USGS ScienceSearch

SEARCH · USGS Science

Results for “Mineral Industry Surveys”

Search indexed USGS publications on groundwater, aquifers, geologic maps, mineral resources and earthquakes. Explore source records by subject and place.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13Linked to original sources

Fracture patterns and their origin in the upper Devonian Antrim Shale gas reservoir of the Michigan basin: A review

INTRODUCTION: Black shale members of the Upper Devonian Antrim Shale are both the source and reservoir for a regional gas accumulation that presently extends across parts of six counties in the northern part of the Michigan basin (fig. 1). Natural fractures are considered by most petroleum geologists and oil and gas operators who work the Michigan basin to be a necessary condition for commercial gas production in the Antrim Shale. Fractures provide the conduits for free gas and associated water to flow to the borehole through the black shale which, otherwise, has a low matrix permeability. Moreover, the fractures assist in the release of gas adsorbed on mineral and(or) organic matter in the shale (Curtis, 1992). Depths to the gas-producing intervals (Norwood and Lachine Members) generally range from 1,200 to 1,800 ft (Oil and Gas Journal, 1994). Locally, wells that produce gas from the accumulation are as deep as 2,200 (Oil and Gas Journal, 1994). Even though natural fractures are an important control on Antrim Shale gas production, most wells require stimulation by hydraulic fracturing to attain commercial production rates (Kelly, 1992). In the U.S. Geological Survey's National Assessment of United States oil and gas, Dolton (1995) estimates that, at a mean value, 4.45 trillion cubic feet (TCF) of gas are recoverable as additions to already discovered quantities from the Antrim Shale in the productive area of the northern Michigan trend. Dolton (1995) also suggests that undiscovered Antrim Shale gas accumulations exist in other parts of the Michigan basin. The character, distribution, and origin of natural fractures in the Antrim Shale gas accumulation have been studied recently by academia and industry. The intent of these investigations is to: 1) predict 'sweet spots', prior to drilling, in the existing gas-producing trend, 2) improve production practices in the existing trend, 3) predict analogous fracture-controlled gas accumulations in other parts of the Michigan basin, and 4) improve estimates of the recoverable gas in the Antrim Shale gas plays (Dolton, 1995). This review of published literature on the characteristics of Antrim Shale fractures, their origin, and their controls on gas production will help to define objectives and goals in future U.S. Geological Survey studies of Antrim Shale gas resources.

Michigan

Temperature data from wells in Long Valley Caldera, California

The 30-by-20-km Long Valley Caldera (LVC) in eastern California (fig.1) formed at 0.76 Ma in a cataclysmic eruption that resulted in the deposition of 600 km? of Bishop Tuff outside the caldera rim (Bailey, 1989). By approximately 0.6 Ma, uplift of the central part of the caldera floor and eruption of rhyolitic lava formed the resurgent dome. The most recent eruptive activity in the area occurred approximately 600 yr ago along the Mono-Inyo craters volcanic chain (Bailey, 2004; Hildreth, 2004). LVC hosts an active hydrothermal system that includes hot springs, fumaroles, mineral deposits, and an active geothermal well field and power plant at Casa Diablo along the southwestern boundary of the resurgent dome (Sorey and Lewis, 1976; Sorey and others, 1978; Sorey and others, 1991). Electric power generation began in 1985 with about 10 Mwe net capacity and was expanded to about 40 Mwe (net) in 1991 (Campbell, 2000; Suemnicht and others, 2007). Plans for further expansion are focused mainly on targets in the caldera?s western moat (Sass and Priest, 2002) where the most recent volcanic activity has occurred (Hildreth, 2004). LVC has been the site of extensive research on geothermal resources and volcanic hazards (Bailey and others, 1976; Muffler and Williams, 1976; Miller and others, 1982; Hill and others 2002). The first geothermal exploratory drilling was done in the shallow (< 200 m deep) hydrothermal system at Casa Diablo in the 1960?s (McNitt, 1963). Many more boreholes were drilled throughout the caldera in the 1970?s and 1980?s by private industry for geothermal exploration and by the U.S. Geological Survey (USGS) and Sandia National Laboratory for volcanic and geothermal research and exploration. Temperature logs were obtained in some of these wells during or immediately following drilling, before thermal equilibration was complete. Most of the temperature logs, however, were obtained weeks, months, or years after well completion and are representative of dynamic thermal equilibrium. The maximum reservoir temperature for LVC is estimated to be about 220?C on the basis of chemical geothermometers (Fournier and Truesdell, 1973) using analytical results from water samples collected from a large number of wells and springs across the caldera and around its periphery (Lewis, 1974; Mariner and Wiley, 1976; Farrar and others, 1985, 1987, 1989, White and Peterson, 1991). The deepest well in LVC (~3 km) is the Long Valley Exploratory Well (LVEW) drilled in the 1990?s with funding from the U.S. Department of Energy to investigate the potential for near-magmatic-temperature energy extraction and the occurrence of magma under the central part of the resurgent dome (Finger and Eichelberger, 1990; Finger and Jacobsen, 1999; Sackett and others, 1999). However, temperatures beneath the resurgent dome have proved disappointingly low and in LVEW reach a maximum of only 102 degrees C in a long isothermal section (2,100 to 3,000 m) in Mesozoic basement rocks (Farrar and others, 2003). Temperature data from well logs and geothermometry reveal that the highest temperatures in LVC are beneath the western moat. The hottest temperatures measured in LVC exceed 200 degrees C in two wells (44-16 and RDO-8) located in the western moat. Well 44-16 was drilled through the entire thickness of post-caldera volcanic fill and bottomed in Mesozoic basement. Well RDO-8 was drilled through post-caldera volcanic rocks and 305 m into the Bishop Tuff (Wollenberg and others, 1986). Temperatures in the hydrothermal system decrease toward the east by processes of conduction and dilution from cold groundwater recharge that occurs mostly around the caldera margin and beneath the resurgent dome. Reservoir temperatures at Casa Diablo (fig.1) are about 170?C (for example, MBP-3 and Mammoth-1), decreasing to about 100 degrees C in wells near Hot Creek Gorge (for example, MW-4 and CH-10B), and are generally less than 50?C in thermal springs near Lake

