Modified QuEChERS extraction for the analysis of young-of-year smallmouth bass using GC × GC-TOFMS

Signs of disease, such as external lesions, have been prevalent in smallmouth bass throughout the Susquehanna River Basin, USA. Previous targeted chemical studies in this system have identified known persistent organic pollutants, but a common explanatory link across multiple affected sites remains undetermined. A fast and robust extraction method that can be applied to young-of-year fish is needed to effectively screen for target and non-target compounds that may be impacting organism health. The quick, easy, cheap, effective, rugged, and safe (QuEChERS) extraction methodology was optimized to perform both targeted and non-targeted chemical analyses from a single extraction of whole young-of-year fish. Comprehensive two-dimensional gas chromatography coupled with time-of-flight mass spectrometry (GC × GC-TOFMS) was used for extract analysis. Sample extraction was performed using the solvent ethyl acetate, followed by a two-step cleanup in which samples were frozen for lipid removal and subjected to dispersive solid phase extraction using Florisil. A sample of 21 young-of-year smallmouth bass collected from areas with disease and exhibiting different types of external lesions were evaluated for 233 target compounds. A total of 34 organic contaminants, including polychlorinated biphenyls, brominated diphenyl ethers, organochlorinated pesticides, and personal care products, were detected. Data from this sample set was then analyzed for non-targets. Using the Fisher ratio method and multivariate analysis, an additional 10 significant features were identified specific to either fish with visible lesions or with no visible disease characteristics.

Pennsylvania↗

Flood-inundation maps for the Susquehanna River near Harrisburg, Pennsylvania, 2013

A series of 28 digital flood-inundation maps was developed for an approximate 25-mile reach of the Susquehanna River in the vicinity of Harrisburg, Pennsylvania. The study was selected by the U.S. Army Corps of Engineers (USACE) national Silver Jackets program, which supports interagency teams at the state level to coordinate and collaborate on flood-risk management. This study to produce flood-inundation maps was the result of a collaborative effort between the USACE, National Weather Service (NWS), Susquehanna River Basin Commission (SRBC), The Harrisburg Authority, and the U.S. Geological Survey (USGS). These maps are accessible through Web-mapping applications associated with the NWS, SRBC, and USGS. The maps can be used in conjunction with the real-time stage data from the USGS streamgage 01570500, Susquehanna River at Harrisburg, Pa., and NWS flood-stage forecasts to help guide the general public in taking individual safety precautions and will provide local municipal officials with a tool to efficiently manage emergency flood operations and flood mitigation efforts. The maps were developed using the USACE HEC–RAS and HEC–GeoRAS programs to compute water-surface profiles and to delineate estimated flood-inundation areas for selected stream stages. The maps show estimated flood-inundation areas overlaid on high-resolution, georeferenced, aerial photographs of the study area for stream stages at 1-foot intervals between 11 feet and 37 feet (which include NWS flood categories Action, Flood, Moderate, and Major) and the June 24, 1972, peak-of-record flood event at a stage of 33.27 feet at the Susquehanna River at Harrisburg, Pa., streamgage.

Pennsylvania↗

Water-quality and chemical loads of the Susquehanna River at Harrisburg, Pennsylvania, April 1980 to March 1981

Water samples were analyzed for 42 chemical constituents to determine the water quality of the Susquehanna River at Harrisburg, Pennsylvania from April 1, 1980, to March 31, 1981. The investigation was part of the U.S. Environmental Protection Agency's (EPA) Chesapeake Bay Program's Fall Line Monitoring Project to provide information on the Susquehanna River's freshwater input to the Chesapeake Bay. Streamflow and sediment discharge at Harrisburg during the study were 77 and 72 percent, respectively, of the average annual discharges. Precipitation was 16 percent lower than normal. Streamflow for February 1981 was 140 percent higher than the average monthly flow and transported 61 percent of the total annual sediment discharge. Approximately 2,300,000 tons of suspended sediment and 2,990,000 tons of dissolved solids were transported during the study. About 76 percent of the 42,000-ton nitrogen load was dissolved. Nearly 84 percent of the 2,930-ton phosphorus load and 95 percent of the 111,000-ton iron, aluminum and manganese loads were associated with suspended sediment. The herbicides atrazine and 2,4-Dichloro-phenoxyacetic acid (2,4-D) were the only pesticides measured in significant concentrations during the study period. Concentrations of 2,4-D varies throughout the year, and atrazine varied mostly during the spring and summer. Seasonal variations for other constituent concentrations and loads were directly related to streamflow. The concentrations of many constituents varies with distance along the sampling cross-section. Maximum concentrations of suspended sediment differed between the east and west channels and fluctuated from one channel to the other. Specific conductance, dissolved nutrients, and dissolved major ions were consistently higher along the east and west banks. Dissolved nitrate concentrations were significantly higher in the vertical section closest to the west bank of the river. Diel variations of water temperature, dissolved oxygen, pH, and specific conductance recorded for the period 1974 through 1978 were greatest during the months of June, July, August, and September. However, no trends in the amount of daily variation were determined for the five years of data. Regular diel variation patterns were observed for water temperature, dissolved oxygen, and pH for all streamflow conditions except peak flow and ice melt conditions. Specific conductance showed no regular diel variation, and was inversely related to streamflow. All four constituents were greatly influenced for short durations by melting ice.

Pennsylvania↗

Sediment characteristics of five streams near Harrisburg, Pa., before highway construction

Rainfall, streamfiow, sediment, and turbidity data are being collected as part of a study to evaluate the effects of highway construction on sediment discharge. The study is also designed to determine the effectiveness of different erosion-control measures in reducing sediment discharges. The study area, near Enola, Pa., consists of five adjacent drainage basins, four of which will be crossed by Interstate 81. Ninety percent of the land in each of the basins is in forest or grass. Active farmland accounts for less than 10 percent, and the remainder is in roadways and buildings. The major factor affecting sediment concentrations and discharges was the construction of a one-lane roadway and a 5-acre (2 hm 2 ) farm pond in basin 2. Approximately 100 tons (90 t) of sediment was discharged by the stream as a result of the roadway and pond construction.

Pennsylvania↗

Flood of June 1972 Susquehanna River, Paxton Creek, and Conodoguinet Creek at Harrisburg, Pennsylvania

In June 1972, tropical storm Agnes cause severe flooding in Pennsylvania and southern New York. The floods on many major strams were the highest known since the river valleys were settled. Maximum discharges were as much as twice the discharge of a 50-year flood. In central pennsylvania, large areas in Lock Have, Mill Hall, Wilkes-Barre, Kingston, Pittston, harrisburg, and in many smaller communities were inundated to depths of several feet. The extent of the flooding shown on the map was delineated by the U.S. Geological Survey from field surveys made soon after the flood. The investigation was conducted in cooperation with the Pennsylvania Department of Environmental Resources, the Susquehanna River Basin Commission, and the U.S. Army Corps of Engineers.

Pennsylvania↗

Effects of roadway and pond construction on sediment yield near Harrisburg, Pennsylvania

This report shows the effects that the construction of half a mile of one-lane roadway during June, July, and August 1970 and construction of a 5-acre pond during August and September 1970, had on sediment concentrations and sediment discharge of a stream draining an area of 0.76 square mile. The effects of the construction are shown by comparing the data collected from the affected basin with data collected from a similar adjacent basin, unaffected by construction. During the pond construction, base-flow sediment concentrations increased from the expected 6 mg/1 (milligrams per liter) to an average of 35 mg/l. Sediment discharge during June through December 1970 attributable to the construction was 55 tons, two-thirds of the amount normally expected during a year.