Investigation of foundation problems related to heaving of soils and weathered bedrock in the Pierre Shale southwest of Denver, Colorado
Explore the source record for details and available documents.
Geology topics
Publications and source records attributed to T. C. Nichols.
Explore the source record for details and available documents.
Shallow seismic-reflection data are presented to demonstrate their usefulness for locating and showing the continuity and lateral extent of rebound fracture zones in the Pierre Shale. Rebound fracture zones, identified in boreholes near Hayes, South Dakota, have variable depth, thickness, and character, thus making questionable the correlation of these zones between holes. Thus, the subsequent determination of dip and of continuity of the zones is somewhat tenuous, especially if the fracture characteristics change significantly between holes. Once rebound fracture zones have been identified and located by borehole geotechnical and geologic data, seismic profiles can reveal the extent and geometry of fractures in these zones, thus providing valuable preconstruction information without the cost of additional drilling.-Authors
Explore the source record for details and available documents.
Explore the source record for details and available documents.
A knowledge of past overburden thickness is useful for designing underground structures such as waste repositories. This study attempts to determine if a correlation can be made between a geologic estimate and two types of geotechnical calculations of past overburden thickness. In the Pierre-Hayes area, Late Cretaceous Pierre Shales is the only bedrock present, but clasts of the Miocene Ogallala Formation were found in the Pleistocene deposits, suggesting that rocks of the Ogallala Formation once covered this area. Based on the geologic estimate, the Ogallala surface was 1100 ft higher than the present surface. Of the two types of geotechnical data acquired for the Hayes site, the laboratory overconsolidation ratios indicate a past overburden thickness value of 2300 ft, whereas the in situ pressuremeter overconsolidation ratios indicate 1318 ft. We, therefore, believe that in situ determination is a better indicator of past overburden that the laboratory results. However, why the two test results differ to this degree is unknown at present.-from Authors
A grouping of four bentonite beds, herein named the Government Draw Bentonite Beds, is identified as a stratigraphic marker within the Virgin Creek Member of the Pierre Shale. The beds are found west of Pierre, South Dakota, over an area of at least 130 mi2 (210 km2) where no other markers within the Virgin Creek Member have been identified. In this area, the Government Draw is a potential tool needed to determine the stratigraphic and structural relationships within the upper part of the Pierre Shale, heretofore little known. A better understanding of structural elements found in the Pierre Shale is needed to unravel the Late Cretaceous and younger geologic history of the area. -Authors
[No abstract available]
Investigations were made of a landslide at the Dillon Dam site, Dillon, Colo., that included detailed laboratory and field analyses of the mineralogy, chemistry, and physical properties of landslide materials and the bedrock formations from which they were derived. These investigations provide an understanding of the relative importance of various factors contributing to the origin and reactivation of a landslide in overburden resting on the Morrison Formation. The landslide material consists dominantly of an aggregate of large to small angular fragments of quartzite and sandstone from the Dakota Formation, embedded in a matrix of very fine grained to colloidal clayey substances derived mainly from the upper, noncalcareous portion of the Morrison Formation. During construction of Dillon Dam and associated structures, excavation of the toe of an old, relatively stable landslide adjacent to the left abutment caused renewed movement that threatened engulfment of the intake structure at the portal of the diversion tunnel for the reservoir. Remedial measures included excavation of a large volume of the landslide material and construction of a gravel-fill coffer- dam on bedrock at the toe of the landslide.