Abstract

The U.S. Geological Survey (USGS) collaborated with European geologists to assess resources in porphyry copper deposits in Europe, exclusive of Scandinavia (Sweden, Denmark, Norway, and Finland) and Russia. Porphyry copper deposits in Europe are Paleozoic and Late Cretaceous to Miocene in age. A number of the 31 known Phanerozoic deposits contain more than 1 million metric tons of contained copper, including the Majdanpek deposit, Serbia; Assarel, Bulgaria; Skouries, Greece; and Rosia Poeni, Romania. Five geographic areas were delineated as permissive tracts for post-Paleozoic porphyry copper deposits. Two additional tracts were delineated to show the extent of permissive igneous rocks associated with porphyry copper mineralization related to the Paleozoic Caledonian and Variscan orogenies. The tracts are based on mapped and inferred subsurface distributions of igneous rocks of specific age ranges that define areas where the occurrence of porphyry copper deposits within 1 kilometer of the Earth’s surface is possible. These tracts range in area from about 4,000 to 93,000 square kilometers. Although maps at a variety of different scales were used in the assessment, the final tract boundaries are intended for use at a scale of 1:1,000,000. The post-Paleozoic deposits in Europe all formed in conjunction with the tectonic evolution of southern Europe as the former Tethyan Ocean closed by convergence of the African and Arabian Plates with Europe, accompanied by accretion of microcontinents to the southern Eurasian Plate and development and demise of magmatic arcs and ocean basins. Many of the deposits formed in extensional or post-collisional settings; these tectonic environments are increasingly being recognized as environments where porphyry copper deposits occur. Probabilistic estimates of undiscovered porphyry copper deposits were made for four Phanerozoic permissive tracts; the other tracts are discussed qualitatively. Assessment participants estimated numbers of undiscovered deposits at different levels of confidence for the four tracts. These estimates were then combined with grade and tonnage models using Monte Carlo simulation to generate probabilistic estimates of amounts of in-place undiscovered resources. Additional resources that may be present in extensions of known deposits were not evaluated. Assessment results are reported in tables and graphs as expected amounts of metal and rock in undiscovered deposits at different quantile levels, as well as the arithmetic mean for each commodity for each tract. This assessment estimated a mean of 14 undiscovered porphyry copper deposits within the four permissive tracts for which estimates were made. On the basis of global grade and tonnage models, mean (arithmetic) estimated resources that could be associated with undiscovered deposits are about 46 million metric tons of copper and about 2,600 metric tons of gold, as well as byproduct molybdenum and silver. Reliable reported identified resources for the 27 deposits in the assessed areas total about 44 million metric tons of copper and about 2,300 metric tons of gold. Exploration for gold-rich porphyry systems is ongoing in some parts of historical copper mining districts in central Europe and in northwesternmost (European) Turkey. Political and social conflicts, environmental concerns associated with historical mining, and the global economic situation have had negative effects on exploration, development, and mining in Europe for many years. The assessment includes an overview with summary tables. Detailed descriptions of each tract, including the rationales for delineation and assessment, are given in appendixes A–G. Appendix H describes a geographic information system (GIS) that includes tract boundaries and point locations of known porphyry copper deposits and significant prospects.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 38.8225909761771° to 56.69244163539978° latitude; -5.6689453125° to 29.0478515625° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

David M. Sutphin, Jane M. Hammarstrom, Lawrence J. Drew, Duncan E. Large, Byron R. Berger, Connie Dicken, Michael W. DeMarr, Mario with contributions from Billa, Joseph A. Briskey, Daniel Cassard, Andor Lips, Zdenek Pertold, Emilian Rosu. 2013. Porphyry copper assessment of Europe, exclusive of the Fennoscandian Shield: Chapter K in Global mineral resource assessment. https://doi.org/10.3133/sir20105090k

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Evaluating the number of realizations (train-test splits) necessary to ensure robust estimates of conventional hydrothermal resource favorability using Monte Carlo cross-validation, the Great Basin, Western USA

