USGS ScienceSearch

Geology topics

Ronald I. Mayo

Publications and source records attributed to Ronald I. Mayo.

4 recordsLinked to original sources

Hydraulic analysis, Mad River at State Highway 41, Springfield, Ohio

A hydraulic analysis of the lad River in a reach at Springfield, Ohio was made to determine the effects of relocating State Highway 41 in 1S76. The main channel was cleaned by dredging in the vicinity cf the new highway bridge and at the Detroit, Toledo and Ironton Railway bridge upstream. The new highway was placed on a high fill with relief structures for flood plain drainage consisting of a 12-foot corrugated metal pipe culvert and a bridge opening to accommodate the Detroit, Toledo and Ironton Railway and a property access road. The effect of the new highway embankment on drainage from the flood plain was requested. Also requested was the effect that might be expected on the elevation of flood waters above the new highway embankment if the access road through the new highway embankment were raised. The study indicates that the improvement in the capacity of the main channel to carry water was such that, up to a discharge equivalent to a 25-year frequency flood, the water-surface elevation in the reach upstream from the Detroit, Toledo and Ironton Railway bridge would be about 0.6 foot lower than under conditions prior to the construction on State Highway 41. Diversion through the Mad River left bank levee break above the Detroit, Toledo and Ironton Railway bridge to the flood Flain would be decreased about one-half in terms of rate of discharge in cubic feet per second. The maximum difference in elevation cf the flood water between the upstream and downstream side of the new State Highway 41 embankment would be about 0.2 foot, with an additional 0.4 foot to be expected if the access road were raised 1.5 feet.

Ohio

Floods of July 4-8, 1969, in north-central Ohio

The storm of July 4-5, 1969, in north-central Ohio was an unprecedented event; never before has such intense and widespread precipitation been recorded for a summer storm in Ohio (U.S. Dept. of Commerce, 1969). More than 14 inches of rainfall in less than 24 hours were observed at several places. In areal extent more than 4 inches of rainfall occurred on about 6,000 square miles. Record-breaking floods were observed at many places in north-central Ohio. Of the 50 sites for which the peak discharge was determined 40 are located on unregulated streams. The peak discharge at five of the 40 sites was four times as large as the discharge of the 50-year flood and the peak discharge for 17 sites was more than twice as large as that of the 50-year flood. Severe losses in terms of lives and property damage were experienced; 41 deaths and more than $66 million in property damage were attributed to the rainstorm, accompanying wind, and resulting floods. This report summarizes peak stages and (or) discharges at 55 sites including five reservoirs, in upper Muskingum River basin, in lower Sandusky River basin, and in the Huron River, Vermilion River, and Black River basins.

Ohio