Data Series

Conflict minerals from the Democratic Republic of the Congo—Gold supply chain

The U.S. Geological Survey (USGS) analyzes mineral and metal supply chains to identify and describe major components of material flows from ore extraction, through intermediate forms, to a final product. Supply chain analyses may be used to identify risks to the United States associated with the supply of critical and strategic minerals and metals and to provide greater supply chain transparency so that policymakers have the fact-based information needed to formulate public policy. This fact sheet focuses on the gold supply chain. The USGS National Minerals Information Center (NMIC) has been asked by governmental and non-governmental organizations to provide information about tantalum, tin, tungsten, and gold (collectively known as &ldquo;3TG minerals&rdquo; ) processing facilities worldwide in response to U.S. legislation aimed at identifying and removing the supply chain links associated with the trade of these metals and minerals among armed groups in the Democratic Republic of the Congo (DRC) and adjacent countries. Post-beneficiation processing plants (generally called smelters and refineries) for tantalum, tin, and tungsten (3T) mineral ores and concentrates were identified by company and industry association representatives as being the link in the 3T mineral supply chain through which these minerals can be traced to their source of origin (mine). Tungsten processing plants were the subject of the first fact sheet in a series of USGS reports about 3TG minerals, which was published by the NMIC in August 2014 (Berm&uacute;dez-Lugo, 2014). Background information about historical conditions and the voluntary due diligence of multinational stakeholders for minerals from conflict-affected and high-risk areas is presented in the tungsten fact sheet. The current fact sheet, the fourth and last in the series about 3TG minerals, focuses on the gold supply chain. Processing of the 3T mineral concentrates requires substantial infrastructure and capital and generally is done at relatively few specialized facilities that are not located at the mine site; primary and secondary processors typically are at separate locations. Gold, however, can easily be processed into semi-refined products at or near the mine site and has a high unit value in any form, which allows it to be readily exported through undocumented channels, making it more difficult to track to the mine or region of origin. To put this in perspective, 30 kilograms (66 pounds) of 83 percent pure gold (20 carat) would form a cube measuring 12 centimeters per side (about the size of a small tissue box) and, at a price of $1,200 per ounce, would be worth nearly $1 million. By contrast, the equivalent value of tungsten concentrates would weigh about 45 metric tons (t) (100,000 pounds). Once conflict sourced gold has been combined with gold from other mines and scrap at a refiner, there is no feasible way to distinguish the source of the gold. Thus, once the gold leaves the immediate area of production, it is nearly indistinguishable from gold products mined in other areas.

Fact Sheet

The Mammoth magnetic anomaly, Pinal County, Arizona

A high-resolution Earth Mapping Resources Initiative airborne geophysical survey was flown in the southwest North American porphyry copper province to improve bedrock geologic maps and to identify areas that have unrecognized critical mineral resource potential. During the review of the aeromagnetic data, a distinctly monopolar-shaped, negative magnetic anomaly was observed at a flight elevation of 200 m above the ground with a maximum amplitude of –9500 nT. We have named this the Mammoth magnetic anomaly (MMA) because it is centered 12 km northeast of the town of Mammoth, Arizona, USA. The total field anomaly (TFA) contour of –500 nT enclosing the MMA defines an elongate shape measuring 2.5 km long by 1 km wide that trends northwest–southeast. Given the striking nature of this negative, monopolar-shaped magnetic anomaly, we conducted a ground campaign in May 2025 to determine its authenticity and potential relationship to critical mineral endowment. The MMA was confirmed on the ground with a TFA approaching –46,000 nT. Total magnetic intensity (TMI) observations routinely fell below the 18,000 nT operating floor of an industry-standard cesium-vapor total field magnetometer, and extremely low TMI measurements were corroborated along coincident traverse lines using two high dynamic range, but lower sensitivity, smartphone vector magnetometers. The lowest TMI values recorded by both smartphone magnetometers were 1000 nT and confirmed with multiple adjacent and crossing lines. Field observations suggest that this magnetic feature is caused by strong remanent magnetization within fine-grained magnetite hosted within locally altered Pinal Schist.

