2 recordsLinked to original sources

Effects of relocating State Route 151 on the flood profiles of Conotton Creek and its tributaries between Bowerston and Scio, Ohio

The Ohio Department of Transportation proposes to relocate an 8-mile segment of State Route 151 between Bowerston and Scio, Harrison County, Ohio. About 3.1 miles of this relocated highway will be within the flood plain of Conotton Creek or its tributaries. Water-surface profiles of the 100-year flood along Conotton Creek before and after the highway relocation are virtually the same between Bowerston and the western corporation limit of Scio. Upstream from that point to the upper end of the study reach, the modified profile would be about 1 foot lower than for existing conditions. Design-flood profiles on the three studied tributaries showed that Dining Fork profiles will be unaffected, Irish Creek profiles will be 0.7 to 0.9 foot lower, and Scott Run profiles will be 0.1 to 0.5 foot lower.

Water-Resources Investigations Report

Hydraulic analysis, Paint Creek at State Route 772, Chillicothe, Ohio

The Ohio Department of Transportation, Division of Highways, proposes to replace a three-span arch, bridge across Paint Creek on South Paint Street in Chillicothe, Ohio with a new deck-type structure resting on four sets of piles and four piers. Profiles of the 10-, 25-, 50- and 100-year floods under present conditions and under conditions modified by constructions of the new bridge are presented in this report. The results indicate that the construction of the new bridge will not cause significant changes in the flood profiles or the areas inundated.

Open-File Report