USGS ScienceSearch

USGS · 70180065

Geology and mining industry of the Tintic district, Utah: Section in Nineteenth Annual Report of the United States Geological Survey to the Secretary of the Interior 1897 - 1898: Part III - Economic Geology

Abstract

The field work upon which this report is based was begun in July, 1897, and continued without interruption until December of the same year. The area studied is approximately 15 miles square and contains 234 square miles. The topographic maps, which are two in number, were prepared under the direction of Mr. R. U. Goode, Mr. S. S. Gannett doing the triangulation and Messrs. Marshall and Griswold the topography in the fall of 1896 and summer of 1897. The mapping is done on two scales; the larger area, approximately 15 miles square, is mapped on a scale of 1: 62,500. This map is designed to form a part of the Geologic Atlas of the United States. The other map represents the portion of the larger area in which the majority of the mines are located. It is on a scale of 1: 9,600, and covers an area of 12 square miles. The work has been greatly facilitated through the assistance rendered by the mining men of the district, among whom special thanks are due to Messrs. G. H. Robinson, W. J. Craig, W. M. Nesbit, and C. H. Blanchard. The chemical work on the ores and country rocks from the district has been done in the laboratory of the Survey by Messrs. H. N. Stokes and George Steiger, and the determination of the fossils collected is to be credited to Mr. G. H. Girty, also of the Geological Survey. In the field work the authors have cooperated constantly on every phase of the varied problems. The same is true for the office work, except that the stratigraphic and economic problems have been the especial studies of Mr. Tower, while the petrologic and remaining problems have been the special studies of Mr. Smith. In pursuance of this system of work the introduction has been written conjointly, Chapter II of Part I and all of Part II have been written by Mr. Tower, and Chapters I and III to VII of Part I by Mr. Smith.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

George Warren Tower, George Otis Smith. 1899. Geology and mining industry of the Tintic district, Utah: Section in Nineteenth Annual Report of the United States Geological Survey to the Secretary of the Interior 1897 - 1898: Part III - Economic Geology. https://pubs.usgs.gov/publication/70180065

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Factors affecting benthic macroinvertebrate health in the City of Roanoke, Virginia, 2020–2023

Major waterways in the City of Roanoke (City) have failed to meet Virginia’s aquatic life designated use since 1996. Segments of the upper Roanoke River lack healthy benthic macroinvertebrate communities which prompted a total maximum daily load (TMDL) study by the Virginia Department of Environmental Quality (VDEQ) to identify the most probable stressor(s) causing the impairment. Excess fine sediment was identified as the most probable stressor impairing benthic macroinvertebrates on portions of the Roanoke River in 2006, and a watershed implementation plan published in 2016 required communities within the impaired watershed to implement projects that would reduce the load of fine sediment entering the Roanoke River. Additional benthic macroinvertebrate sampling and stream habitat assessments along the Roanoke River and Tinker Creek (a tributary to the Roanoke River that flows through the City) revealed continued impaired conditions, and subsequent stressor identification analysis was completed in 2023. Samples collected downstream of the City on the Roanoke River and Tinker Creek generally showed more impaired conditions relative to samples collected at locations upstream of the City. Based on this evaluation, sediment and sediment-bound polychlorinated biphenyls (PCBs) were identified as probable stressors while specific conductance, total nitrogen, and sediment metals were possible stressors in Tinker Creek; however, only a sediment TMDL target was identified to address impaired benthic macroinvertebrate communities. In the Roanoke River upstream of the Niagara Dam, sediment and total phosphorus were identified as probable stressors, sediment polycyclic aromatic hydrocarbons and sediment PCB were considered possible stressors; however, the TMDL target was only for total phosphorus. The City partnered with the U.S. Geological Survey (USGS) in 2016 to continuously monitor water quality and streamflow conditions on a major tributary of Tinker Creek, Lick Run, and by 2020, four similar monitoring stations were installed on the Roanoke River and Tinker Creek near the locations of benthic macroinvertebrate sampling. Monitored parameters included streamflow and/or gage height (water level), water temperature, pH, dissolved oxygen, specific conductance, and turbidity. Turbidity is a measure of the relative clarity of the water and was previously used to model suspended-sediment concentrations at the monitoring stations. The City also contracted Kirk Environmental, LLP (KE) to collect benthic macroinvertebrate samples and stream habitat assessments near the locations of the water-quality monitoring stations. Identified benthic macroinvertebrates were used to calculate the Virginia Stream Condition Index (SCI), a multi-metric index composed of eight biological attributes that represent elements of the structure and function of the benthic macroinvertebrate community that measure diversity, composition, and tolerance to pollution. Study objective: In this report, benthic macroinvertebrate samples and stream habitat assessment scores collected at four locations on the Roanoke River and Tinker Creek by KE and the VDEQ between 2020 and 2023 were compared to measured water-quality and streamflow conditions prior to sampling to evaluate patterns between benthic macroinvertebrate health, water quality, and hydrology.

Virginia