Level II scour analysis for Bridge 86 (VERNVT01420086) on State Route 142, crossing Broad Brook, Vernon, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure VERNVT01420086 on State Route 142 crossing Broad Brook, Vernon, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in southeastern Vermont. The 23.7-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is primarily forest with the exception of the downstream left bank which is a wetland. In the study area, Broad Brook has an incised, meandering channel with a slope of approximately 0.001 ft/ft, an average channel top width of 132 ft and an average bank height of 3 ft. The channel bed material ranges from silt to cobbles with a median grain size (D 50 ) of 80.0 mm (0.262 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 14, 1996, indicated that the reach was vertically and laterally unstable. The State Route 142 crossing of Broad Brook is a 98-ft-long, two-lane bridge consisting of two steel-beam spans with a maximum span length of 47 feet (Vermont Agency of Transportation, written communication, March 30, 1995). The bridge is supported by vertical, concrete abutments with spill-through slopes and a concrete pier. The channel is skewed approximately 30 degrees to the opening while there is no opening-skew-to- roadway. A scour hole 2 ft deeper than the mean thalweg depth was observed along the left bank side of the pier during the Level I assessment. There was also a scour hole 1 ft deeper than the mean thalweg depth observed along the length of the right abutment. The only scour protection measure at the site was type-2 stone fill (less than 36 inches diameter) along the entire base length of the spill-through slopes. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. There was no computed contraction scour for any modelled flows. Scour at the left abutment ranged from 13.2 to 15.9 ft and at the right abutment ranged from 12.0 to 16.3 ft. The worst-case abutment scour occurred at the 500-year discharge. Pier scour ranged from 12.0 to 16.3 ft. The worst-case pier scour occurred at the incipient-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 25 (ROYATH00550025) on Town Highway 55, crossing Broad Brook, Royalton, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ROYATH00550025 on Town Highway 55 crossing Broad Brook, Royalton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 11.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is pasture on the upstream and downstream left overbanks and forest on the upstream and downstream right overbanks. In the study area, Broad Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 41 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 58.3 mm (0.191 ft). The geomorphic assessment at the time of the Level I site visit on April 13, 1995 indicated that the reach was laterally unstable. The stream impacts the upstream left bank where there is a cut bank. The Town Highway 55 crossing of the Broad Brook is a 35-ft-long, two-lane bridge consisting of one 31-foot steel-beam span (Vermont Agency of Transportation, written communication, March 22, 1995). The opening length of the structure parallel to the bridge face is 32 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening, while the opening-skew-toroadway is zero degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the left abutment and the downstream left wingwall during the Level I assessment. The scour countermeasure at the site was type-2 stone fill (less than 36 inches diameter) along the upstream and downstream left banks that extended to the ends of the wingwalls. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.6 to 1.5 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge which was less than the 100-year discharge. Abutment scour ranged from 3.5 to 8.9 ft. The worst-case abutment scour occurred at the incipient road-overtopping discharge for the left abutment and at the 100-year discharge for the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 26 (ROYATH00540026) on Town Highway 54, crossing Broad Brook, Royalton, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure ROYATH00540026 on Town Highway 54 crossing Broad Brook, Royalton, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 11.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover on the left bank upstream and downstream is pasture with trees and brush on the immediate banks. The right bank, upstream and downstream of the bridge, is forested. In the study area, Broad Brook has an incised, sinuous channel with a slope of approximately 0.01 ft/ft, an average channel top width of 37 ft and an average bank height of 4 ft. The channel bed material ranges from sand to boulders with a median grain size (D 50 ) of 66.3 mm (0.218 ft). The geomorphic assessment at the time of the Level I site visit on April 13, 1995 and the Level II site visit on July 11, 1996, indicated that the reach was stable. The Town Highway 54 crossing of Broad Brook is a 29-ft-long, one-lane bridge consisting of one 24-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 23.3 ft. The bridge is supported by a vertical, concrete face laid-up stone abutment with concrete wingwalls on the left and a laid-up stone abutment on the right. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is zero degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the downstream end of the right abutment during the Level I assessment. Also, at the upstream end of the left abutment, the footing is exposed 0.5 ft. The scour protection measures at the site included type-2 stone fill (less than 36 inches diameter) along the upstream left bank, at the upstream end of the upstream left wingwall, along the entire length of the downstream left wingwall, and at the upstream end of the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.4 ft. The worst-case contraction scour occurred at the incipient roadway-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 2.2 to 7.4 ft on the left and from 14.7 to 17.7 ft on the right. The worst-case abutment scour occurred at the incipient roadway-overtopping discharge for the left and at the 500-year discharge for the right. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 13 (SHARTH00040013) on Town Highway 4, crossing Broad Brook, Sharon, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure SHARTH00040013 on Town Highway 4 crossing Broad Brook, Sharon, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in central Vermont. The 16.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is brushland on the downstream left overbank and row crops on the right overbank, while the immediate banks have dense woody vegetation. Upstream of the bridge, the overbanks are forested. In the study area, Broad Brook has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 69 ft and an average bank height of 5 ft. The channel bed material ranges from sand to boulder with a median grain size (D 50 ) of 112 mm (0.369 ft). The geomorphic assessment at the time of the Level I site visit on April 11, 1995 and Level II site visit on July 23, 1996, indicated that the reach was stable. The Town Highway 4 crossing of Broad Brook is a 34-ft-long, two-lane bridge consisting of one 31-foot concrete tee beam span (Vermont Agency of Transportation, written communication, March 23, 1995). The opening length of the structure parallel to the bridge face is 30.1 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 10 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 2.0 ft deeper than the mean thalweg depth was observed along the upstream end of the right abutment. At the downstream end of the left abutment, a 1.0 foot scour hole was observed . Scour countermeasures at the site include type-2 stone fill (less than 3 feet diameter) at each road embankment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.7 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 5.6 to 9.4 ft. The worst case left abutment scour occurred at the 500-year discharge. Right abutment scour ranged from 19.0 to 19.8 ft. The worst-case right abutment scour occurred at the incipient-overtopping discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont↗

