Landsat 9 mission update and status

Landsat 9 is currently undergoing testing at the integrated observatory level in preparation for launch from Vandenberg Air Force Base in 2021. Landsat 9 will replace Landsat 7 in orbit, 8 days out of phase with Landsat 8. Landsat 9 is largely a copy of Landsat 8 in terms of instrumentation, with an Operational Land Imager (OLI), model #2 and a Thermal Infrared Sensor (TIRS), model #2. The TIRS-2 is more significantly changed from TIRS with increased redundancy, as well as changes to the telescope baffling to improve stray light control and a revised scene select mirror encoder mechanism. Data quality of the Landsat 9 instruments is comparable to, or better than the Landsat 8 ones, with an increase to 14 bits of data transmitted and more detailed pre-launch characterization for OLI-2, and with more detailed characterization of the TIRS-2 pre-launch, in addition to the improved stray light control. The performance of the two instruments is summarized and compared to that of the Landsat 8 instruments.

Conference Paper

Centralized mission planning and scheduling system for the Landsat Data Continuity Mission

Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.

Conference Paper