USGS Science⌕ Search

Geology topics

Research about Massachusetts

Source-linked reports with geographic coverage including Massachusetts.

At least 829 records · Page 46Linked to original sources

Geologic interpretation of seismic data relocation of Route 2, Shelburne Falls in Shelburne, Mass.

In June 1945 a seismic study was made for the projected Halligan Avenue out, stations 364-374, Route 2 relocation in Shelburne, Mass. Nine profiles were run at this time and a report on this work was submitted by James E. Maynard and Rev. Daniel Linehan (file report of July 1945). As a result of a consultation with the State Engineers in August 1948, the proposed center-line of the road was relocated so as to be in a more favorable position. This new location is shown as alternate center-line number 2 on the plan of the seismic transverses. A cut approximately 1600 feet long is planned between stations 364 and 380. The approximate maximum depths of the cut are: 17 feet at station 365 24 " " " 368+50 23 " " " 371+50 12 " " " 372+50 8 " " " 375+00 Between stations 375+80 and 379+50 the depth of the cut gradually decreases from 8 feet to 0 feet. In order to obtain additional information on subsurface conditions at this site, especially along the segment of the relocated center-line where cuts are to be the deepest, a supplementary program of seismic studies was undertaken. The work was done in October 1948 as a part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Massachusetts↗

Geologic interpretations of seismic data relocation Routes 15 and 20 in Sturbridge, Mass.

The proposed improvements at the junction of Routes 15 and 20, Sturbridge, Massachusetts, requires a cut of considerable magnitude for the relocation of east-bound Route 20 between stations 158 and 167. Geologic and seismic studies were made of the site for the purpose of determining the position of the bedrock surface, the kinds of material to be excavated, and the relationships of these materials to each other. The work was performed in November 1949 as a part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Massachusetts↗

Geologic interpretation of seismic data, relocation of Route 2, Stations 138-155 in Lancaster, Mass.

The proposed relocation of the Concord-Westminster Highway, Route 2, in Lancaster, Mass., requires a long, deep cut between stations 138 and 155. A preliminary seismic survey was made of the site in October 1949. At that time five transverses were made along the base-line, and three transverse to it. This work showed an anomalous situation in the vicinity of shot point E. In order to obtain the required additional data to resolve these anomalies, four more seismic transverses were made in November 1949. Two of these were run along the base-line between station 138+52 and station 145+12 in such a way as to yield, in conjugation with the preliminary survey, depth data of a 660-foot transverse. One of the primary functions of this long line was to obtain a reliable bedrock velocity. The other two transverses were transverse to the long transverse. This report comprises all of the seismic and geologic work performed at this site. The work was done as a part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Massachusetts↗

Geologic interpretation of seismic data, relocation Route 1 cut, Stations 25-36 Ballard Estate in Topsfield, Mass.

This investigation was undertaken to determine the surface and subsurface conditions between stations 25 and 36 of the proposed relocation of the Newburyport Turnpike, Route 1, Topsfield, Mass. Reconnaissance seismic work was performed at the site in September 1949. Because that work showed bedrock near the surface over an extensive area where a deep cut was to be made, a more detailed program of seismic work was performed in September, October, and November 1949. This report comprises all of the seismic work performed at the site. It was done as part of a cooperative project of the Massachusetts Department of Public Works and the United States Geological Survey.

Massachusetts↗

Geologic interpretation of seismic data relocation Route 2, Littleton Road grade separation stations 243-252 in Harvard, Mass.

During parts of June and July 1949 nine seismic traverses were made at this site. Upon preliminary office development, the velocity data for some of these traverses were though to be inadequate and it was recommended that these lines be re-surveyed. Later surveys (March 1950), however, of nearby sites indicated that the original data were reliable and that a re-survey was unnecessary. The work was done as part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey.

Massachusetts↗

Geologic interpretation of seismic data relocation Route 1, cut, Stations 34-52, Copper Mine Road area and northern portion of Ballard Estate in Topsfield, Mass.

Relocation of the Newburyport Turnpike, Route 1, in Topsfield, Mass., will require a long relatively deep cut between stations 34 and 52. In order to obtain preliminary information on the depths to bedrock and on the nature of the subsurface materials at this site, reconnaissance seismic work was performed in October 1949. Because this reconnaissance work indicated that bedrock might be relatively near the surface over an extensive area where cuttings were to be made, a more detailed seismic study of the area was made in November 1949. The results of both the reconnaissance and detailed seismic work are included in this report. The work was done as part of a cooperative program of the Massachusetts Department of Public Works and the U.S. Geological Survey.

Massachusetts↗

Geologic interpretations of seismic data, relocation of Route 116, Stations 7-135 in Cheshire, Mass.

Three segments of the proposed relocation of Route 116, stations 7 to 135, in Cheshire, Mass. require shallow cuts. For the purpose of obtaining information on the depths to bedrock, and on the nature of the overlaying materials, seismic and geologic studies were made of the segments in October 1949. The work was done as part of the cooperative program of the Massachusetts Department of Public Works and the United States Department of the Interior, Geological Survey. On seismic transverse was made between stations 7 and 15, 1 between stations 80 and 82, 3 between stations 85 and 90, and 4 between stations 125 and 135.

Massachusetts↗

Cooperative ground-water investigations in Massachusetts by the United States Geological Survey, 1938-50

The United States Geological Survey in cooperation with the Massachusetts Department of Public Works in 1938 began an investigation of the ground-water conditions in Massachusetts. This work is part of a larger cooperative program that includes surface-water investigations, geologic studies, and topographic mapping. The purpose of the ground-water studies is to obtain detailed information concerning the occurrence and availability of ground water throughout the State. The information is used by the Highway Division of the Department of Public Works in connection with design, construction, and maintenance of highways. These studies also provided a basis for the more effective utilization of the ground-water resources of the State. They indicate where additional developments can be made safely or where present use may be excessive. Reports covering the ground-water studies are listed in the appendix.

Massachusetts↗