USGS ScienceSearch

Geology topics

Research about Sandy River

Source-linked reports with geographic coverage including Sandy River.

2 recordsLinked to original sources

Evolving fluvial response of the Sandy River, Oregon, following removal of Marmot Dam

The October 2007 removal of Marmot Dam on the Sandy River, Oregon, triggered a rapid sequence of fluvial responses as ~730,000 m3 of sand and gravel that filled the former reservoir were suddenly exposed to an energetic river. Using direct measurements of sediment transport, photogrammetry, and repeat surveys between transport events, we monitored the erosion, transport, and redeposition of this sediment in the hours, days, and months following breaching. Measurements of suspended load and bedload documented an initial spike in the flux of fine suspended sediment in the minutes after breaching followed by high rates of suspendedand bedload transport of sand. Significant gravel transport did not begin at a measurement site 0.4 km downstream of the dam until 18–20 hours after breaching, when bedload transport achieved rates of about 60 kg/s—rates that greatly exceeded concurrent measurements of less than 10 kg/s at sites upstream and farther downstream of the dam. Bedload transport rates just below the dam site remained 10–100 times above upstream and downstream rates through subsequent high flow events during the winter and spring of 2007 and 2008. Much of the elevated sediment load was derived from eroded reservoir sediment, which initially began eroding when a multi-meter-tall knickpoint migrated upstream 200 meters in the first hour. Rapid knickpoint migration triggered bank collapse in the unconsolidated fill, which swiftly widened the channel. Over the following days and months, the knickpoint migrated slowly upchannel, simultaneously lowering and becoming less distinct. By May 2008, a riffle-like feature approximately 1 m high, a few tens of meters long, and 2 km upstream from the breached dam persisted. Knickpoint and lateral erosion evacuated ~100,000 cubic meters of sediment from the reservoir in the first 60 hours, and by the end of high flows in May 2008 about 350,000 cubic meters (45 percent of the initial reservoir volume) had been evacuated. Large stormflows in November 2008 and January 2009 eroded another 39,000 cubic meters of sediment. Thus, within 15 months of breaching, about 55 percent of the impounded sediment (390,000 cubic meters) had been eroded. Two years after breaching, only another 10,000 m3 (~400,000 m3 total) had been eroded. About 30 percent of the eroded sediment has been redeposited in a tapered wedge of sediment that extends 2 km from the former dam site to the entrance of a confined bedrock gorge. Much of the balance of the eroded sediment is distributed along and partly fills pools within the Sandy River gorge, a narrow bedrock canyon extending 2–9 km downstream of the former dam site, and along the channel farther downstream.

Oregon

Eruption-related lahars and sedimentation response downstream of Mount Hood: Field guide to volcaniclastic deposits along the Sandy River, Oregon

Late Holocene dome-building eruptions at Mount Hood during the Timberline and Old Maid eruptive periods resulted in numerous dome-collapse pyroclastic flows and lahars that moved large volumes of volcaniclastic sediment into temporary storage in headwater canyons of the Sandy River. During each eruptive period, accelerated sediment loading to the river through erosion and remobilization of volcanic fragmental debris resulted in very high sediment-transport rates in the Sandy River during rain- and snowmelt-induced floods. Large sediment loads in excess of the river's transport capacity led to channel aggradation, channel widening, and change to a braided channel form in the lowermost reach of the river, between 61 and 87 km downstream from the volcano. The post-eruption sediment load moved as a broad bed-material wave, which in the case of the Old Maid eruption took ~2 decades to crest 83 km downstream. Maximum post-eruption aggradation levels of at least 28 and 23 m were achieved in response to Timberline and Old Maid eruptions. In each case, downstream aggradation cycles were initiated by lahars, but the bulk of the aggradation was achieved by fluvial sediment transport and deposition. When the high rates of sediment supply began to diminish, the river degraded, incising the channel fills and forming progressively lower sets of degradational terraces. A variety of debris-flow, hyperconcentrated-flow, and fluvial (upper and lower flow regime) deposits record the downstream passage of the sediment waves that were initiated by these eruptions. The deposits also presage a hazard that may be faced by communities along the Sandy River when volcanic activity at Mount Hood resumes.

Oregon