Arizona

Conflict minerals from the Democratic Republic of the Congo—Tin processing plants, a critical part of the tin supply chain

Summary The U.S. Geological Survey (USGS) analyzes mineral and metal supply chains to identify and describe major components of material flows from ore extraction, through intermediate forms, to a final product. Supply chain analyses may be used (1) to identify risks to the United States associated with the supply of critical and strategic minerals and metals and (2) to provide greater supply chain transparency so that policymakers have the fact-based information needed to formulate public policy. This fact sheet focuses on the post-mining/pre-consumer-product part of the tin supply chain. The USGS National Minerals Information Center (NMIC) has been asked by governmental and non-governmental organizations to provide information about tantalum, tin, tungsten, and gold (collectively known as &ldquo;3TG minerals&rdquo;) processing facilities worldwide in response to U.S. legislation aimed at identifying and removing the supply chain links between the trade in these minerals and civil unrest in the Democratic Republic of the Congo (DRC) and adjacent countries. Post-beneficiation processing plants (generally called smelters and refineries) for 3TG mineral ores and concentrates were identified by company and industry association representatives as being a link in the 3TG mineral supply chain through which these minerals can be traced to their source of origin (mine). The determination of the source of origin is critical to the development of a complete and transparent conflict-free mineral supply chain. Tungsten processing plants were the subject of the first fact sheet in this series published by the USGS NMIC in August 2014. Background information about historical conditions and multinational stakeholders&rsquo; voluntary due diligence guidance for minerals from conflict-affected and high-risk areas was presented in the tungsten fact sheet. Tantalum processing plants were the subject of the second fact sheet in this series published by the USGS NMIC in December 2014. This fact sheet, the third in the series about 3TG minerals, focuses on the tin supply chain by listing selected processors that produced tin materials commercially worldwide during 2013&ndash;14. It does not provide any information regarding the sources of the material processed in these facilities.

Fact Sheet

Conflict minerals from the Democratic Republic of the Congo: global tantalum processing plants, a critical part of the tantalum supply chain

The U.S. Geological Survey (USGS) analyzes mineral and metal supply chains to identify and describe major components of mineral and metal material flows from ore extraction, through intermediate forms, to a final product. Supply chain analyses may be used (1) to identify risks to the United States associated with the supply of critical and strategic minerals and metals and (2) to provide greater supply chain transparency so that policymakers have the fact-based information needed to formulate public policy. This fact sheet focuses on the post-mining/pre-consumer-product part of the tantalum supply chain. The USGS National Minerals Information Center (NMIC) has been asked by governmental and non-governmental organizations to provide information about tantalum, tin, tungsten, and gold (collectively known as &ldquo;3TG minerals&rdquo;) processing facilities worldwide in response to U.S. legislation aimed at identifying and removing the supply chain links between the trade in these minerals and civil unrest in the Democratic Republic of the Congo and adjacent countries. Post-beneficiation processing plants (generally called smelters and refineries) for 3TG mineral ores and concentrates were identified by company and industry association representatives as being the link in the 3TG mineral supply chain through which these minerals can be traced to their source of origin (mine). The determination of the source of origin is critical to the development of a complete and transparent conflict-free mineral supply chain. Tungsten processing plants were the subject of the first fact sheet in this series published by USGS NMIC in August 2014. Background information about historical conditions and multinational stakeholders&rsquo; voluntary due diligence guidance for minerals from conflict-affected and high-risk areas is presented in the tungsten fact sheet. This fact sheet, the second in a series about 3TG minerals, focuses on the tantalum supply chain by listing selected processors that produced tantalum materials commercially worldwide during 2013&ndash;14. It does not provide any information regarding the sources of material processed in these facilities.

Fact Sheet

Twenty-eighth annual report of the Director of the United States Geological Survey

The plan of operations for the last fiscal year, including an itemized statement of the appropriations, amounting to $1,758,720, with the allotments thereof, was approved by the Secretary of the Interior on July 10, 1906. The work of the various branches and divisions conformed to this plan, and a detailed statement of their operations may be found on later pages. On January 23 the former Director, Charles D. Walcott, was appointed to the position of Secretary of the Smithsonian Institution, and his resignation as Director was accepted by the President, becoming effective April 30, 1907. Mr. Walcott has been a member of the Survey since its organization, and the thirteen years of his service as the administrative head of the bureau cover the period of its greatest growth. At the beginning of his directorship Mr. Walcott disclaimed any desire to make radical changes in either the policy or the administration of the Survey as developed under his predecessors, King and Powell, but in his first report, the Director's sixteenth, he mentioned certain readjustments which he deemed desirable in order that the Survey might better meet the economic and educational needs of the country. It is noteworthy that, almost without exception, these improvements have been accomplished, and even more fully than as then outlined. Among these changes may be mentioned : The raising of the standard of the topographic maps, with the representation thereon of land subdivision lines, and the extension of exact leveling and primary triangulation; the placing of the entire topographic and geologic force within the classified service; the obtaining of authority from Congress to issue separates of the annual report in pamphlet form, thus permitting advance publication of chapters of the Mineral Resources report, as well as of papers on economic geology; the enlargement of the work of the divisions of hydrography, mineral resources, and geology, in the last case providing for reconnaissance surveys of regions of economic importance. Equally notable was the growth of the Survey under Mr. Walcott's administration, as shown by the increase in both the extent and the scope of its operations. The appropriations for the last fiscal year amounted to more than four times the total of those made thirteen years ago, and there was, of course, a corresponding increase in the amount of field and office work performed. The development of the relations between the Geological Survey and the public within the same period is measured by a more than fourfold increase in amount of official correspondence, nearly fourfold increase in number of printed pages in the various reports of the year, and a more than fivefold increase in copies of maps printed, while the total annual distribution of publications, books, and maps grew from less than 200,000 to nearly a million copies, the sales increasing from $2,100 to over $18,000. The extent to which the results of the work by this organization are now utilized by both the industrial world and the educational and scientific institutions furnishes the best index of the degree of success attained by Mr. Walcott and his colleagues.

