USGS ScienceSearch

Geology topics

Research about Glen Canyon Dam

Source-linked reports with geographic coverage including Glen Canyon Dam.

11 recordsLinked to original sources

Assessment of riparian vegetation patterns and change downstream from Glen Canyon Dam from 2014 to 2019

Changes in riparian vegetation cover and composition occur in relation to flow regime, geomorphic template, and climate, and can have cascading effects on aquatic and terrestrial ecosystems. Tracking such changes over time is therefore an important part of monitoring the condition and trajectory of riparian ecosystems. Maintaining diverse, self-sustaining riparian vegetation comprised of mostly native species is identified in the Glen Canyon Dam Long-Term Experimental and Management Plan as a key resource objective for the section of the Colorado River between Glen Canyon Dam and Lake Mead. The U.S. Geological Survey Grand Canyon Monitoring and Research Center implemented an annual monitoring program in 2014 to assess the status and trends of riparian vegetation along this section of river, particularly as they relate to flow regime. In this report, we summarize plant species composition and cover data collected under the annual monitoring program from 2014 to 2019, with special consideration given to the hydrologic position, associated geomorphic feature class, local climate patterns, native and nonnative species, and floristic region for key vegetation metrics and species. We divided the study area into four river segments (referred to as Glen Canyon, Marble Canyon, eastern Grand Canyon, and western Grand Canyon) on the basis of geography and floristic composition and calculated each recorded plant species’ relative frequency and foliar cover by river segment. These data were then used to evaluate species composition relationships among river segments, hydrologic zones, geomorphic features, and sampling years through ordination analysis. Temporal trends in our focal resource objectives—species richness, total foliar cover, proportion of native to nonnative species richness, proportion of native to nonnative species cover, Tamarix cover, Pluchea sericea cover, and Baccharis species cover—were assessed using mixed-effects models. Four patterns related to species composition emerged: (1) species composition of fixed-site sandbars differed from that of randomly selected sites (including randomly selected sandbars), (2) species composition of Glen Canyon sites differed from that of other previously identified floristic regions, (3) species composition differed across hydrologic zones related to dam operations, and (4) species composition within river segments did not change across years. For temporal patterns, four main findings emerged: (1) trends differed between fixed-sites and randomly selected sites; (2) although few directional changes were observed from 2014 to 2019, Baccharis species cover increased at randomly selected sites in areas influenced by daily water fluctuations; (3) native species cover and richness were greater than nonnative species cover and richness across all hydrologic zones; and (4) the temporal trend metrics used here can be used across floristic groups, enabling assessment of the Colorado River ecosystem as a whole. In addition to these findings, lists of recorded plant species are included as appendixes. The variations and patterns in vegetation status and trends presented in this report can be used as a baseline against which future monitoring can be compared.

Arizona

Proceedings of the Fiscal Year 2022 Annual Reporting Meeting to the Glen Canyon Dam Adaptive Management Program

(Hartwell) This report is prepared primarily to account for work conducted and products delivered in FY 2022 by GCMRC and to inform the Technical Work Group of science conducted by GCMRC and its cooperators in support of the Glen Canyon Dam Adaptive Management Program (GCDAMP). It includes a summary of accomplishments, modifications to work plans, results, and recommendations related to projects included in GCMRC’s FY 2021-23 Triennial Work Plan. This work was done to support the 11 resource goals identified in the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) Environmental Impact Statement and Record of Decision (Table 1).

Arizona

Little bugs, big data, and Colorado River adaptive management: Preliminary findings from the ongoing bug flow experiment at Glen Canyon Dam

