Evaluation of four structural best management practices for highway runoff in Beaufort and Colleton Counties, South Carolina, 2005–2006

Abstract

From 2005 to 2006, the U.S. Geological Survey worked cooperatively with the South Carolina Department of Transportation in Beaufort and Colleton Counties, South Carolina, to assess the performance of four different structural devices that served as best management practices (BMPs). These structural devices were installed to mitigate the effects of stormwater runoff on waterways near State roads. The South Carolina Department of Transportation is required to address the quality of stormwater runoff from State-maintained roadways as part of the National Pollutant Discharge Elimination System stormwater program mandated in the Clean Water Act. The performance assessment of the four structural best management practices was based on stormflow measurements and chemical analyses of stormwater-quality samples collected during a 20-month period from March 2005 through October 2006, which represented a range of seasons and rainfall intensities. A total of 49 sample sets that included stormwater from the inlet and outlet of each of the four structural devices were collected as flow-weighted composites to provide event-mean concentrations of suspended sediment, nutrients, and trace metals. In addition, each set included grab samples that were collected to provide the first flush concentrations of oil and grease and fecal-indicator bacteria. A tiered statistical approach was used in the data analysis. Performances of the four structural BMPs were assessed individually based on how well the BMPs were able to reduce the selected constituents. Descriptive statistics and nonparametric Wilcoxon signed rank tests were applied to event-mean concentrations and loads in the water entering the inlet and in the water leaving the outlet of each BMP for each constituent to identify if significant reductions occurred. If significant reductions occurred, the BMP was considered efficient at reducing the constituent. To quantify efficiency, a simplistic approach was applied to compute mean and geometric mean efficiency ratios for the significantly reduced constituents in each BMP. Each BMP performance was ranked based on its computed efficiency ratios, however, the computed efficiency ratios were not sufficient to determine if statistical differences occurred among the performances of the four BMPs. Consequently, a more complex approach was used to apply statistical comparison tests to reduction percentages computed for individual storms (a modified removal efficiency of individual storm-load approach) to determine if differences in event-mean concentrations, loads, and reduction percentages for significantly reduced constituents occurred among the four structural BMPs. Overall, the four BMPs were efficient in reducing suspended-sediment event-mean concentrations and loads in the stormwater entering the inlets of the BMPs to significantly lower event-mean concentrations before discharging the stormwater from the outlets. The cumulative suspended-sediment event-mean load in stormwater entering the BMPs from the storms sampled during the data-collection period was 1,026 kilograms (1.13 tons). The BMPs removed a cumulative suspended-sediment load of 558 kilograms (0.62 ton). The BMPs tended to preferentially trap the sand-size fraction of the sediment, thereby releasing a greater percentage of fine-grained (silt and clay) sediment in the water discharging from the outlet. The preferential trapping of fine-grained sediment by the BMPs could explain, at least in part, why the BMPs were not successful at significantly reducing these constituents. In general, the four BMPs were not successful at significantly reducing fecal bacteria, nutrients, and total organic carbon (including associated properties of biochemical oxygen demand and chemical oxygen demand). Three of the four BMPs significantly lowered oil and grease concentrations before the stormwater discharged from the outlet. Additionally, only one BMP was effective at reducing all total and particulate trace-metal event-mean concentrations and particulate trace-metal event-mean loads in stormwater entering the inlet. With respect to trace-metal event-mean concentrations, however, minimal or no improvement in outlet water quality was observed for the four BMPs, and the majority of the outlet concentrations were above the established acute and chronic aquatic-life criteria by the South Carolina Department of Health and Environmental Control. No statistical differences among the removal-efficiency of the four BMPs were determined for suspended-sediment event-mean concentrations, total suspended solids event-mean concentrations, or oil and grease concentrations. These statistical findings indicated that differences among the mean efficiency ratios were not significant among the BMPs for these properties. Additionally, one BMP generally had statistically greater removal efficiency for total and particulate cadmium, copper, lead, and zinc than one or more of the other three BMPs. Statistical correlation tests were unable to identify a single major factor that would explain the high variability in inlet and outlet water concentrations and in removal efficiencies estimated by reduction percentage. Highly variable inlet and outlet concentrations for each BMP that produced highly variable reduction percentages were probably the result of multiple interacting factors, particularly rainfall intensity, the amount of rainfall between sampling events, traffic density, and the period of time since the last maintenance (clean out) of the BMP.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 32.4167° to 32.7811° latitude; -80.7811° to -80.6417° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kevin J. Conlon, Celeste A. Journey. 2008. Evaluation of four structural best management practices for highway runoff in Beaufort and Colleton Counties, South Carolina, 2005–2006. https://doi.org/10.3133/sir20085150

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Evaluating the number of realizations (train-test splits) necessary to ensure robust estimates of conventional hydrothermal resource favorability using Monte Carlo cross-validation, the Great Basin, Western USA

Supervised machine learning approaches used to produce favorability maps in resource assessments commonly partition an input dataset into training and testing subsets (that is, through train-test splits). However, if a single split is not representative of underlying resource conditions, the resulting favorability map may be biased, particularly with sparse or heterogeneous datasets. To mitigate the potential for unrepresentative favorability maps, recent works by U.S. Geological Survey researchers have used Monte Carlo cross-validation to implement a large number ( n) of randomized train-test splits to produce n realizations. The realizations are then aggregated using cell-wise median predictions to produce the resulting final favorability map, recognizing that the median will remove extreme values that might have been estimated from a comparatively few unrepresentative realizations. Theoretically, the median prediction at every cell converges to a single estimate as n approaches infinity, and the question addressed herein is: How many realizations are necessary to get a robust estimate (that is, an estimate unaffected by additional realizations)? Therefore, convergence metrics are described to identify the number of train-test splits and realizations needed to make a reliable map using the data and supervised machine learning workflow for conventional hydrothermal resource assessment of the Great Basin of the Western United States. For this study, robust prediction occurs with n approximately equal to 600 realizations, and smaller ensembles (for example, n is approximately equal to 200 or even 100) may be suitable during preliminary or exploratory analyses. Although the resulting threshold numbers will vary depending on the data and modeling approach used, the convergence metrics proposed and applied herein are applicable to other supervised machine learning studies that use Monte Carlo cross-validation.

Scientific Investigations Report↗

Groundwater budget for the Portneuf River Basin, southeastern Idaho

The U.S. Geological Survey, in cooperation with the Idaho Department of Water Resources, developed the first groundwater budget for the upper Portneuf River Basin in southeastern Idaho, a tributary of the Snake River. A groundwater budget for the Portneuf River Basin supports water resource and administrative management decisions within the basin and for downstream users of the eastern Snake River Plain aquifer. The analysis quantifies inflows, outflows, and residuals for an aquifer system defined by the Idaho Department of Water Resources under three recent precipitation conditions: an average year (2016), a dry year (2021), and a wet year (2023). The budget was calculated for the basin and for two subbasins delineated by the U.S. Geological Survey streamgage Portneuf River at Topaz, Idaho (13073000): the above Topaz subbasin, which includes the Portneuf-Gem valley, and the below Topaz subbasin, which includes Marsh Valley. Aquifer inflows include mountain-front recharge; areal recharge; recharge from applied water, including recharge from irrigation, canal seepage, and effluent returns; groundwater flow into the basin; and reservoir seepage. Outflows include groundwater pumping for agricultural, municipal, and domestic uses; subsurface outflow through the Portneuf gap; and discharge to streams as base flow. Estimated annual inflows for the full basin ranged from 116,880 acre-feet in 2021 to 154,880 acre-feet in 2023, and outflows ranged from 132,190 acre-feet in 2016 to 158,490 acre-feet in 2023. Basinwide residuals, the change in storage plus uncertainty, were −2,410 acre-feet in 2016, −18,410 acre-feet in 2021, and −3,610 acre-feet in 2023, and each subbasin had a mixture of negative and positive residuals. These basinwide results, interpreted as change in storage plus water-budget uncertainty, indicate minor net losses that increase with dry conditions, consistent with well depth-to-water measurements indicating gradual multi-decadal declines. Patterns in subbasin residuals are driven by irrigation practices and surface-water management; for example, the above Topaz subbasin relies more on groundwater for irrigation, resulting in more negative residuals during dry years. In contrast, the below Topaz subbasin depends more on surface water, producing positive residuals during dry years because of irrigation losses and canal seepage. The analyses for both subbasins indicate decades-long groundwater declines, which agree with the overall negative residuals calculated. The largest sources of uncertainty include climate inputs (precipitation and evapotranspiration) and poorly constrained components such as groundwater inflow and tributary stream infiltration. These findings provide insight into how climatic variables and irrigation practices affect groundwater inflows and outflows within the Portneuf River Basin.

Idaho↗

World minerals outlook—Antimony, copper, graphite, niobium, potash, silicon, silver, and tungsten through 2030

Demand for mineral commodities continues to increase owing to rapid technological advancements and global economic growth. To support this increase in demand, information about current and near-term supplies of these mineral commodities is essential. Such data help evaluate the health and stability of global supply chains and protect against potential supply risks. Current production and production capacity data coupled with information regarding near-term expected changes (such as facility closures, planned expansions, or the completion of new mineral production projects) can provide insight into expected future market developments and expected available supply of mineral commodities. This report within the “World Minerals Outlook” series analyzes data for antimony, copper, natural graphite, niobium, potash, silicon metal, silver, and tungsten—eight mineral commodities listed in the 2025 List of Critical Minerals. World production data from 2019 through 2025, as well as estimated world capacity data from 2023 through 2025 were analyzed. Using these data, near-term (2026–2030) expected world capacities were estimated. For antimony, copper, niobium, silicon metal, silver, and tungsten, modest increases in production capacity of 4 to 10 percent were expected between 2025 and 2030, whereas capacities for natural graphite and potash were expected to increase by about 18 to 20 percent.

Scientific Investigations Report↗