Annual Report

Ground-water supplies of the Ypsilanti area, Michigan

As of the date of this report (August 1945), the major water users in the Ypsilanti area are: (1) the city of Ypsilanti, (2) the Willow Run bomber plant, built by the Federal Government and operated by the Ford Motor Co., and (3) the war housing project of the Federal Public Housing Authority, designated in this report the Willow Run Townsite. The city, bomber plant, and townsite have required large quantities of water for domestic and industrial uses, and the necessary water supplies have been developed from wells. The Federal Works Agency had the responsibility of deciding whether the existing water facilities were adequate to meet the expected demands and determining the character of any additional public water-supply facilities that might be constructed with Federal assistance. In order to appraise the ground-water resources of the area the Federal Works Agency requested the Geological Survey to investigate the adequacy of the existing supplies and the availability of additional water. The present report is the result of the investigation, which was made in cooperation with the Michigan Geological Survey Division. The water supplies of the three major users are obtained from wells penetrating glacial and associated sands and gravels. Supplies for the city of Ypsilanti and the Willow Run bomber plant are obtained from wells in the valley of the Huron River; the supply for the Willow Run Townsite is obtained from wells penetrating glacial gravels underlying the upland northeast of the valley. The bedrock formations of the area either yield little water to wells or yield water that is too highly mineralized for most uses. The water supply for the bomber plant is obtained from three closely spaced, highly productive wells at the northern edge of the Huron River, a little more than 3 miles southeast of Ypsilanti. The water receives complete treatment in a modern treatment plant. River water also can be treated and has been used occasionally in the winter and spring. The average daily pumpage during periods of maximum production at the bomber plant has been 4.5 to 4.75 million gallons. On June 30, 1945, production of bombers was suspended, and the plant went on a. maintenance basis. The water supply of the bomber-plant well field is replenished by recharge from precipitation and from the Huron River. The evidence shows that recharge from the river is one of the principal sources of water and gives assurance both of the adequacy of the present supply and of the availability of additional water if needed. The safe yield of the three existing wells is estimated to be not less than 6 million gallons per day. The Ypsilanti public water supply is obtained from three tubular wells drilled in 1943, which replaced a number of suction-pumped tubular wells and one large dug well. All the wells penetrate sand and gravel in the bend of the Huron River in the southeastern part of Ypsilanti. The water is treated in a modern treatment plant completed in 1939. The average daily pumpage in million gallons was about 1.68 in 1942, 1.70 in 1943, and 1.66 in 1944. Considerable water was furnished to the Willow Run bomber plant from the Ypsilanti public-supply system during the period from August 1941 through March 1943. The available information indicates that the water pumped from the Ypsilanti well field is replenished by ground-water flow from adjacent stretches of the Huron Valley and from the upland areas outside the valley, from precipitation on the valley in the vicinity of the well field, and possibly from the Huron River. It is believed that sufficient water can be obtained from the well field to meet the expected demand for a considerable time. The safe yield of the present wells is estimated to be not less than 3 million gallons per day, and detailed pumping tests might show that still larger supplies could be safely developed. The water supply of the Willow Run Townsite is obtained from four wells in two well fields about 2 miles apart, one well in the northwest or Prospect and Geddes Road field, and three wells in the southeast or Wiard Road field. The pumpage was originally expected to be 2 to 3 million gallons per day, but it averaged only about 450,000 gallons per day from March 1943 through June 1945. The evidence afforded by logs of wells and by pumping tests indicates that the water-bearing gravels at the townsite are covered by relatively impermeable materials and thus that the rate of recharge is low. However, only relatively small declines in water level have occurred during more than 2 years' operation of the wells, indicating that recharge may occur nearby. The safe yield of the present wells is estimated to be 1.0 to 1.5 million gallons per day, and detailed pumping tests might show it to be somewhat greater. The water supply of the Willow Run Townsite has the smallest potential capacity of the three major ground-water supplies in the area; however, the demand has been relatively small, and no difficulty should arise unless this demand increases greatly. The investigation involved the drilling of 13 test wells to locate additional ground-water supplies, on the assumption that the wartime demand for water in the Ypsilanti area might increase beyond the capacity of the present sources. All 13 wells were drilled at sites selected by the Geological Survey. Two wells on the Willow Run Townsite were drilled by the Federal Public Housing Authority and 11 at other sites by the Federal Works Agency. Records of the wells are given in the report and discussed with respect to the availability of water at the different sites; similarly, the results of the controlled pumping tests made on four of the test wells drilled by the Federal Works Agency are analyzed and discussed with respect to the availability of additional water. The combined results of the test drilling and the pumping tests show that emergency supplies of several million gallons per day can be developed at the sites of the test wells. The best site shown by the test drilling is on the south bank of the Huron River opposite the bomber-plant well field, where a Well with a capacity of several thousand gallons per minute could be constructed if necessary. Three wells in the outwash-filled valley now occupied by Fleming Creek, on two of which pumping tests were made, show that emergency supplies ranging from a few hundred thousand to a million gallons per day could be developed at these test-well sites if necessary. Smaller Supplies ranging from a gallon or two per minute to perhaps 100,000 or 200,000 gallons per day could be developed at the sites of the remaining test Wells. Pumping tests made on the supply wells of the three major water users by the consulting-engineering firms who designed the systems are analyzed and discussed briefly by the authors. The report includes maps and graphs showing the surficial geology of the area, the location of wells, and fluctuations of water level in selected wells. Alsp included are tables giving data on water levels and pumpage, chemical analyses of representative ground waters, and records of wells.