The undammed Colorado River in Grand Canyon was characterized by spring snow-melt floods that sometimes exceeded 100,000 cubic feet per second (cfs). These were followed by occasional flash floods during summer monsoons, then by low flows from fall through early spring (Figure 1; Topping and others, 2003). This seasonally variable flow regime carried huge loads of sediment and was an important driver of natural processes that sustained the Colorado River ecosystem. For instance, high turbidity associated with this flow regime likely restricted algal growth to the river’s edge or shallow cobble habitats, similar to other desert rivers. Aquatic invertebrate assemblages were probably diverse and adapted to these variable conditions (Vinson, 2001; Haden and others, 2003). Native fishes were likely opportunistic feeders, consuming ants, seeds, and other terrestrial resources during times of flooding and switching to aquatic-derived resources like algae and aquatic invertebrates at other times (Minckley, 1991; Behn and Baxter, 2019). Regulation of the Colorado River by Glen Canyon Dam in 1963 eliminated the annual snowmelt floods, it sharply increased base flows by more than 50 percent, and dramatically increased within-day fluctuations in discharge for hydropower production (the ‘daily tides’ of the river, Figure 1 and 2; Topping and others, 2003). Glen Canyon Dam also changed other aspects of the river’s physical template, particularly temperature, sediment, and nutrient regimes. These changes to the physical template of the river led to fundamental changes in the natural processes that the sustain Colorado River ecosystem. For example, algae are common throughout the river during periods of clear water and represent the foundation of aquatic food webs (Stevens and others, 1997; Cross and others 2013). Many types of aquatic insects have disappeared or become rare, particularly sensitive groups such as mayflies, stoneflies, and caddisflies (Kennedy and others, 2016). Because aquatic insect assemblages in the Colorado River in Grand Canyon are neither diverse nor productive, food webs are simplified and inherently unstable, limiting populations of hungry fish (Cross and others 2013; Korman and others 2021).

Arizona

A coupled metabolic-hydraulic model and calibration scheme for estimating of whole-river metabolism during dynamic flow conditions

Conventional methods for estimating whole-stream metabolic rates from measured dissolved oxygen dynamics do not account for the variation in solute transport times created by dynamic flow conditions. Changes in flow at hourly time scales are common downstream of hydroelectric dams (i.e. hydropeaking), and hydrologic limitations of conventional metabolic models have resulted in a poor understanding of the controls on biological production in these highly managed river ecosystems. To overcome these limitations, we coupled a two-station metabolic model of dissolved oxygen dynamics with a hydrologic river routing model. We designed calibration and parameter estimation tools to infer values for hydrologic and metabolic parameters based on time series of water quality data, achieving the ultimate goal of estimating whole-river gross primary production and ecosystem respiration during dynamic flow conditions. Our case study data for model design and calibration were collected in the tailwater of Glen Canyon Dam (Arizona, USA), a large hydropower facility where the mean discharge was 325 m3 s 1 and the average daily coefficient of variation of flow was 0.17 (i.e. the hydropeaking index averaged from 2006 to 2016). We demonstrate the coupled model’s conceptual consistency with conventional models during steady flow conditions, and illustrate the potential bias in metabolism estimates with conventional models during unsteady flow conditions. This effort contributes an approach to solute transport modeling and parameter estimation that allows study of whole-ecosystem metabolic regimes across a more diverse range of hydrologic conditions commonly encountered in streams and rivers.

Arizona

Turbid releases from Glen Canyon Dam, Arizona, following rainfall-runoff events of September 2013

Glen Canyon Dam is a large dam on the Colorado River in Arizona. In September 2013, it released turbid water following intense thunderstorms in the surrounding area. Turbidity was >15 nephelometric turbidity units (NTU) for multiple days and >30 NTU at its peak. These unprecedented turbid releases impaired downstream fishing activity and motivated a rapid-response field excursion. At 5 locations upstream from the dam, temperature, specific conductance, dissolved oxygen, chlorophyll a , and turbidity were measured in vertical profiles. Local streamflow and rainfall records were retrieved, and turbidity and specific conductance data in dam releases were evaluated. Profiling was conducted to determine possible sources of turbidity from 3 tributaries nearest the dam, Navajo, Antelope, and Wahweap creeks, which entered Lake Powell as interflows during this study. We discuss 4 key conditions that must have been met for tributaries to influence turbidity of dam releases: tributary flows must have reached the dam, tributary flows must have been laden with sediment, inflow currents must have been near the depth of dam withdrawals, and the settling velocity of particles must have been slow. We isolate 2 key uncertainties that reservoir managers should resolve in future similar studies: the reach of tributary water into the reservoir thalweg and the distribution of particle size of suspended sediment. These uncertainties leave the source of the turbidity ambiguous, although an important role for Wahweap Creek is possible. The unique combination of limnological factors we describe implies that turbid releases at Glen Canyon Dam will continue to be rare.

