USGS ScienceSearch

Geology topics

Research about North Charleston, South Carolina

Source-linked reports with geographic coverage including North Charleston, South Carolina.

4 recordsLinked to original sources

Contamination movement around a permeable reactive barrier at Solid Waste Management Unit 12, Naval Weapons Station Charleston, North Charleston, South Carolina, 2009

The U.S. Geological Survey and the Naval Facilities Engineering Command Southeast investigated natural and engineered remediation of chlorinated volatile organic compound groundwater contamination at Solid Waste Management Unit 12 at the Naval Weapons Station Charleston, North Charleston, South Carolina, beginning in 2000. In early 2004, groundwater contaminants began moving around the southern end of a permeable reactive barrier (PRB) installed by a consultant in December 2002. The PRB is a 130-foot-long and 3-foot-wide barrier consisting of varying amounts of zero-valent iron with or without sand mixture. Contamination moving around the PRB probably has been transported at least 75 feet downgradient from the PRB at a rate of about 15 to 29 feet per year. The diversion of contamination around the southern end of the PRB may be due to construction difficulties associated with the PRB installation or to reduced permeability in the PRB. An event that took place during installation of the PRB, which may have caused permeability loss, was the collapse and subsequent abandonment of a 110-foot-long trench originally designed to be the PRB on November 11, 2002, approximately 25 feet upgradient (west) from the final PRB. Guar gum with antimicrobial preservative in a polymer slurry had been used to stabilize the abandoned trench prior to collapse and was only partially recovered. Residual guar gum can cause permeability reduction in a PRB. It also is possible that permeability reduction took place within the PRB by slow degradation of the guar gum slurry or mineral precipitation. Despite the likely permeability reduction in and near the PRB immediately following installation, there is evidence that contaminants moved through the PRB and were degraded, consistent with the planned purpose of the PRB. Volatile organic compound contamination in groundwater downgradient from the PRB is subject to attenuation by phytovolatilization, sorption, and biodegradation. Pulses of contamination increases have been observed in some monitoring wells downgradient from the PRB. The pulses may reflect downgradient transport of contaminant pulses; however, lateral shifting of the plume is a more likely explanation for the concentration changes at well 12MW-12S. The ability to monitor the fate and behavior of the plume in the forest is severely limited because the present axis of maximum contamination in that area bypasses all but one of the existing monitoring wells (12MW-12S). Moreover, the 2009 data indicate that there are no optimally placed sentinel wells in the probable path of contaminant transport. Thus the monitoring network is no longer adequate to monitor the groundwater contamination downgradient from the PRB.

South Carolina

Investigation of Contaminated Groundwater at Solid Waste Management Unit 12, Naval Weapons Station Charleston, North Charleston, South Carolina, 2008

The U.S. Geological Survey and the Naval Facilities Engineering Command Southeast investigated natural and engineered remediation of chlorinated volatile organic compound (VOC) groundwater contamination at Solid Waste Management Unit 12 at the Naval Weapons Station Charleston, North Charleston, South Carolina, beginning in 2000. The primary contaminants of interest in the study are tetrachloroethene, 1,1,1-trichloroethane, trichloroethene, cis-1,2-dichloroethene, vinyl chloride, 1,1-dichloroethane, and 1,1-dichloroethene. Engineered remediation aspects at the site consist of a zero-valent-iron permeable reactive barrier (PRB) installed in December 2002 intercepting the contamination plume and a phytoremediation test stand of loblolly pine trees planted in the source area in May 2003. The U.S. Geological Survey planted an additional phytoremediation test stand of loblolly pine trees on the upgradient side of the southern end of the PRB in February 2008. At least once during the summer, however, the trees were inadvertently mowed during lawn cutting activity. The PRB along the main axis of the contaminant plume appears to be actively removing contamination. In contrast to the central area of the PRB, the data from the southern end of the PRB indicate that contaminants are moving around the PRB. Concentrations in wells upgradient from the PRB showed a general decrease in VOC concentrations. VOC concentrations in some wells in the forest downgradient from the PRB showed a sharp increase in 2005, followed by a decrease in 2006. Farther downgradient in the forest, the VOC concentrations began to increase in 2007 and continued to increase into 2008. The VOC-concentration changes in groundwater beneath the forest appear to indicate movement of a groundwater-contaminant pulse through the forest. It also is possible that the data may represent lateral shifting of the plume in response to changes in groundwater-flow direction.

South Carolina

Investigation of Contaminated Ground Water at Solid Waste Management Unit 12, Naval Weapons Station Charleston, North Charleston, South Carolina, 2006-2007

The U.S. Geological Survey investigated natural and engineered remediation of chlorinated volatile organic compound (VOC) ground-water contamination at Solid Waste Management Unit 12 at the Naval Weapons Station Charleston, North Charleston, South Carolina, beginning in 2000. The primary contaminants of interest in the study are tetrachloroethene, 1,1,1-trichloroethane, trichloroethene, cis-1,2-dichloroethene, vinyl chloride, 1,1-dichloroethane, and 1,1-dichloroethene. The permeable reactive barrier (PRB) along the main axis of the contaminant plume appears to be actively removing contamination. In contrast to the central area of the PRB, the data from the southern end of the PRB indicate that contaminants are moving around the PRB. Concentrations in wells 12MW-10S and 12MW-03S, upgradient from the PRB, showed a general decrease in VOC concentrations. VOC concentrations in some wells in the forest showed a sharp increase, followed by a decrease. In 2007, the VOC concentrations began to increase in well 12MW-12S, downgradient from the PRB and thought to be unaffected by the PRB. The VOC-concentration changes in the forest, such as at well 12MW-12S, may represent lateral shifting of the plume in response to changes in ground-water-flow direction or may represent movement of a contamination pulse through the forest.

South Carolina

Floodflow characteristics of Filbin Creek for pre- and post-construction conditions, 1986, at North Charleston, South Carolina

A study to determine the effect of the construction of a shopping and business center, and of the construction and improvement of several highways on floodflow in the Filbin Creek drainage basin near North Charleston, South Carolina was performed. Discharge hydrographs were synthesized using computerized U.S. Soil Conservation Service unit hydrograph methods and routed using reservoir, step backwater, and culvert flow programs. Construction of the shopping and business center, according to plans of July 1986, will raise the water surface elevations upstream of Interstate Highway 26 by about 2.0 ft for runoff from 100-yr rainfall. Structures at Seaboard Railroad downstream of U.S. Highway 52, U.S. Highway 52, and Virginia Avenue would cause about 2.0, 2.6, and 4.1 ft of backwater, respectively. (Author 's abstract)

South Carolina