Michigan

Shallow geologic framework of the Mississippi Sound and the potential for sediment resources

The Mississippi Sound, an estuarine environment located between the mainland and barrier islands bordering the northern Gulf of America (formerly the Gulf of Mexico), serves as a vital ecosystem for the States of Mississippi and Alabama. Spanning approximately 100 kilometers from east to west and covering 1,400 square kilometers, the sound is home to marine industry and ports, and its shallow and brackish waters sustain a diverse array of marine life. Barrier islands along the southern edge of the sound separate the microtidal estuary from the Gulf of America. This protection from gulf wave action mediates current flow within the sound, resulting in predominantly fine-grained sediment deposition along the seafloor. This study, conducted by the U.S. Geological Survey in cooperation with the U.S. Army Corps of Engineers, provides insight on fluvial and tidal processes spanning the past 5,000 years. The report synthesizes existing research to provide a comprehensive overview of the sound geology, from Pleistocene origins to present-day morphology, and utilizes high-resolution single channel seismic profiles and sediment data to identify and map sedimentary deposits and morphologic features at and below the seafloor. Despite its ecological significance, the Mississippi Sound faces environmental challenges, including water-quality issues, habitat degradation, storm-induced erosion, and the ongoing threats of sea-level rise and environmental changes. This study uses the present-day understanding of the sound's geology to inform coastal management decisions, hazard assessment, and potential mineral resources.

Louisiana, Mississippi

Oil spills, 1971-75, Gulf of Mexico outer continental shelf

Oil spillage connected with federally supervised drilling and production activities has been a matter of wide public concern. In its supervision of mineral-resource development on the Outer Continental Shelf (OCS), the U.S. Geological Survey is responsible for the day-to-day inspection and monitoring of OCS oil and gas operations. During these activities, the U.S. Geological Survey records and investigates hydrocarbon discharges resulting from such operations. Beginning in 1971, all spills have been recorded, and a computer file has been maintained on all spills of 1 barrel or more. The total Gulf of Mexico OCS oil spillage recorded during January 1, 1971-December 31, 1975, amounted to 51,421 barrels. Production during that period amounted to 35,219 barrels per barrel spilled. In all, 5,857 spills were recorded, but 85.5 percent of the total spill volume was contributed by just 5 incidents. The environmental effect of these incidents apparently was minimal and of short duration. No spills of more than 50 barrels resulted from drilling operations during the period. The only spillage resulting from blowouts was caused by nondrilling incidents, including completion, production, and workover. The amount of oil discharged from spills of less than 50 barrels decreased by more than half between 1971 and 1975. The improvement reflects changes in the operating philosophy of the offshore industry, tightening of U.S. Geological Survey operating orders, and substantial increases in the inspection force. Most production-platform spills involve failures in the sump system, the separator system, or other hydrocarbon-handling equipment; improved sump-system designs and better high-low-level controls have reduced both the number and the volume of spills. Pipeline and pump spills also declined significantly, although the decline appears less attributable to revisions in OCS operating requirements. No operator consistently contributed a disproportionate amount of spillage. Most of the platforms having production spills had only one spill during the period. Of the 304 platforms having incidents, 255 had 2 spills or less and 188 had only 1 spill. Comparison of the volume spilled with the volume produced for Gulf of Mexico OCS operations during 1971-75 results in a spillage rate of 0.0028 percent. Spillage from tankers is estimated to be greater. The OCS drilling and production spillage rate is not expected to increase during exploration and development of the frontier areas.

Circular

Environmental processes that affect mineral deposits in the eastern United States

A thorough understanding of the environmental processes that affect mineral deposits and mine wastes has become increasingly important as the Nation wrestles with how to meet our current demand for metals without compromising the environment and how to mitigate the damage caused by the mining practices of previous generations. Regulatory requirements are dominated by empirical approaches to environmental problems associated with mining, but mitigation and reclamation can be enhanced greatly by a theoretical and conceptual understanding of the processes that affect the availability, transport, and fixation of metals and the generation of acidic waters. U.S. Geological Survey (USGS) research efforts in the Eastern United States are concentrating on environmental processes that affect a class of mineral deposits known as massive sulfide deposits. These occurrences were valued historically for their sulfur content and recently for their metals. This deposit type is a research priority because of its economic significance and high potential for adverse environmental impact due to its high sulfide content and the low acid-buffering capacity of host rocks. Numerous examples of these deposits are found in the East, including reclaimed mine sites, abandoned mines, active mines, and sites currently in the permitting process for future production. Published studies of mine drainage chemistry from the Iron Mountain massive sulfide deposit in California have documented extreme conditions of very low pH and high heavy-metal concentrations. These extreme conditions are attributed to the unique hydrologic and climatic settings of the deposit and probably are independent of the mineral deposit type. Areas currently under study include Bald Mountain, Maine, the Great Smoky Mountains National Park, the Vermont copper belt, Contrary Creek, Virginia, and Prince William Forest Park, Virginia (fig.1). Goals of the research are (1) to give land-use planners and the mining industry a better empirical framework from which to assess potential environmental impacts of mining, particularly under eastern climatic conditions, and (2) to provide a better theoretical and conceptual framework from which to design more effective and cost efficient mitigation and reclamation programs.