Arizona

Four-band image mosaic of the Colorado River corridor downstream of Glen Canyon Dam in Arizona, derived from the May 2013 airborne image acquisition

In May 2013, the U.S. Geological Survey’s Grand Canyon Monitoring and Research Center acquired airborne multispectral high-resolution data for the Colorado River in the Grand Canyon, Arizona. The image data, which consist of four color bands (blue, green, red, and near-infrared) with a ground resolution of 20 centimeters, are available to the public as 16-bit geotiff files at http://dx.doi.org/10.5066/F7TX3CHS . The images are projected in the State Plane map projection, using the central Arizona zone (202) and the North American Datum of 1983. The assessed accuracy for these data is based on 91 ground-control points and is reported at the 95-percent confidence level as 0.64 meter (m) and a root mean square error of 0.36 m. The primary intended uses of this dataset are for maps to support field data collection and simple river navigation; high-spatial-resolution change detection of sandbars, other geomorphic landforms, riparian vegetation, and backwater and nearshore habitats; and other ecosystem-wide mapping.

Arizona

Decision analysis to support development of the Glen Canyon Dam long-term experimental and management plan

The U.S. Geological Survey, in cooperation with the Bureau of Reclamation, National Park Service, and Argonne National Laboratory, completed a decision analysis to use in the evaluation of alternatives in the Environmental Impact Statement concerning the long-term management of water releases from Glen Canyon Dam and associated management activities. Two primary decision analysis methods, multicriteria decision analysis and the expected value of information, were used to evaluate the alternative strategies against the resource goals and to evaluate the influence of uncertainty. A total of 18 performance metrics associated with 8 out of 12 resource goals (fundamental objectives) were developed by the Bureau of Reclamation and National Park Service in partnership with subject-matter teams composed of Federal, State, tribal, and private experts. A total of 19 long-term strategies associated with 7 alternatives were developed by the Bureau of Reclamation, National Park Service, Argonne National Laboratory, U.S. Geological Survey, and Cooperating Agencies. The 19 long-term strategies were evaluated against the 18 performance metrics using a series of coupled simulation models, taking into account the effects of several important sources of uncertainty. A total of 27 Federal, State, tribal, and nongovernmental agencies were invited by the Assistant Secretary of Interior to participate in a swing-weighting exercise to understand the range of perspectives about how to place relative value on the resource goals and performance metrics; 14 of the 27 chose to participate. The results of the swing-weighting exercise were combined with the evaluation of the alternatives to complete a multicriteria decision analysis. The effects of uncertainty on the ranking of long-term strategies were evaluated through calculation of the value of information. The alternatives and their long-term strategies differed across performance metrics, producing unavoidable tradeoffs; thus, there was no long-term strategy that was dominated by another across all performance metrics. When the performance of each alternative was weighted across performance metrics, three alternatives (B, D, and G) were top-ranked depending on the set of weights proposed: Alternative B was favored by those stakeholders that placed a high value on hydropower; Alternative G was favored by those stakeholders that placed a high value on the restoration of natural processes, like beachbuilding and natural vegetation; and Alternative D was favored by the remaining stakeholders. Surprisingly, these rankings were not sensitive to the critical uncertainties that were evaluated; that is, the choice of a preferred long-term strategy was sensitive to the value-based judgment about how to place relative weight on the resource goals but was not sensitive to the uncertainties in the system dynamics that were evaluated in this analysis. The one area of uncertainty that did slightly affect the ranking of alternatives was the long-term pattern of hydrological input; because of this sensitivity, some attention to the possible effects of climate change is warranted. The results of the decision analysis are meant to serve as only one of many sources of information that can be used to evaluate the alternatives proposed in the Environmental Impact Statement. These results only focus on those resource goals for which quantitative performance metrics could be formulated and evaluated; there are other important aspects of the resource goals that also need to be considered. Not all the stakeholders who were invited to participate in the decision analysis chose to do so; thus, the Bureau of Reclamation, National Park Service, and U.S. Department of Interior may want to consider other input.

