USGS ScienceSearch

Geology topics

Research about Moose River

Source-linked reports with geographic coverage including Moose River.

3 recordsLinked to original sources

Level II scour analysis for Bridge 108 (STJOUS00020108) on U.S. Highway 2, crossing the Moose River, St. Johnsbury, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure STJOUS00020108 on U.S. Highway 2 crossing the Moose River, St. Johnsbury, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland/White Mountain sections of the New England physiographic province in north-east Vermont. The 117-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the upstream right bank, forest on the upstream left bank, shrub and brush on the downstream left bank, and forest on the downstream right bank. In the study area, the Moose River has an incised, sinuous channel with a slope of approximately 0.008 ft/ft, an average channel top width of 96 ft and an average channel depth of 6 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 94.1 mm (0.309 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 14, 1995, indicated that the reach was stable. The U.S. Highway 2 crossing of the Moose River is a 103-ft-long, two-lane bridge consisting of three spans with a maximum 57-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 28, 1995). The bridge is supported by two piers, and vertical, concrete abutments with no wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) at the upstream and downstream channel banks. There is also type-3 stone fill (less than 48 inches diameter) at both the upstream and downstream ends of the left and right abutments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.4 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 9.3 to 12.2 ft. The worst-case abutment scour occurred at the left abutment 500-year discharge. Pier scour ranged from 8.3 to 15.7 for both piers. The worst case pier scour occurred at the left pier, for the 100-year discharge analysis. Additional in formation on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross- section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 32 (CONCTH00030032) on Town Highway 3, crossing the Moose River, Concord, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CONCTH00030032 on Town Highway 3 crossing the Moose River, Concord, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. Approximately 85 percent of the drainage above the site is in the White Mountain section and 15 percent is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 98.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is primarily grass with several houses and other buildings while the immediate channel banks have dense woody vegetation. In the study area, the Moose River has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 83 ft and an average channel depth of 3 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 86.2 mm (0.283 ft). There are bedrock exposures downstream of the bridge. The geomorphic assessment at the time of the Level I and Level II site visit on August 17, 1995, indicated that the reach was stable. The Town Highway 3 crossing of the Moose River is a 96-ft-long, two-lane bridge consisting of two steel-beam spans (Vermont Agency of Transportation, written communication, March 24, 1995). The bridge is supported by vertical, concrete abutments with wingwalls and a concrete pier. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. The right upstream end of the pier is undermined by 1.3 feet. The footing of the right abutment is exposed by as much as 4.0 feet vertically. The footing of the downstream right wingwall is exposed 3.5 feet and the end of the wingwall has broken and fallen into the river. Type-3 stone fill (less than 48 inches diameter) has been placed at the end of the existing wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.7 ft. Abutment scour ranged from 9.9 to 16.4 ft. Pier scour ranged from 14.4 to 16.2 ft. The worst-case contraction, abutment, and pier scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 38 (CONCTH00060038) on Town Highway 6, crossing the Moose River, Concord, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CONCTH00060038 on Town Highway 6 crossing the Moose River, Concord, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. Approximately 85 percent of the drainage above the site is in the White Mountain section and 15 percent is in the New England Upland section of the New England physiographic province in northeastern Vermont. The 98.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover of the banks is primarily forest and brush. In the study area, the Moose River has an incised, sinuous channel with a slope of approximately 0.009 ft/ft, an average channel top width of 110 ft and an average channel depth of 6 ft. The channel bed material ranged from gravel to boulder and had a median grain size (D 50 ) of 74.4 mm (0.244 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 17, 1995, indicated that the reach was stable. The Town Highway 6 crossing of the Moose River is a 59-ft-long, two-lane bridge consisting of one 55-foot steel-beam span (Vermont Agency of Transportation, written communication, March 24, 1995). The bridge is supported by a vertical, laid-up stone abutment with wingwalls on the left and a vertical, concrete abutment with wingwalls on the right. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 0 degrees. The footing of the left abutment is exposed as much as 2.8 feet. The footing of the right abutment is undermined vertically by as much as 0.3 feet. Type-2 stone-fill (less than 36 inches diameter) protection can be found along the left abutment. Type-3 stone-fill (less than 48 inches diameter) protection can be found along the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.1 to 3.1 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour at the left abutment ranged from 10.4 to 12.5 ft with the worst-case occurring at the 500-year discharge. Abutment scour at the right abutment ranged from 25.3 to 27.3 ft with the worst-case occurring at the incipient-overtopping discharge. The worst-case total scour also occurred at the incipient-overtopping discharge. The incipient-overtopping discharge was in between the 100- and 500-year discharges. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont