Research about Chelsea, Vermont

Source-linked reports with geographic coverage including Chelsea, Vermont.

4 recordsLinked to original sources

Level II scour analysis for Bridge 43 (CHELTH00460043) on Town Highway 46, crossing Jail Brook, Chelsea, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHELTH00460043 on Town Highway 46 crossing Jail Brook, Chelsea, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 4.68-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is best described as suburban with homes, lawns, and a few trees. In the study area, Jail Brook has an incised, straight channel with a slope of approximately 0.02 ft/ft, an average channel top width of 32 ft and an average bank height of 6 ft. The channel bed material ranges from coarse sand to boulder with a median grain size (D 50 ) of 43.0 mm (0.141 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 18, 1994, indicated that the reach was stable. The Town Highway 46 crossing of Jail Brook is a 27-ft-long, two-lane bridge consisting of one 23-foot concrete span (Vermont Agency of Transportation, written communication, August 25, 1994). The opening length of the structure parallel to the bridge face is 22.8 ft.The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately zero degrees to the opening and the opening-skew-to-roadway is also zero degrees. Channel scour was not observed. However, the left abutment footing was exposed one foot. Scour countermeasures at the site consisted of type-2 stone fill (less than 36 inches diameter) on the banks and road embankments upstream and downstream of the bridge. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.1 to 1.2 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 5.0 to 6.5 ft at the left abutment and 4.7 to 6.2 ft at the right abutment. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 45 (CHELTH00440045) on Town Highway 44, crossing first Branch White River, Chelsea, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHELTH00440045 on town highway 44 crossing the First Branch White River, Chelsea, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Chelsea. The 32.5-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have low to moderate woody vegetation coverage except for the upstream right bank, which is grass covered. The immediate vicinity of the site is suburban and the overbank areas are occupied by houses, driveways, and lawn areas. The upstream right bank area is a dirt parking lot for a small auto repair garage. In the study area, the First Branch White River has an incised, sinuous channel with a slope of approximately 0.003 ft/ft, an average channel top width of 41 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel (D 50 is 43.1 mm or 0.141 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 17, 1994, indicated that the reach was stable. The town highway 44 crossing of the First Branch White Riveris a 31-ft-long, two-lane bridge consisting of one 27-foot clear-span concrete-encased steel beam deck superstructure (Vermont Agency of Transportation, written commun., August 25, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 5 degrees. Both abutment footings were reported as exposed and the left abutment was reported to be undermined by 0.5 ft at the time of the Level I assessment. The only scour protection measure at the site was type-1 stone fill (less than 12 inches diameter) along the left abutment which was reported as failed. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.4 to 5.1 ft. with the worst-case occurring at the 500-year discharge. Abutment scour ranged from 9.9 to 20.3 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont↗

Level II scour analysis for Bridge 46 (CHELTH00680046) on Town Highway 68, crossing the First Branch of the White River, Chelsea, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHELTH00680046 on town highway 68 crossing the First Branch of the White River, Chelsea, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of central Vermont in the town of Chelsea. The 58.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, the First Branch of the White River has a sinuous channel with a slope of approximately 0.0054 ft/ft, an average channel top width of 92 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobble (D 50 is 52.7 mm or 0.173 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 16, 1994, indicated that the reach was stable. The town highway 68 crossing of the First Branch of the White River is a 61-ft-long, onelane covered bridge with a 52-foot clear-span (Vermont Agency of Transportation, written commun., August 26, 1994). The bridge is supported by vertical, stone abutments with a concrete wingwall on the downstream right. The left abutment is laid-up stone supported by concrete at the upstream and downstream ends of the laid-up stone abutment. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed under the bridge during the Level I assessment. The scour protection measures in place at the site were type- 2 stone fill (less than 36 inches diameter) at the road approach embankments except the downstream left embankment which had no protection. The upstream right road embankment, impacted by the channel bend, has an extensive covering of stone fill for erosion protection. Type-3 stone fill (less than 48 inches diameter) was noted along the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.9 to 2.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 14.3 to 24.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The left abutment sits atop a bedrock outcrop. The results of the calculated scour depths will be limited by the bedrock. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 5 (CHELTH00030005) on Town Highway 3, crossing Jenkins Brook, Chelsea, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHELTH00030005 on town highway 3 crossing Jenkins Brook, Chelsea, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province of central Vermont in the town of Chelsea. The 6.97-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is forest. In the study area, Jenkins Brook has an incised, sinuous channel with a slope of approximately 0.04 ft/ft, an average channel top width of 48 ft and an average channel depth of 3 ft. The predominant channel bed material is cobble with a median grain size (D 50 ) of 154 mm (0.506 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 17, 1994, indicated that the reach was stable. The town highway 3 crossing of Jenkins Brook is a 23-ft-long bridge consisting of one 20- foot concrete span (Vermont Agency of Transportation, written communication, August 25, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The upstream wingwalls are protected by type-3 stone fill (less than 48 inches diameter) and the downstream wingwalls have type-2 stone fill (less than 36 inches diameter). The footings of both abutments are exposed. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 15 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows was 0.0 ft. Abutment scour ranged from 7.6 to 12.4 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