Information Handout

Diamond-drill exploration of the Rousseau talc prospect, Cambridge, Vermont, and the Barnes Hill prospect, Waterbury, Vermont

The Geological Survey carried out a program of diamond-drilling at two localities in Vermont during the period July-September 1950. The deposits chosen for drilling were two of the more promising talc deposits associated with ultramafic rocks of several that had been mapped earlier by the Geological Survey, but could not be evaluated accurately because critical data were lacking that could be obtained only by sub-surface exploration. The Rousseau talc prospect is in Cambridge township, Lamoille County, Vermont. Surface rights are owned by L. and N. N. Porter; mineral rights are owned by Eastern Magnesia Talc Co. Three drill holes encountered no talc; the other five penetrated from 2 to 110 feet of talc ore. The deposit lies on the west limb of the Green Mountain anticlinorium. The country rock consists of quartz-chlorite-sericite schist and chlorite-albite schist. The schistosity strikes slightly west of north and dips 20° - 40° to the west. The talc deposit is roughly lenticular, and although generally concordant in detail with the schistosity of the country rock, is slightly cross-cutting in overall relationship. The entire deposit is composed of Tit (talc-carbonate rock) and steatite, out is presumably derived from ultramafic igneous rooks which were first serpentinized. The dimensions of the lens are about 700 feet by 500 feet by 130 feet. The talc is of good quality and is suitable, either as a mine run product or as a flotation concentrate, for most industrial uses other than industrial steatite. No pencil stock was encountered. The Barnes hill talc prospect is in Waterbury township, Washington County, Vermont. Surface rights are divided among Donald P. and Glenola Brown, John Barnes, and Eastern Magnesia Talc Co. One drill hole at Barnes hill was barren. The other six penetrated about 20 to 140 feet of talc ore. The deposit lies on the east limb of the Green Mountain anticlinorium. The country rock outside of the ultramafic rock body consists of quartz-chlorite-sericite schist, chlorite-albite schist; and chlorite amphibolite, which strike generally about N, 20° E. and dip steeply to the east. The ultramafic body is elliptical in plan, about 1,600 feet long and 360 feet wide. The vertical dimension is unknown. The original ultramafic rock has been almost completely serpentinized and is extensively altered to grit and steatite. The talc ore is somewhat irregularly distributed throughout the ultramafic body, but it is possible to delineate with considerable confidence portions of the body that consist predominantly of ore. The largest ore bodies are in the eastern and northern parts of the ultramafic body. The ore contains more or less admixed serpentine, and so is only of intermediate to fairly good color (whiteness). It is suitable for many industrial uses in which purity and high whiteness are not necessary. No pencil stock was seen.

Vermont

Central Colorado Assessment Project - Application of integrated geologic, geochemical, biologic, and mineral resource studies

Central Colorado is one of the fastest-growing regions in the Western United States. Population along the Front Range increased more than 30 percent between 1990 and 2000 (http://www.demographia.com/db-metro3newworld.htm) with some counties within the study area, such as Park County, experiencing greater than 100-percent growth (http://www.censusscope.org/us/s8/rank_popl_growth.html). This growth has caused tremendous demand for natural resources and has created challenging land-management issues related to the interface between wilderness and urban expansion. Management of this wilderness/urban interface will benefit from current digital geoscience information collected by the U.S. Geological Survey (USGS) Central Colorado Assessment Project that began in 2003. Approximately 20,800 square miles (53,800 km2) of land divided almost equally between the public and private sectors were part of the assessment. The study area includes much of the Colorado Mineral Belt, a northeast-trending zone that contains 30 economically significant metal deposits. Historically, the area provided much of Colorado's metal production. The only active gold and molybdenum mines in Colorado lie within the study area. Recently, metal and uranium exploration activity has increased sharply in response to record prices for metals and uranium. This further underscores the need for up-to-date geoscience information presented in compatible GIS databases to facilitate rapid land-management decisions. Cooperative studies by USDA Forest Service, National Park Service supported by the USGS Mineral Resources Program (MRP), and National Cooperative Geologic Mapping Programs (NCGMP) contributed to the mineral-resource assessment and included regional geologic mapping at the scale 1:100,000, collection and geochemical studies of stream sediments, surface water, and bedrock samples, macroinvertebrate and biofilm studies in the riparian environment, remote-sensing studies, and geochronology. Geoscience information available as GIS layers has improved understanding of the distribution of metallic, industrial, and aggregate resources, location of areas that have potential for their discovery or development, helped to understand the relation of tectonics, magmatism, and paleohydrology to the genesis of the metal deposits in the region, and provided insight on the geochemical and environmental effects that historical mining and natural, mineralized rock exposures have on surface water, ground water, and aquatic life.

