USGS ScienceSearch

USGS · 70205838

Report on the workshop 'Global modelling of biodiversity and ecosystem services'

Abstract

A three-day workshop on ‘Global Modelling of Biodiversity and Ecosystem Services’, was held in the Hague, Netherlands, from 24th to 26th June 2019. The workshop, attended by 35 modelling and scenario-building experts, was organised on behalf of the former IPBES1 expert group on scenarios and models of the first IPBES work programme by its interim technical support unit, and hosted by the PBL Netherlands Environmental Assessment Agency. The workshop drew on the ‘nature futures’ participatory scenario-building exercise initiated by the IPBES expert group on scenarios and models, and other biodiversity modelling initiatives such as the ISIMIP project2 working on adding biodiversity to the Shared Socioeconomic Pathways (SSPs) scenarios framework, the 'bending the curve' initiative3 led by IIASA4 and WWF5, and GEOBON6 working on modelling Essential Biodiversity Variables. The workshop was a step towards coordinating across biodiversity modelling initiatives, to build on each other’s work, and to seek synergies for the production of innovative scenarios on biodiversity and ecosystem services to inform the post-2020 agenda of the Convention on Biological Diversity, as well as the Sustainable Development Goals. The aims of the workshop were to: 1. Compile material as input for a first draft of the fifth Global Biodiversity Outlook (GBO-5) based on recent scenario work, including the ‘bending the curve’ scenarios and the newly developed PBL scenarios (modified from the Rio+20 scenarios), and existing models (to be completed by August 2019) 2. Develop a protocol for modelling trends and near term projections on indicators relevant to the Nature Futures Framework7 using models that are readily available (to be completed by early 2020) 3. Set the agenda and define the aims for a larger meeting at the end of 2019 to discuss the long term strategy towards the development of appropriate indicators and models to produce Nature Futures scenarios (to continue beyond Jan 2020)

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Sana Okayasu, Machteld Schoolenberg, Eefje den Belder, Ghassen Halouani, HyeJin Kim, Brian W. Miller. 2019. Report on the workshop 'Global modelling of biodiversity and ecosystem services'. https://pubs.usgs.gov/publication/70205838

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Factors affecting benthic macroinvertebrate health in the City of Roanoke, Virginia, 2020–2023

Major waterways in the City of Roanoke (City) have failed to meet Virginia’s aquatic life designated use since 1996. Segments of the upper Roanoke River lack healthy benthic macroinvertebrate communities which prompted a total maximum daily load (TMDL) study by the Virginia Department of Environmental Quality (VDEQ) to identify the most probable stressor(s) causing the impairment. Excess fine sediment was identified as the most probable stressor impairing benthic macroinvertebrates on portions of the Roanoke River in 2006, and a watershed implementation plan published in 2016 required communities within the impaired watershed to implement projects that would reduce the load of fine sediment entering the Roanoke River. Additional benthic macroinvertebrate sampling and stream habitat assessments along the Roanoke River and Tinker Creek (a tributary to the Roanoke River that flows through the City) revealed continued impaired conditions, and subsequent stressor identification analysis was completed in 2023. Samples collected downstream of the City on the Roanoke River and Tinker Creek generally showed more impaired conditions relative to samples collected at locations upstream of the City. Based on this evaluation, sediment and sediment-bound polychlorinated biphenyls (PCBs) were identified as probable stressors while specific conductance, total nitrogen, and sediment metals were possible stressors in Tinker Creek; however, only a sediment TMDL target was identified to address impaired benthic macroinvertebrate communities. In the Roanoke River upstream of the Niagara Dam, sediment and total phosphorus were identified as probable stressors, sediment polycyclic aromatic hydrocarbons and sediment PCB were considered possible stressors; however, the TMDL target was only for total phosphorus. The City partnered with the U.S. Geological Survey (USGS) in 2016 to continuously monitor water quality and streamflow conditions on a major tributary of Tinker Creek, Lick Run, and by 2020, four similar monitoring stations were installed on the Roanoke River and Tinker Creek near the locations of benthic macroinvertebrate sampling. Monitored parameters included streamflow and/or gage height (water level), water temperature, pH, dissolved oxygen, specific conductance, and turbidity. Turbidity is a measure of the relative clarity of the water and was previously used to model suspended-sediment concentrations at the monitoring stations. The City also contracted Kirk Environmental, LLP (KE) to collect benthic macroinvertebrate samples and stream habitat assessments near the locations of the water-quality monitoring stations. Identified benthic macroinvertebrates were used to calculate the Virginia Stream Condition Index (SCI), a multi-metric index composed of eight biological attributes that represent elements of the structure and function of the benthic macroinvertebrate community that measure diversity, composition, and tolerance to pollution. Study objective: In this report, benthic macroinvertebrate samples and stream habitat assessment scores collected at four locations on the Roanoke River and Tinker Creek by KE and the VDEQ between 2020 and 2023 were compared to measured water-quality and streamflow conditions prior to sampling to evaluate patterns between benthic macroinvertebrate health, water quality, and hydrology.

Virginia