USGS · twri03A1
General field and office procedures for indirect discharge measurements
Abstract
The discharge of streams is usually measured by the current-meter method. During flood periods, however, it is frequently impossible or impractical to measure the discharges by this method when they occur. Consequently, many peak discharges must be determined after the passage of the flood by indirect methods, such as slope-area, contracted-opening, flow-over-dam, and flow-through-culvert, rather than by direct current-meter measurement. Indirect methods of determining peak discharge are based on hydraulic equations which relate the discharge to the water-surface profile and the geometry of the channel. A field survey is made after the flood to determine the location and elevation of high-water marks and the characteristics of the channel. Detailed descriptions of the general procedures used in collecting the field data and in computing the discharge are given in this report. Each of the methods requires special procedures described in subsequent chapters.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
M. A. Benson, Tate Dalrymple. 2001-04-01. General field and office procedures for indirect discharge measurements. https://doi.org/10.3133/twri03a1
Cite the original work for its findings. Save a collection to share your selection of sources.