Report of the River Master of the Delaware River for the period December 1, 2016–November 30, 2017

Executive Summary A Decree of the Supreme Court of the United States, entered June 7, 1954 ( New Jersey v. New York , 347 U.S. 995), established the position of Delaware River Master within the U.S. Geological Survey. In addition, the Decree authorizes the diversion of water from the Delaware River Basin and requires compensating releases from certain reservoirs owned by New York City be made under the supervision and direction of the River Master. The Decree stipulates that the River Master provide reports to the Court, not less frequently than annually. This report is the 64th annual report of the River Master of the Delaware River. The report covers the 2017 River Master report year, from December 1, 2016, to November 30, 2017. During the report year, precipitation in the upper Delaware River Basin was 47.85 inches or 108 percent of the long-term average. On December 1, 2016, combined useable storage in the New York City reservoirs in the upper Delaware River Basin was 110.115 billion gallons or 40.7 percent of combined storage capacity, the lowest combined storage of the 2017 report year. The reservoirs were at about 100 percent of useable capacity on May 31, 2017. Combined storage remained above 80 percent of combined capacity until September 2017. A lower basin drought watch issued by the Delaware River Basin Commission in 2016 extended from the beginning of this report year to January 18, 2017. The drought watch was ended on January 18, 2017, due to increased precipitation in December 2016. River Master operations during the year were conducted as stipulated by the Decree and the Flexible Flow Management Programs. Diversions from the Delaware River Basin by New York City and New Jersey fully complied with the Decree. Reservoir releases were made as directed by the River Master at rates designed to meet the flow objective for the Delaware River at Montague, New Jersey (N.J.), on 52 days during the report year. Interim Excess Release Quantity and conservation releases, designed to relieve thermal stress and protect the fishery and aquatic habitat in the tailwaters of the reservoirs, were made during the report year. Excess Release Quantity and Interim Excess Release Quantity Bank releases were also made during the report year. The water quality in the Delaware River estuary between the streamgages at Trenton, N.J., and Reedy Island Jetty, Delaware, was monitored at various locations. The data on water temperature, specific conductance, dissolved oxygen, and pH were collected continuously by electronic instruments at four sites.

New Jersey, New York, Pennsylvania

Report of the River Master of the Delaware River for the period December 1, 2015 - November 30, 2016

Executive Summary A Decree of the Supreme Court of the United States, entered June 7, 1954 ( New Jersey v. New York , 347 U.S. 995), established the position of Delaware River Master within the U.S. Geological Survey. In addition, the Decree authorizes the diversion of water from the Delaware River Basin and requires compensating releases from reservoirs owned by New York City to be made under the supervision and direction of the River Master. The Decree stipulates that the River Master provide reports to the Court not less frequently than annually. This report is the 63rd annual report of the River Master of the Delaware River. The report covers the 2016 River Master report year, which is the period from December 1, 2015, to November 30, 2016. During the report year, precipitation in the upper Delaware River Basin was 38.6 inches or 87 percent of the long-term average. Combined storage remained high (above 80 percent of combined capacity) for much of the year and did not decline below 80 percent of combined capacity until August 2016. The lowest combined storage was 106.406 billion gallons or 39 percent of combined capacity on November 28, 2016. Delaware River Basin Commission Resolution 2016–07 necessitated a basinwide drought watch on November 23, 2016. The drought watch continued through the remainder of the 2016 report year. Delaware River Master operations during the year were conducted as stipulated by the Decree and the Flexible Flow Management Program. New York City and New Jersey fully complied with the terms of the Decree and, during drought watch conditions, with the Delaware River Basin Commission Resolution 2016–07 terms. Diversions from the Delaware River Basin by New York City and New Jersey fully complied with the Decree. The reservoir releases were made as directed by the River Master at rates designed to meet the flow objective for the Delaware River at Montague, New Jersey, on 126 days during the report year. Interim Excess Release Quantity and conservation releases, designed to relieve thermal stress and protect the fishery and aquatic habitat in the tailwaters of the reservoirs, were also made during the report year. Water quality in the Delaware River estuary between the streamgages at Trenton, New Jersey, and Reedy Island Jetty, Delaware, was monitored at several locations. Data on water temperature, specific conductance, dissolved oxygen, and pH were collected continuously by electronic instruments at four sites.