Fact Sheet

Geology of Wisconsin: Survey of 1873-1879, Volume I

The leading purpose df this volume was determined by the following enactment, being section 1, chapter 121, of the Laws of 1876. " The people of the State of Wisconsin, represented in Senate and Assembly, do enact as follows: Section 1. That in the preparation of his final report, the chief geologist be, and he is hereby authorized to collate the general geology and the leading facts and principles relating to the material resources of the State, together with practical suggestions as to the methods of detecting and utilizing the same, so as to constitute the material for a volume suited to the wants of explorers, miners, land owners, and manufacturers, who use crude native products, and to the needs of the schools of the State, and the masses of intelligent people who are not familiar with the principles of geology; said volume to be written in clear, plain language, with explanations of technical terms, and to be properly illustrated with maps and diagrams, and to be so arranged as to constitute a key to the more perfect understanding of the whole report." To subserve the purposes thus legally defined, the volume will be found to consist of three distinct portions; Part I, embracing the General Geology of the State, with explanatory matter; Part II, consisting of lists of the minerals, rocks and life-products of the State, with descriptions and auxiliary discussions; and Part III, embracing industrial descriptions and practical suggestions with reference to the leading natural resources of the State.

Wisconsin

Aptian ‘Shale Gas’ Prospectivity in the Downdip Mississippi Interior Salt Basin, Gulf Coast, USA

This study evaluates regional ‘shale gas’ prospectivity of the Aptian section (primarily Pine Island Shale) in the downdip Mississippi Salt Basin (MSB). Previous work by the U.S. Geological Survey estimated a mean undiscovered gas resource of 8.8 trillion cubic feet (TCF) in the chronostratigraphic-equivalent Pearsall Formation in the Maverick Basin of south Texas, where industry has established a moderately successful horizontal gas and liquids play. Wells penetrating the downdip MSB Aptian section at depths of 12,000-15,000 ft were used to correlate formation tops in a 15-well cross-section extending about 200 miles (mi) east-southeastward from Adams Co. to Jackson Co. Legacy cuttings from these wells were analyzed for thermal maturity and source rock quality. Bitumen reflectance (n=53) increases with increasing present-day burial depth in the east-central study area from 1.0% to 1.7%. As the Aptian section shallows in Adams Co. to the west, bitumen Ro values are higher (1.7-2.0%), either from relatively greater heat flux or greater mid-Cenomanian uplift and erosion in this area. Total organic carbon (TOC) content ranges 0.01-1.21 and averages 0.5 wt.% (n=51); pyrolysis output (S2; n=51) averages 0.40 mg HC/g rock, indicating little present-day hydrocarbon-generative potential. Bitumen reflectance is preferred as a thermal maturity parameter as Tmax values are unreliable. Normalized X-ray diffraction (XRD) mineral analyses (n=26) indicate high average clay abundance (53 wt.%) relative to quartz (29%) and carbonate (18%). Mineral content shows a spatial relationship to an Appalachian orogen clastic sediment source, with proximal high clay and quartz and distal high carbonate content. Clastic influx from the Appalachian orogen is confirmed by detrital zircon U-Pb ages with dominant Grenville and Paleozoic components [105 ages from a Rodessa sandstone and 112 ages from a Paluxy (Albian) sandstone]. Preliminary information from fluid inclusion microthermometry (41 aqueous measurements from calcite cements in one argillaceous James Limestone sample) indicates homogenization temperatures (Th) of 120-135°C, consistent with present-day bottom-hole conditions and measured bitumen Ro values towards the western end of the MSB. Downdip in the central MSB, microthermometry (26 aqueous measurements from quartz dust rims in one Paluxy sandstone sample) and measured bitumen Ro values indicate maximum temperatures may have been significantly higher (~25°C) than present-day conditions. High inclusion salinities (15-25 wt.% salt) at both locations suggest interaction of pore fluids with evaporites. Mercury injection capillary pressure (MICP) analyses (n=3) indicate porosity ranges 1.3-2.1% and permeability 0.006-0.02 µD for Pine Island and Rodessa shales. Overall, results from this work indicate generally poor ‘shale gas’ prospectivity compared to other shale reservoirs based primarily on depth, low organic content, low porosity, and high clay content. However, thickness and thermal maturity are appropriate, moderate reservoir pressures are present, and petroleum systems modelling by others has indicated high undiscovered gas potential for the basin as a whole.

Conference Paper

Geology for a changing world 2010-2020-Implementing the U.S. Geological Survey science strategy

This report describes a science strategy for the geologic activities of the U.S. Geological Survey (USGS) for the years 2010-2020. It presents six goals with accompanying strategic actions and products that implement the science directions of USGS Circular 1309, 'Facing Tomorrow's Challenges-U.S. Geological Survey Science in the Decade 2007-2017.' These six goals focus on providing the geologic underpinning needed to wisely use our natural resources, understand and mitigate hazards and environmental change, and understand the relationship between humans and the environment. The goals emphasize the critical role of the USGS in providing long-term research, monitoring, and assessments for the Nation and the world. Further, they describe measures that must be undertaken to ensure geologic expertise and knowledge for the future. The natural science issues facing today's world are complex and cut across many scientific disciplines. The Earth is a system in which atmosphere, oceans, land, and life are all connected. Rocks and soils contain the answers to important questions about the origin of energy and mineral resources, the evolution of life, climate change, natural hazards, ecosystem structures and functions, and the movements of nutrients and toxicants. The science of geology has the power to help us understand the processes that link the physical and biological world so that we can model and forecast changes in the system. Ensuring the success of this strategy will require integration of geological knowledge with the other natural sciences and extensive collaboration across USGS science centers and with partners in Federal, State, and local agencies, academia, industry, nongovernmental organizations and, most importantly, the American public. The first four goals of this report describe the scientific issues facing society in the next 10 years and the actions and products needed to respond to these issues. The final two goals focus on the expertise and infrastructure needed to ensure the long-term sustainability of the geological sciences in the USGS. The ultimate goal of USGS science and of the strategy laid out in this document is to contribute to the development of a sustainable society that operates in harmony with the Earth systems that society depends upon. As we begin the second decade of the 21st century, our Nation faces growing challenges in resource availability, climate and environmental change, and natural hazards. Meeting these challenges will require strong collaboration across the natural and social sciences and extensive partnerships with both the public and private sectors. The six goals described in this document represent a mix of scientific focus areas and operational necessities that together provide a comprehensive roadmap for USGS geologic science to effectively contribute to the USGS mission, providing science for a changing world.