Arizona

State-and-transition prototype model of riparian vegetation downstream of Glen Canyon Dam, Arizona

Facing an altered riparian plant community dominated by nonnative species, resource managers are increasingly interested in understanding how to manage and promote healthy riparian habitats in which native species dominate. For regulated rivers, managing flows is one tool resource managers consider to achieve these goals. Among many factors that can influence riparian community composition, hydrology is a primary forcing variable. Frame-based models, used successfully in grassland systems, provide an opportunity for stakeholders concerned with riparian systems to evaluate potential riparian vegetation responses to alternative flows. Frame-based, state-and-transition models of riparian vegetation for reattachment bars, separation bars, and the channel margin found on the Colorado River downstream of Glen Canyon Dam were constructed using information from the literature. Frame-based models can be simple spreadsheet models (created in Microsoft® Excel) or developed further with programming languages (for example, C-sharp). The models described here include seven community states and five dam operations that cause transitions between states. Each model divides operations into growing (April–September) and non-growing seasons (October–March) and incorporates upper and lower bar models, using stage elevation as a division. The inputs (operations) can be used by stakeholders to evaluate flows that may promote dynamic riparian vegetation states, or identify those flow options that may promote less desirable states (for example, Tamarisk [Tamarix sp.] temporarily flooded shrubland). This prototype model, although simple, can still elicit discussion about operational options and vegetation response.

Arizona;Nevada

The relation between invertebrate drift and two primary controls, discharge and benthic densities, in a large regulated river

1. Invertebrate drift is a fundamental process in streams and rivers. Studies from laboratory experiments and small streams have identified numerous extrinsic (e.g. discharge, light intensity, water quality) and intrinsic factors (invertebrate life stage, benthic density, behaviour) that govern invertebrate drift concentrations (# m−3), but the factors that govern invertebrate drift in larger rivers remain poorly understood. For example, while large increases or decreases in discharge can lead to large increases in invertebrate drift, the role of smaller, incremental changes in discharge is poorly described. In addition, while we might expect invertebrate drift concentrations to be proportional to benthic densities (# m−2), the benthic–drift relation has not been rigorously evaluated. 2. Here, we develop a framework for modelling invertebrate drift that is derived from sediment transport studies. We use this framework to guide the analysis of high-resolution data sets of benthic density and drift concentration for four important invertebrate taxa from the Colorado River downstream of Glen Canyon Dam (mean daily discharge 325 m3 s−1) that were collected over 18 months and include multiple observations within days. Ramping of regulated flows on this river segment provides an experimental treatment that is repeated daily and allowed us to describe the functional relations between invertebrate drift and two primary controls, discharge and benthic densities. 3. Twofold daily variation in discharge resulted in a >10-fold increase in drift concentrations of benthic invertebrates associated with pools and detritus (i.e. Gammarus lacustris and Potamopyrgus antipodarum). In contrast, drift concentrations of sessile blackfly larvae (Simuliium arcticum), which are associated with high-velocity cobble microhabitats, decreased by over 80% as discharge doubled. Drift concentrations of Chironomidae increased proportional to discharge. 4. Drift of all four taxa was positively related to benthic density. Drift concentrations of Gammarus, Potamopyrgus and Chironomidae were proportional to benthic density. Drift concentrations of Simulium were positively related to benthic density, but the benthic–drift relation was less than proportional (i.e. a doubling of benthic density only led to a 40% increase in drift concentrations). 5. Our study demonstrates that invertebrate drift concentrations in the Colorado River are jointly controlled by discharge and benthic densities, but these controls operate at different timescales. Twofold daily variation in discharge associated with hydropeaking was the primary control on within-day variation in invertebrate drift concentrations. In contrast, benthic density, which varied 10- to 1000-fold among sampling dates, depending on the taxa, was the primary control on invertebrate drift concentrations over longer timescales (weeks to months).

Arizona

The Glen Canyon Dam adaptive management program: Progress and immediate challenges

Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior officials who guide the Program.

Arizona

Recent sediment studies refute Glen Canyon Dam hypothesis

Recent studies of sedimentology hydrology, and geomorphology indicate that releases from Glen Canyon Dam are continuing to erode sandbars and beaches in the Colorado River in Grand Canyon National Park, despite attempts to restore these resources. The current strategy for dam operations is based on the hypothesis that sand supplied by tributaries of the Colorado River downstream from the dam will accumulate in the channel during normal dam operations and remain available for restoration floods. Recent work has shown that this hypothesis is false, and that tributary sand inputs are exported downstream rapidly typically within weeks or months under the current flow regime.

Arizona