Level II scour analysis for Bridge 27 (BRIDTH00490027) on Town Highway 049, crossing Broad Brook, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00490027 on town highway 49 crossing Broad Brook, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 13.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are pasture with moderate tree cover on the immediate banks. Upstream of bridge 27, a gravel road runs parallel to the left bank. In the study area, the Broad Brook has an incised channel with a slope of approximately 0.007 ft/ft, an average channel top width of 54 ft and an average channel depth of 4 ft. The predominant channel bed materials are gravel and cobble with a D 50 (median diameter) of 77.9 mm or 0.256 ft. The geomorphic assessment at the time of the Level I and Level II site visit on November 9, 1994, indicated that the reach was stable. The town highway 49 crossing of the Broad Brook is a 32-ft-long, one-lane bridge consisting of one 31-ft steel-beam span (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The left abutment is noted as settled due to previous undermining. Type-2 (less than 3 ft diameter) stone fill protects the upstream left and right wingwalls, the downstream right wingwall, the right abutment, the upstream right road embankment, and the downstream left and right road embankments. Type-3 (less than 4 ft diameter) stone fill protects the downstream left wingwall, but it’s condition was reported as slumping. The channel is skewed approximately 10 degrees to the opening; the opening-skew-to-roadway is also 10 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont↗

Level II scour analysis for Bridge 57 (BRIDTH00650057) on Town Highway 65, crossing Broad Brook, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00650057 on Town Highway 65 crossing Broad Brook, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 26.9-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the US left bank is forested; DS left bank is shrub and brushland; US right bank is lawn and the DS right bank has very little vegetation and is largely coincident with the Ottauquechee River. In the study area, Broad Brook has an incised channel with a slope of approximately 0.0067 ft/ft, an average channel top width of 60 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel (D 50 is 46.2 mm or 0.151 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 25, 1994, indicated that the reach was stable. The Town Highway 65 crossing of Broad Brook is a 47-ft-long, one-lane bridge consisting of one 44-ft steel-beam span with a timber deck, supported by vertical concrete abutments with wingwalls on the upstream and downstream sides (Vermont Agency of Transportation, written commun., August, 1994). The US right wingwall and road approach is protected by stone fill. The US and DS right wingwalls and the right abutment are reported as having 1.0 to 1.5 ft of scour at the time of the Level one assessment on 10/25/94. Erosion from road wash affects all road approach embankments. Broad Brook flows into the Ottauquechee River approximately 30 ft downstream of the bridge. The channel approach to the bridge is straight with the bridge skewed 20 degrees to flow and the opening skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term aggradation or degradation; 2) contraction scour (due to reduction in flow area caused by a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute scour depths for contraction and local scour and a summary of the results follows. Contraction scour for all modelled flows ranged from 0.4 ft to 1.5 ft and the worst-case contraction scour occurred at the incipient overtopping discharge. Abutment scour ranged from 6.0 ft to 14.6 ft and the worst-case abutment scour occurred at the 100-year discharge. Scour depths and depths to armoring are summarized on p. 14 in the section titled “Scour Results”. Scour elevations, based on the calculated depths are presented in tables 1 and 2; a graph of the scour elevations is presented in figure 8 Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. For all scour presented in this report, “the scour depths adopted [by VTAOT] may differ from the equation values based on engineering judgement” (Richardson and others, 1993, p. 21, 27). It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results.

Vermont↗