Delaware, Maryland, New Jersey, New York, Pennsylv

Report of the River Master of the Delaware River for the period December 1, 2014–November 30, 2015

Executive Summary A Decree of the Supreme Court of the United States, entered June 7, 1954 ( New Jersey v. New York , 347 U.S. 995), established the position of Delaware River Master within the U.S. Geological Survey. In addition, the Decree authorizes the diversion of water from the Delaware River Basin and requires compensating releases from specific reservoirs owned by New York City be made under the supervision and direction of the River Master. The Decree stipulates that the River Master provide reports to the Court, not less frequently than annually. This report is the 62nd annual report of the River Master of the Delaware River. This report covers the 2015 River Master report year, which is the period from December 1, 2014, to November 30, 2015. During the report year, precipitation in the upper Delaware River Basin was 42.22 inches or 95 percent of the long-term average. The combined storage remained above 80 percent of the combined capacity until August 2015. The lowest combined storage of the report year was 57 percent of the total combined capacity on December 1, 2014. Delaware River Master operations during the year were conducted as stipulated by the Decree and the Flexible Flow Management Program. Diversions from the Delaware River Basin by New York City and New Jersey fully complied with the Decree. The reservoir releases were made as directed by the River Master at rates designed to meet the flow objective for the Delaware River at Montague, New Jersey, on 72 days during the report year. Interim Excess Release Quantity and conservation releases, designed to relieve thermal stress and protect the fishery and aquatic habitat in the tailwaters of the reservoirs, were also made during the report year. Water quality in the Delaware River estuary between the streamgages at Trenton, New Jersey, and Reedy Island Jetty, Delaware, was monitored at several locations. Data on water temperature, specific conductance, dissolved oxygen, and pH were collected continuously by electronic instruments at four sites.

Delaware, New Jersey New York, Pennsylvania

Report of the River Master of the Delaware River for the period December 1, 2013–November 30, 2014

Executive Summary A Decree of the Supreme Court of the United States, entered June 7, 1954 ( New Jersey v. New York , 347 U.S. 995), established the position of Delaware River Master within the U.S. Geological Survey. In addition, the Decree authorizes the diversion of water from the Delaware River Basin and requires compensating releases from specific reservoirs owned by New York City to be made under the supervision and direction of the River Master. The Decree stipulates that the River Master provide reports to the Court, not less frequently than annually. This report is the 61st annual report of the River Master of the Delaware River. The report covers the 2014 River Master report year, which is the period from December 1, 2013, to November 30, 2014. During the report year, precipitation in the upper Delaware River Basin was 42.40 inches or 95 percent of the long-term average. On December 1, 2013, combined useable storage in New York’s Pepacton, Cannonsville, and Neversink Reservoirs in the upper Delaware River Basin was 200.133 billion gallons or 73.9 percent of the combined capacity of 270.8 billion gallons. The reservoirs were at about 99.7 percent of usable capacity on May 31, 2014. Combined storage in the Pepacton, Cannonsville, and Neversink Reservoirs decreased below 80 percent of combined capacity in late August. The lowest combined storage was 151.730 billion gallons or 56 percent of combined capacity on November 24, 2014. Delaware River Master operations during the year were conducted as stipulated by the Decree and the Flexible Flow Management Program. Diversions from the Delaware River Basin by New York City and the State of New Jersey fully complied with the Decree. Reservoir releases were made as directed by the River Master at rates designed to meet the flow objective for the Delaware River at Montague, New Jersey, on 94 days during the report year. Interim Excess Release Quantity and conservation releases, designed to relieve thermal stress and protect the fishery and aquatic habitat in the tailwaters of the reservoirs, were also made during the report year. Water quality in the Delaware River estuary between streamgages at Trenton, New Jersey, and Reedy Island Jetty, Delaware, was monitored at several locations. Data on water temperature, specific conductance, dissolved oxygen, and pH were collected continuously by electronic instruments at four locations.

New Jersey, New York, Pennsylvania

Report of the River Master of the Delaware River for the period December 1, 2012–November 30, 2013

A Decree of the Supreme Court of the United States, entered June 7, 1954, established the position of Delaware River Master within the U.S. Geological Survey. In addition, the Decree authorizes diversion of water from the Delaware River Basin and requires compensating releases from certain reservoirs, owned by New York City, to be made under the supervision and direction of the River Master. The Decree stipulates that the River Master will furnish reports to the Court, not less frequently than annually. This report is the 60th annual report of the River Master of the Delaware River. It covers the 2013 River Master report year, the period from December 1, 2012 to November 30, 2013. During the report year, precipitation in the upper Delaware River Basin was 44.50 inches or 100 percent of the long-term average. Combined storage in the Pepacton, Cannonsville, and Neversink Reservoirs remained high until October 2013 when it decreased below 80 percent combined capacity. The lowest combined storage of the report year was 70.2 percent of combined capacity on November 26, 2013. Delaware River Master operations during the year were conducted as stipulated by the Decree and the Flexible Flow Management Program. Diversions from the Delaware River Basin by New York City and New Jersey were in full compliance with the Decree. Reservoir releases were made as directed by the River Master at rates designed to meet the Montague flow objective for the Delaware River at the Montague, New Jersey streamgage on 71 days during the report year. Interim Excess Release Quantity and conservation releases, designed to relieve thermal stress and protect the fishery and aquatic habitat in the tailwaters of the reservoirs, were also made during the report year. An agreement was signed on July 16, 2013 to temporarily increase releases to provide thermal protection below Cannonsville Reservoir. The quality of water in the Delaware River estuary between streamgages at Trenton, New Jersey, and Reedy Island Jetty, Delaware, was monitored at several locations. Data on water temperature, specific conductance, dissolved oxygen, and pH were collected continuously by electronic instruments at four sites.

