USGS ScienceSearch

Geology topics

Wendell V. Tangborn

Publications and source records attributed to Wendell V. Tangborn.

7 recordsLinked to original sources

Glacier mass budget measurements by hydrologic means

Ice storage changes for the South Cascade Glacier drainage basin were determined for the 1957–1964 period using basin runoff and precipitation measurements. Measurements indicate that evaporation and condensation are negligible compared with the large runoff and precipitation values. Runoff, measured by a stream discharge station, averaged 4.04 m/yr; precipitation, determined by snow accumulation measurements at a central point on the glacier and by storage gages, averaged 3.82 m/yr, resulting in a basin net loss of about 0.22 m/yr. During the same period, South Cascade Glacier net budgets were determined by ablation stakes, snow density-depth profiles, and maps. The average glacier net budget for the period was −0.61sol;yr of water. This amount is equivalent to −0.26 m of water when averaged over the drainage basin (43% glacier-covered), which is in fair agreement with the net storage change measured by hydrologic methods. Agreement between the two methods for individual years is slightly less perfect.

Washington

A model to forecast short-term snowmelt runoff using synoptic observations of streamflow, temperature, and precipitation

Snowmelt runoff is forecast with a statistical model that utilizes daily values of stream discharge, gaged precipitation, and maximum and minimum observations of air temperature. Synoptic observations of these variables are made at existing low- and medium-altitude weather stations, thus eliminating the difficulties and expense of new, high-altitude installations. Four model development steps are used to demonstrate the influence on prediction accuracy of basin storage, a preforecast test season, air temperature (to estimate ablation), and a prediction based on storage. Daily ablation is determined by a technique that employs both mean temperature and a radiative index. Radiation (both long- and short-wave components) is approximated by using the range in daily temperature, which is shown to be closely related to mean cloud cover. A technique based on the relationship between prediction error and prediction season weather utilizes short-term forecasts of precipitation and temperature to improve the final prediction. Verification of the model is accomplished by a split sampling technique for the 1960–1977 period. Short- term (5–15 days) predictions of runoff throughout the main snowmelt season are demonstrated for mountain drainages in western Washington, south-central Arizona, western Montana, and central California. The coefficient of prediction ( C p ) based on actual, short-term predictions for 18 years is for Thunder Creek (Washington), 0.69; for South Fork Flathead River (Montana), 0.45; for the Black River (Arizona), 0.80; and for the Kings River (California), 0.80.

Water Resources Research

Combined Ice and Water Balances of Maclure Glacier, California, South Cascade Glacier, Washington, and Wolverine and Gulkana Glaciers, Alaska, 1967 Hydrologic Year

Combined ice and water balances were measured in the 1967 hydrologic year (October 1-September 30) on four glaciers in western North America ranging in latitude from 37 deg to 63 deg N. This hydrologic year was characterized by heavier than normal winter precipitation in California and Washington and abnormally dry winter conditions in coastal Alaska. In summer the western conterminous states were abnormally dry and central and southern Alaska experienced very wet conditions. Maclure Glacier (lat 37 deg 45' N., 3,650-m (metres) mean equilibrium line altitude) had an above normal winter balance of 3.46 m and a positive annual balance of 1.05 m (metres of water equivalent). South Cascade Glacier (lat 48 deg 22' N., 1900-m mean equilibrium line altitude) had a winter balance of 3.28 m, slightly above average. Above normal summer ablation resulted in a final annual balance of -0.58 m, slightly more negative than has been the case for the past decade. Wolverine Glacier's (lat 60 deg 24' N., 1,200-m mean equilibrium line altitude) winter balance was 1.17 m, considerably below normal; the annual balance was -2.04 m. Gulkana Glacier (lat 63 deg 15' N., 1,700-m mean equilibrium line altitude) had a winter balance of 1.05 m, approximately normal for this glacier; the final annual balance was -0.30 m.

Professional Paper

Application of a hydrometeorological model to the south-central Sierra Nevada of California

A hydrometeorological streamflow-prediction model (HM model) developed for the North Cascades of Washington has been tested in the south-central Sierra Nevada of California. Twenty-four drainages ranging in mean altitude from 770 to 3,160 metres, including several of the major ones such as those of the Kern, Kings, and Merced Rivers, were examined. Eight U.S. National Oceanic and Atmospheric Administration precipitation stations were evaluated. Of these, three proved to be of significant value for nearly all the drainages used. Results are given for predictions on February 1, March 1, and April 1 of monthly runoff of five major drainages for the April-September season. Also demonstrated is the April 1 prediction of a daily hydrograph for the April-September season for 2 diverse years. The altitude distribution of storage and runoff, both observed and predicted, is determined by using several drainages with different area-altitude profiles. Results of this calculation for two drainages show that, on the average, approximately 50 percent of the April-July runoff originates above 2,800 m. The influence of subsequent precipitation on prediction accuracy is determined by relating prediction error and actual precipitation occurring after the prediction day. Results for three basins show that about 75 percent of the error of a January-September prediction on January 1 is due to precipitation occurring during the prediction season. Comparisons of prediction accuracy are made for five major drainages: the Kern River near Kernville; the Kings River below North Fork, near Trimmer (inflow to Pine Flat Dam); the Kings River at Piedra; the Merced River at Pohono Bridge, near Yosemite; and the Merced River below Merced Falls Dam, near Snelling. The accuracy of the HM model appears to be about 24 percent higher than existing operational methods in predicting the April-July runoff on April 1.

California

Inventory of Glaciers in the North Cascades, Washington

Perennial bodies of ice in the North Cascades having areas of at least 0.1 km2 (square kilometer) are tabulated and classified. The inventory, a contribution to the International Hydrological Decade, includes 756 glaciers, covering 267 km2, about half of the glacier area in the United States south of Alaska. Listings include each glacier's location, drainage basin, area, length, orientation, altitude, and classification as to form, source, surface, nature of terminus, and activity. These glaciers contribute annually about 800 million cubic meters of water to streamflow in the State of Washington.

Professional Paper