Supervised machine learning approaches used to produce favorability maps in resource assessments commonly partition an input dataset into training and testing subsets (that is, through train-test splits). However, if a single split is not representative of underlying resource conditions, the resulting favorability map may be biased, particularly with sparse or heterogeneous datasets. To mitigate the potential for unrepresentative favorability maps, recent works by U.S. Geological Survey researchers have used Monte Carlo cross-validation to implement a large number ( n) of randomized train-test splits to produce n realizations. The realizations are then aggregated using cell-wise median predictions to produce the resulting final favorability map, recognizing that the median will remove extreme values that might have been estimated from a comparatively few unrepresentative realizations. Theoretically, the median prediction at every cell converges to a single estimate as n approaches infinity, and the question addressed herein is: How many realizations are necessary to get a robust estimate (that is, an estimate unaffected by additional realizations)? Therefore, convergence metrics are described to identify the number of train-test splits and realizations needed to make a reliable map using the data and supervised machine learning workflow for conventional hydrothermal resource assessment of the Great Basin of the Western United States. For this study, robust prediction occurs with n approximately equal to 600 realizations, and smaller ensembles (for example, n is approximately equal to 200 or even 100) may be suitable during preliminary or exploratory analyses. Although the resulting threshold numbers will vary depending on the data and modeling approach used, the convergence metrics proposed and applied herein are applicable to other supervised machine learning studies that use Monte Carlo cross-validation.

Scientific Investigations Report↗

Groundwater budget for the Portneuf River Basin, southeastern Idaho

The U.S. Geological Survey, in cooperation with the Idaho Department of Water Resources, developed the first groundwater budget for the upper Portneuf River Basin in southeastern Idaho, a tributary of the Snake River. A groundwater budget for the Portneuf River Basin supports water resource and administrative management decisions within the basin and for downstream users of the eastern Snake River Plain aquifer. The analysis quantifies inflows, outflows, and residuals for an aquifer system defined by the Idaho Department of Water Resources under three recent precipitation conditions: an average year (2016), a dry year (2021), and a wet year (2023). The budget was calculated for the basin and for two subbasins delineated by the U.S. Geological Survey streamgage Portneuf River at Topaz, Idaho (13073000): the above Topaz subbasin, which includes the Portneuf-Gem valley, and the below Topaz subbasin, which includes Marsh Valley. Aquifer inflows include mountain-front recharge; areal recharge; recharge from applied water, including recharge from irrigation, canal seepage, and effluent returns; groundwater flow into the basin; and reservoir seepage. Outflows include groundwater pumping for agricultural, municipal, and domestic uses; subsurface outflow through the Portneuf gap; and discharge to streams as base flow. Estimated annual inflows for the full basin ranged from 116,880 acre-feet in 2021 to 154,880 acre-feet in 2023, and outflows ranged from 132,190 acre-feet in 2016 to 158,490 acre-feet in 2023. Basinwide residuals, the change in storage plus uncertainty, were −2,410 acre-feet in 2016, −18,410 acre-feet in 2021, and −3,610 acre-feet in 2023, and each subbasin had a mixture of negative and positive residuals. These basinwide results, interpreted as change in storage plus water-budget uncertainty, indicate minor net losses that increase with dry conditions, consistent with well depth-to-water measurements indicating gradual multi-decadal declines. Patterns in subbasin residuals are driven by irrigation practices and surface-water management; for example, the above Topaz subbasin relies more on groundwater for irrigation, resulting in more negative residuals during dry years. In contrast, the below Topaz subbasin depends more on surface water, producing positive residuals during dry years because of irrigation losses and canal seepage. The analyses for both subbasins indicate decades-long groundwater declines, which agree with the overall negative residuals calculated. The largest sources of uncertainty include climate inputs (precipitation and evapotranspiration) and poorly constrained components such as groundwater inflow and tributary stream infiltration. These findings provide insight into how climatic variables and irrigation practices affect groundwater inflows and outflows within the Portneuf River Basin.

Idaho↗

World minerals outlook—Antimony, copper, graphite, niobium, potash, silicon, silver, and tungsten through 2030

Demand for mineral commodities continues to increase owing to rapid technological advancements and global economic growth. To support this increase in demand, information about current and near-term supplies of these mineral commodities is essential. Such data help evaluate the health and stability of global supply chains and protect against potential supply risks. Current production and production capacity data coupled with information regarding near-term expected changes (such as facility closures, planned expansions, or the completion of new mineral production projects) can provide insight into expected future market developments and expected available supply of mineral commodities. This report within the “World Minerals Outlook” series analyzes data for antimony, copper, natural graphite, niobium, potash, silicon metal, silver, and tungsten—eight mineral commodities listed in the 2025 List of Critical Minerals. World production data from 2019 through 2025, as well as estimated world capacity data from 2023 through 2025 were analyzed. Using these data, near-term (2026–2030) expected world capacities were estimated. For antimony, copper, niobium, silicon metal, silver, and tungsten, modest increases in production capacity of 4 to 10 percent were expected between 2025 and 2030, whereas capacities for natural graphite and potash were expected to increase by about 18 to 20 percent.

Scientific Investigations Report↗