Phytoremediation of a petroleum-hydrocarbon contaminated shallow aquifer in Elizabeth City, North Carolina, USA

A former bulk fuel terminal in North Carolina is a groundwater phytoremediation demonstration site where 3,250 hybrid poplars, willows, and pine trees were planted from 2006 to 2008 over approximately 579,000 L of residual gasoline, diesel, and jet fuel. Since 2011, the groundwater altitude is lower in the area with trees than outside the planted area. Soil-gas analyses showed a 95 percent mass loss for total petroleum hydrocarbons (TPH) and a 99 percent mass loss for benzene, toluene, ethylbenzene, and xylenes (BTEX). BTEX and methyl tert-butyl ether concentrations have decreased in groundwater. Interpolations of free-phase, fuel product gauging data show reduced thicknesses across the site and pooling of fuel product where poplar biomass is greatest. Isolated clusters of tree mortalities have persisted in areas with high TPH and BTEX mass. Toxicity assays showed impaired water use for willows and poplars exposed to the site's fuel product, but Populus survival was higher than the willows or pines on-site, even in a noncontaminated control area. All four Populus clones survived well at the site.

North Carolina

Field note--Successful establishment of a phytoremediation system at a petroleum-hydrocarbon contaminated shallow aquifer--Trends, trials, and tribulations

We report the establishment of a mixed hybrid poplar ( Populus spp .) and willow ( Salix spp .) phytoremediation system at a fuel-contaminated site. Several approaches were used to balance competing goals of cost-effectiveness yet successful tree establishment without artificial irrigation or trenching. Bare root and unrooted cuttings were installed using either: (1) 1.2 m deep holes excavated with an 8 cm diameter auger using a direct-push rig and backfilled with the excavated, in situ soil; (2) 1.2 m deep holes created with a 23 cm diameter auger attached to a Bobcat rig and backfilled with clean topsoil from offsite; and (3) shallow holes between 15–30 cm deep that were created with a 1.3 cm diameter rod and no backfill. Tree mortality from initial plantings indicated contaminated zones not quantified in prior site investigations and remedial actions. Aquifer heterogeneity, underground utilities, and prior remediation infrastructure hampered the ability of the site to support a traditional experimental design. Total stem length and mortality were measured for all planted trees and were incorporated into a geographic information system. Planting early in the growing season, augering a larger diameter hole, and backfilling with clean, uncontaminated topsoil was cost effective and allowed for greater tree cutting growth and survival.

International Journal of Phytoremediation