0.229 ft. The geomorphic assessment at the time of the Level I and Level II site visits on August 17, 1994 and December 13, 1994, indicated that the reach was stable. Localized bank cutting existed at the immediate downstream left bank. The Town Highway 19 crossing of the North Bridgewater Brook is a 26-ft-long, one-lane bridge consisting of one 23-ft steel-beam span (Vermont Agency of Transportation, written commun., August 3, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. Type-2 (less than 3 ft diameter) stone fill protects the upstream left wingwall which is impacted by flow. The channel bed under the bridge is constructed of wood. This construction is preventing channel degradation along the impacted left abutment.The channel is skewed approximately 40 degrees to the opening; the opening-skew-to-roadway is 10 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. Abutment scour ranged from 6.6 to 14.9 ft. with the worst-case scenario occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 14 (FFIETH00010014) on Town Highway 1, crossing the Fairfield River, Fairfield, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure FFIETH00010014 on Town Highway 1 crossing the Fairfield River, Fairfield, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northwestern Vermont. The 7.84-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover on the upstream left and downstream right is row crops. The surface cover on the upstream right and downstream left is pasture. In the study area, the Fairfield River has a sinuous channel with a slope of approximately 0.006 ft/ft, an average channel top width of 33 ft and an average channel depth of 3 ft. The channel bed material ranges from silt to gravel with a median grain size (D 50 ) of 15.4 mm (0.0505 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 11, 1995, indicated that the reach was laterally unstable. The Town Highway 1 crossing of the Fairfield River is a 26-ft-long, two-lane bridge consisting of one 23-foot concrete span (Vermont Agency of Transportation, written communication, March 9, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 27 degrees to the opening while there is no opening-skew-to-roadway. The bridge is located on a sharp channel bend. Th e left abutment is impacted due to this bend. A scour hole 1.5 ft deeper than the mean thalweg depth was observed along the left abutment during the Level I asse ssment. Scour protection measures at the site include type- 3 stone fill (less than 48 inches diameter ) along the immediate upstream banks and along the base of the upstream left wi ngwall. Type-2 stone fill (le ss than 36 inches diameter) was present along the downstream left wingwall. A dditional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 5.4 to 8.0 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 3.0 to 8.3 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are include d in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour ) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events , the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Physical exploration for uranium during 1951 in the Silver Reef district, Washington County, Utah

During 1951 a joint exploration program of the most promising uraniferous areas in the Silver Reef district was made by the U.S. Geological Survey and the u.S. Atomic Energy Commission. A U.S. Bureau of Mines drill crew, on contract to the Atomic Energy Commission, did 2,450 feet of diamond drilling under the geological supervision of the U.S. Geological Survey. The purpose of the drilling was to delineate broadly the favorable ground for commercial development of the uranium depostis. Ten drill holes were located around Pumpkin Point, which is the northeastern end of Buckeye Reef, to probe for extensions of small ore shootsmined on the Point in fine-grained sandstones of the Chinle formation. Three additional holes were located around teh Tecumseh Hill to prbe for extensions of the small showings of uranium-bearing rocks of Buckeye Reef.

Utah

Level II scour analysis for Bridge 6 (RICHTH00030006) on Town Highway 3, crossing an unnamed tributary to the Missisquoi River, Richford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RICHTH00030006 on Town Highway 3 crossing an unnamed tributary to the Missisquoi River, Richford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of northern Vermont. The 4.5-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge. In the study area, the unnamed tributary to the Missisquoi River is a sinuous channel with a slope of approximately 0.008 ft/ft, an average channel top width of 39 ft and an average channel depth of 2 ft. The channel slope was obtained from a topographic map (USGS, 1986). The predominant channel bed material is gravel with a median grain size (D 50 ) of 26.2 mm (0.0861 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 28, 1995, indicated that the reach was stable. The Town Highway 3 crossing of an unnamed tributary to the Missisquoi River is a 26-ftlong, two-lane bridge consisting of one 24-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 9, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 0.0 degrees. The only scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) along the upstream right wingwall and at the upstream end of the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.7 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Scour at the left abutment ranged from 7.6 to 12.6 ft with the worst case occurring at the 100-year event. Scour at the right abutment ranged from 1.6 to 5.6 ft with the worst case occurring at the 500-year event. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont