USGS ScienceSearch

USGS · sir20085080

Estimated Loads of Suspended Sediment and Selected Trace Elements Transported through Milltown Reservoir in the Upper Clark Fork Basin, Montana, Water Years 2004-07

Abstract

The purpose of this report is to present estimated daily and annual loads of suspended sediment and selected trace elements for water years 2004-07 at two sites upstream and one site downstream from Milltown Reservoir. Milltown Reservoir is a National Priorities List Superfund site in the upper Clark Fork basin of western Montana where sediments enriched in trace elements from historical mining and ore processing have been deposited since the construction of Milltown Dam in 1907. The estimated loads were used to quantify annual net gains and losses (mass balance) of suspended sediment and trace elements within Milltown Reservoir before and after June 1, 2006, which was the start of Stage 1 of a permanent drawdown of the reservoir in preparation for removal of Milltown Dam. This study was done in cooperation with the U.S. Environmental Protection Agency. Daily loads of suspended sediment were estimated for water years 2004-07 by using either high-frequency sampling as part of daily sediment monitoring or regression equations relating suspended-sediment discharge to streamflow. Daily loads of unfiltered-recoverable arsenic, cadmium, copper, iron, lead, manganese, and zinc were estimated by using regression equations relating trace-element discharge to suspended-sediment discharge. Regression equations were developed from data for eriodic water-quality samples collected during water years 2004-07. The equations were applied to daily records of either streamflow or suspended-sediment discharge to produce estimated daily loads. Variations in daily suspended-sediment and trace-element loads generally coincided with variations in streamflow. For most of the period before June 1, 2006, differences in daily loads transported to and from Milltown Reservoir were minor or indicated small amounts of deposition; however, losses of suspended sediment and trace elements from the reservoir occurred during temporary drawdowns in July-August 2004 and October-December 2005. After the start of Stage 1 of the permanent drawdown on June 1, 2006, losses of suspended sediment and trace elements from the reservoir persisted for all streamflow conditions during the entire interval of the Stage 1 drawdown (June 1, 2006-September 30, 2007) within the study period. Estimated daily loads of suspended sediment and trace elements were summed for each year to produce estimated annual loads used to determine the annual net gains (deposition) or losses (erosion) of each constituent within Milltown Reservoir during water years 2004-07. During water year 2004, there was an annual net gain of suspended sediment in the reservoir. The annual net gains and losses of trace elements were inconsistent in water year 2004, with gains occurring for arsenic ad iron, but losses occurring for cadmium, copper, lead, manganese, and zinc. In water year 2005, there were annual net gains of suspended sediment and all the trace elements within the reservoir. In water year 2006, there were annual net losses of all constituents from the reservoir, likely as the result of sediment erosion from the reservoir during both a temporary drawdown in October-December 2005 and Stage 1 of the permanent drawdown that continued after June 1, 2006. In water year 2007, when the Stage 1 drawdown was in effect for the entire year, there were large annual net losses of suspended sediment and trace elements from the reservoir. The annual net losses of constituents from Milltown Reservoir in water year 2007 were the largest of any year during the 2004-07 study period. In water year 2007, the annual net loss of suspended sediment from the reservoir was 130,000 tons, which was more than double (about 222 percent) the combined inflow to the reservoir. The largest annual net losses of trace elements in water year 2007, in percent of the combined inflow to the reservoir, occurred for cadmium, copper, lead, and zinc-about 190 percent for cadmium, 170 percent for copper, 150 percent for lead, and 238 p

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 45.75° to 47° latitude; -114.5° to -112° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

John H. Lambing, Steven K. Sando. 2008. Estimated Loads of Suspended Sediment and Selected Trace Elements Transported through Milltown Reservoir in the Upper Clark Fork Basin, Montana, Water Years 2004-07. https://doi.org/10.3133/sir20085080

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Monitoring recreation on federally managed lands and waters—Aspects of visitor use

Federally managed public lands and waters receive around 1 billion recreational visits each year. Data on these visitors can aid in guiding policy decisions, managing resources effectively, and communicating the economic contributions of lands and waters. This report explores the methods used by agencies to collect data on aspects of recreational visitor use to Federal lands and waters (apart from visitation numbers, which are the focus of a companion publication). Aspects of recreational visitor use include visitor demographics, recreational activity participation, visitor satisfaction, visitor attitudes and experiences, trip characteristics, and economic contributions. We review practices used to understand aspects of visitor use across seven Federal agencies, revealing similarities such as the use of visitor intercept surveys and coverage of similar topic areas, and differences in how survey programs are operationalized and how specific questions on visitor surveys are worded. We also evaluate emerging technologies, such as geolocated social media and mobile device location data, for their potential to aid in understanding aspects of visitor use. This report concludes with potential opportunities to enhance data collection and coordination, ensuring cost-effective data collection and informed decision making.

Scientific Investigations Report

Evaluation of best management practices at an edge-of-field site in the Eagle Creek watershed, Ohio, 2012–20

In 2010, the U.S. Geological Survey worked in partnership with the Great Lakes Restoration Initiative and the Natural Resources Conservation Service to identify farm fields in priority watersheds—watersheds critically important to Great Lake health. Intensive best management practices were implemented in five States to test the efficacy of best management practices, also referred to as agricultural conservation practices, to reduce sediment and nutrient runoff on agricultural fields. These fields were chosen as representatives of the priority watersheds because their farming practices and geographical conditions were common among farms in those watersheds. A farm site located near Findlay, Ohio, in the Eagle Creek watershed used two conservation practices, cover crop (Natural Resources Conservation Service practice standard 340) and variable rate technology (VRT; Natural Resources Conservation Service practice standard 590), which represent common practices in the Maumee priority watershed. This study monitored surface runoff and subsurface tile runoff at the Eagle Creek watershed site. The effects of cover crop and VRT nutrient application on sediment and nutrient runoff were assessed from October 2012 to September 2020. Cover crops were applied in fall of 2016, 2017, and 2018, coinciding with VRT applications. The following parameters were analyzed as part of the study: runoff discharge; peak discharge; and concentrations and loads of total phosphorus, particulate phosphorus, dissolved reactive phosphorus, and suspended sediment. High peak runoff events disproportionally affected nutrient concentrations and loads in runoff. A threshold of the 85th percentile of the peak discharge was chosen to assess the effect of cover crop and VRT nutrient application on nutrient mitigation at each gage. Runoff events below the 85th percentile were considered small, and runoff events over the 85th percentile were considered large. Concentrations from collected water-quality samples were used for the analysis; estimated concentrations were excluded from the statistical evaluation. All surface runoff parameters during small runoff events, except surface runoff volume, were significantly lower in the period with cover crops and VRT implementation. Contrarily, subsurface runoff parameters during small events were not statistically different between the periods with and without cover crops and VRT implementation. Surface and subsurface parameters during large events were also not statistically different between the periods with and without cover crops and VRT implementation. These results indicate cover crops and VRT may improve water quality during small runoff events, but additional best management practices that mitigate large runoff events may lead to greater water-quality improvement given the contribution of large events to overall losses.

Ohio

Continuous monitoring and temporal variability of fluorescence of dissolved organic matter in karst groundwater of the Edwards aquifer, south-central Texas, 2019–24

Widespread urbanization on the Edwards aquifer recharge zone in south-central Texas has prompted the development of new approaches and tools for evaluating the current and future status of water quality in the San Antonio and Barton Springs segments of the Edwards aquifer. The U.S. Geological Survey, in cooperation with the San Antonio Water System and the City of Austin, applied continuous monitoring of fluorescence of dissolved organic matter (fDOM) to characterize the sources and transport of dissolved organic matter and associated constituents in the Edwards aquifer. Continuous fDOM time-series data were adjusted using empirically derived temperature, turbidity, and inner-filter-effect correction factors prior to analysis and interpretation. Fully corrected fDOM time-series data from the study sites were evaluated for short- and long-term temporal variability in fDOM in the context of the hydrologic and climatic conditions that occurred during the 5-year study period to understand vulnerability of the aquifer to potential contaminants in recharge. Study results indicate that fDOM is an effective proxy for dissolved organic carbon that, in turn, is indicative of the influx of recent surface water and associated contaminants, and thus, aquifer vulnerability to those contaminants. Although other continuously monitored water-quality parameters provide insights into changes in water quality in response to varying hydrologic conditions, the quantitative relation between fDOM and dissolved organic carbon directly indicates the timing and magnitude of pulses of organic constituents derived from the land surface, whereas other water-quality parameters do not.

Texas