Delaware, New Jesey, New York, Pennsylvania

Report of the River Master of the Delaware River for the period December 1, 2011–November 30, 2012

A Decree of the Supreme Court of the United States, entered June 7, 1954, established the position of Delaware River Master within the U.S. Geological Survey. In addition, the Decree authorizes diversion of water from the Delaware River Basin and requires compensating releases from certain reservoirs, owned by New York City, to be made under the supervision and direction of the River Master. The Decree stipulates that the River Master will furnish reports to the Court, not less frequently than annually. This report is the 59th annual report of the River Master of the Delaware River. It covers the 2012 River Master report year, the period from December 1, 2011 to November 30, 2012. During the report year, precipitation in the upper Delaware River Basin was 43.35 inches or 97 percent of the long-term average. Combined storage in the Pepacton, Cannonsville, and Neversink Reservoirs remained high through late May, declined from then until mid-September, decreasing below 80 percent of combined capacity in late August, increased in late October, and decreased slightly in November 2012. Delaware River Master operations during the year were conducted as stipulated by the Decree and the Flexible Flow Management Program. Diversions from the Delaware River Basin by New York City and New Jersey were in full compliance with the Decree. Reservoir releases were made as directed by the River Master at rates designed to meet the flow objective for the Delaware River at Montague, New Jersey, on 52 days during the report year. Interim Excess Release Quantity and conservation releases, designed to relieve thermal stress and protect the fishery and aquatic habitat in the tailwaters of the reservoirs, were also made during the report year. An agreement was signed on October 25, 2012, to increase discharge mitigation releases from the Neversink Reservoir due to potential impacts from Hurricane Sandy. The quality of water in the Delaware River estuary between Trenton, New Jersey, and Reedy Island Jetty, Delaware, was monitored at various locations. Data on water temperature, specific conductance, dissolved oxygen, and pH were collected continuously by electronic instruments at four sites.

New Jersey, New York, Pennsylvania

Report of the River Master of the Delaware River for the period December 1, 2010–November 30, 2011

A Decree of the Supreme Court of the United States, entered June 7, 1954, established the position of Delaware River Master within the U.S. Geological Survey. In addition, the Decree authorizes diversion of water from the Delaware River Basin and requires compensating releases from certain reservoirs, owned by New York City, to be made under the supervision and direction of the River Master. The Decree stipulates that the River Master will furnish reports to the Court, not less frequently than annually. This report is the 58th Annual Report of the River Master of the Delaware River. It covers the 2011 River Master report year, the period from December 1, 2010, to November 30, 2011. During the report year, precipitation in the upper Delaware River Basin was 71.43 inches or 162 percent of the long-term average. On December 1, 2010, combined usable storage in the New York City reservoirs in the upper Delaware River Basin was 230.430 billion gallons or 85.1 percent of combined storage capacity. The reservoirs were at about 100 percent of usable capacity on May 31, 2011. Combined storage remained high (above 80 percent combined capacity) through November 2011. River Master operations during the year were conducted as stipulated by the Decree and the Flexible Flow Management Program. Diversions from the Delaware River Basin by New York City and New Jersey were in full compliance with the Decree. Reservoir releases were made as directed by the River Master at rates designed to meet the flow objective for the Delaware River at Montague, New Jersey, on 5 days during the report year (July 24–28, 2011). Conservation releases, designed to relieve thermal stress and protect the fishery and aquatic habitat in the tailwaters of the reservoirs, were also made during the report year. The quality of water in the Delaware Estuary between Trenton, New Jersey, and Reedy Island Jetty, Delaware, was monitored at various locations. Data on water temperature, specific conductance, dissolved oxygen, and pH were collected continuously by electronic instruments at four sites.

New York, New Jersey, Pennsylvania