USGS ScienceSearch

USGS · 70159324

Ground water supplies of the Camden area, New Jersey

Abstract

This report is one of several setting forth the results of investigations as to the safe yield of the principal water-bearing formations in certain parts of New Jersey, carried on cooperatively by the New Jersey Department of Conservation and Development and the United States Geological Survey. Other areas in which similar studies have been made are the Atlantic City area; the Asbury Park area; the Runyon area, including the Perth Amboy well field; the area embracing the well fields of the Commonwealth-Water Co., the East Orange Water Department, and other municipalities near the Passaic River in the vicinity of Chatham; and the Garfield Water Department well field and those of several industries in the vicinity of East Paterson. The results of the study in the Camden area are of value for several reasons. The greater part of the water supply of Camden comes from wells in three fields with an estimated capacity of about 30 million gallons a day, distribute1 over a triangular area of less than one square mile. This is one of the largest developments of ground water in so small an area in the United States. During the investigation a number of new wells were drilled in this area, and the type of wells and methods of pumping were changed, and observations were possible that otherwise could seldom be obtained under such favorable circumstances. As a result of the building of the new bridge across the Delaware River between Philadelphia and Camden there has been a considerable increase in population and in consumption of water in the Camden area, and this investigation is valuable in showing the extent to which further development of ground water is possible. The observations on which the report is based were made in the period from July 1, 1923, to the date of writing the report, in the early part of 1928.1 The continuing observations have been confined essentially to the well fields of the Camden Water Department. Certain data in regard to other well fields within a radius of 10 miles of Camden, collected by F. Clark Rule under the direction of the writer in the summer of 1923, and other data obtained from the files of the Department of Conservation and Development are also included in so far as they bear on the problems under consideration. The City of Camden has cooperated heartily through C. P. Sherwood, formerly director of the Department of Streets and Public Improvements, his successor, W. D. Sayrs, Jr., James H. Long, maintenance engineer of the Water Department, and David B. Owen, chief engineer of the Morris pumping station. Much valuable information has been furnished by the Layne-New York Co., which, during the period of the investigation, replaced nearly all the old-type wells of the Camden system with those of the most modern type. The investigation was under the immediate supervision of H. T. Critchlow, then chief of the Division of Waters of the Department of Conservation and Development, and O.E. Meinzer, geologist in charge of the Division of Ground Water of the United States Geological Survey. The late Dr. M. W. Twitchell, assistant State geologist, was consulted on phases relating to the stratigraphy. A number of analyses of water have been made by C. S. Howard, of the United States Geological Survey, and advice in regard to problems arising from the mineral character of the water has been given by W. D. Collins, chemist in charge of the Division of Quality of Water of the same organization. Thanks are also due to those of the other water departments and private well owners in the area who have furnished information.

Explore related subjects

90° N90° S · 180° W ← longitude → 180° E
Source-reported bounding extent: 39.893275018082456° to 39.9811978499522° latitude; -75.13687133789061° to -75.03250122070312° longitude. This indicates report coverage, not an exact sampling location. View area on OpenStreetMap.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

David G. Thompson. 1932. Ground water supplies of the Camden area, New Jersey. https://pubs.usgs.gov/publication/70159324

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related USGS reports

Factors affecting benthic macroinvertebrate health in the City of Roanoke, Virginia, 2020–2023

Major waterways in the City of Roanoke (City) have failed to meet Virginia’s aquatic life designated use since 1996. Segments of the upper Roanoke River lack healthy benthic macroinvertebrate communities which prompted a total maximum daily load (TMDL) study by the Virginia Department of Environmental Quality (VDEQ) to identify the most probable stressor(s) causing the impairment. Excess fine sediment was identified as the most probable stressor impairing benthic macroinvertebrates on portions of the Roanoke River in 2006, and a watershed implementation plan published in 2016 required communities within the impaired watershed to implement projects that would reduce the load of fine sediment entering the Roanoke River. Additional benthic macroinvertebrate sampling and stream habitat assessments along the Roanoke River and Tinker Creek (a tributary to the Roanoke River that flows through the City) revealed continued impaired conditions, and subsequent stressor identification analysis was completed in 2023. Samples collected downstream of the City on the Roanoke River and Tinker Creek generally showed more impaired conditions relative to samples collected at locations upstream of the City. Based on this evaluation, sediment and sediment-bound polychlorinated biphenyls (PCBs) were identified as probable stressors while specific conductance, total nitrogen, and sediment metals were possible stressors in Tinker Creek; however, only a sediment TMDL target was identified to address impaired benthic macroinvertebrate communities. In the Roanoke River upstream of the Niagara Dam, sediment and total phosphorus were identified as probable stressors, sediment polycyclic aromatic hydrocarbons and sediment PCB were considered possible stressors; however, the TMDL target was only for total phosphorus. The City partnered with the U.S. Geological Survey (USGS) in 2016 to continuously monitor water quality and streamflow conditions on a major tributary of Tinker Creek, Lick Run, and by 2020, four similar monitoring stations were installed on the Roanoke River and Tinker Creek near the locations of benthic macroinvertebrate sampling. Monitored parameters included streamflow and/or gage height (water level), water temperature, pH, dissolved oxygen, specific conductance, and turbidity. Turbidity is a measure of the relative clarity of the water and was previously used to model suspended-sediment concentrations at the monitoring stations. The City also contracted Kirk Environmental, LLP (KE) to collect benthic macroinvertebrate samples and stream habitat assessments near the locations of the water-quality monitoring stations. Identified benthic macroinvertebrates were used to calculate the Virginia Stream Condition Index (SCI), a multi-metric index composed of eight biological attributes that represent elements of the structure and function of the benthic macroinvertebrate community that measure diversity, composition, and tolerance to pollution. Study objective: In this report, benthic macroinvertebrate samples and stream habitat assessment scores collected at four locations on the Roanoke River and Tinker Creek by KE and the VDEQ between 2020 and 2023 were compared to measured water-quality and streamflow conditions prior to sampling to evaluate patterns between benthic macroinvertebrate health, water quality, and hydrology.

Virginia