Circular

Proceedings for a workshop on deposit modeling, mineral resource assessment, and their role in sustainable development

The world's use of nonfuel mineral resources continues to increase to support a growing population and increasing standards of living. The ability to meet this increasing demand is affected especially by concerns about possible environmental degradation associated with minerals production and by competing land uses. What information does the world need to support global minerals development in a sustainable way? Informed planning and decisions concerning sustainability and future mineral resource supply require a long–term perspective and an integrated approach to resource, land use, economic, and environmental management worldwide. Such perspective and approach require unbiased information on the global distribution of identified and especially undiscovered resources, the economic and political factors influencing their development, and the potential environmental consequences of their exploitation. The U.S. Geological Survey and the former Deposit Modeling Program of the International Union of Geological Sciences (IUGS) of the United Nations Educational, Scientific and Cultural Organization (UNESCO) sponsored a workshop on "Deposit Modeling, Mineral Resource Assessment, and Their Role in Sustainable Development" at the 31st International Geological Congress (IGC) in Rio de Janeiro, Brazil, on August 18–19, 2000. The purpose of the workshop was to review the state-of-the-art in mineral deposit modeling and resource assessment and to examine the role of global assessments of nonfuel mineral resources in sustainable development. The workshop addressed questions such as the following: Which of the available mineral deposit models and assessment methods are best suited for predicting the locations, deposit types, and amounts of undiscovered nonfuel mineral resources remaining in the world? What is the availability of global geologic, mineral deposit, and mineral exploration information? How can mineral resource assessments be used to address economic and environmental issues? Presentations included overviews of assessment methods applied in previous national and other small-scale assessments of large regions and of the resulting assessment products and their uses. Twenty-seven people from Canada, China, Finland, Germany, Japan, Peru, Slovenia, South Africa, United States, and Venezuela participated in the 2-day post-Congress workshop. The attendees represented academia, government, environmental organizations, and the mining industry.

Circular

Methodology and technical input for the 2025 U.S. List of Critical Minerals—Assessing the potential effects of mineral commodity supply chain disruptions on the U.S. economy

The Secretary of the Interior, acting through the Director of the U.S. Geological Survey, is tasked by section 7002 (“Mineral Security”) of title VII (“Critical Minerals”) of the Energy Act of 2020 (Public Law 116–260, December 27, 2020, 116th Congress) with reviewing and revising the methodology used to evaluate mineral commodity supply risk and the U.S. List of Critical Minerals (LCM) no less than every 3 years. Following two previous LCM assessments, this analysis represents the latest technical input for evaluating each mineral commodity’s supply risk and determining their recommended status on the LCM. We evaluated mineral commodity supply risk using two criteria: (1) an economic effects assessment that quantified the potential effects of various trade disruption scenarios on the U.S. economy, and (2) an examination of whether the mineral commodity’s U.S. supply chain relied on a sole domestic producer that represented a single point of failure. For the first criterion, postdisruption equilibrium quantities and prices for each mineral commodity were calculated based on their price elasticities of supply and demand and the availability of excess production capacity for each yearlong foreign trade disruption scenario. Subsequently, a nonlinear optimization routine was used with detailed economic input-output tables to estimate the potential economic effects on the U.S. economy of over 1,200 scenarios for 84 mineral commodities. After accounting for the probability of each scenario’s occurrence, the overall results are presented in terms of changes in U.S. gross domestic product (GDP) by individual industry and the economy overall. The results, which ranged from a net decrease in U.S. GDP of nearly $4.5 billion to a net increase of $33 million, largely reflect U.S. import dependency and world production concentration. Using the Jenks natural breaks optimization method, a statistical classification technique, we categorized the mineral commodities into several classes based on this overall risk quantification. Mineral commodities with annualized probability-weighted net decreases in U.S. GDP greater than $2 million were recommended for inclusion on the LCM. If a mineral commodity did not meet the threshold for inclusion on the LCM under the first criterion, its domestic supply chain was examined under the second criterion, which recommended a mineral commodity for inclusion on the LCM if there was only a single domestic producer. Ultimately, the two criteria resulted in the recommendation of the addition of six mineral commodities (in descending risk order, potash, silicon, copper, silver, rhenium, and lead) to and the removal of two mineral commodities (arsenic and tellurium) from the LCM. By using an economic effects assessment, the results of this analysis provide a prioritization that can also be compared directly against other risk analyses and the cost of various risk mitigation strategies.

Open-File Report