USGS ScienceSearch

Geology topics

R. Saunders

Publications and source records attributed to R. Saunders.

2 recordsLinked to original sources

Atlantic Salmon (Salmo salar) climate scenario planning pilot report

Scenario planning is a structured process that embraces uncertainty and explores plausible alternative future conditions under different assumptions to help manage risk and prioritize actions ( Schwartz 1996, Peterson et al . 2003). It has been used by a variety of organizations to explore and help prepare for the future, lends itself well to exploring the uncertainty surrounding changing environmental conditions, and is widely applicable to natural resource management issues. The conservation and management of protected resources for example, can be particularly challenging when the rate and magnitude of climate-related changes, and the response of species to those changes, are uncertain (NMFS 2016). The structured process of scenario planning can help resource managers navigate through potentially paralyzing uncertainties, manage risk, and evaluate/prioritize management actions associated with adapting to, and managing for, climate change (Moore et al . 2013). Atlantic salmon ( Salmo salar ) is a species highly vulnerable to climate change in the Northeast Atlantic (Hare et al . 2016a). Based on this and the above reasons, a scenario planning initiative was piloted by NOAA Fisheries to explore what the agency can do to improve U.S.Atlantic salmon population resilience to changing climate conditions in riverine, estuarine(transition), and marine environments across its current range (U.S. headwaters to Greenland). Project objectives were: 1) to better understand the challenges of managing Atlantic salmon in a changing climate; 2) to identify and discuss potential management actions and research activities that can be undertaken to increase our understanding of the drivers of Atlantic salmon productivity and resilience; 3) to increase collaborations and coordination related to the speciesrecovery; and 4) to explore how scenario planning can be used to support decisions. Outcomes from this initiative included, but were not limited to, the identification of high priority research and management actions to further collaborations and efforts to recover this species. The identified high priority actions were those that could be undertaken in the near-term(1-5 years) using current resources and in consideration of potential future conditions. Examples of identified actions by habitat (not in order of priority) included: 1) synthesize and refine range-wide life stage specific quantitative environmental thresholds for temperature, flow, etc.; 2) assess watershed habitat productivity; 3) assess forage fish and survival connection and options for marine migration monitoring; and 4) reduce dam-associated indirect estuarine mortality rate. In addition, a number of high priority climate-related actions were included in the revised Atlantic Salmon Recovery Plan (USFWS and NMFS 2019, Appendix 16) and at least two newly NOAA Fisheries funded projects are now underway (1. conduct range-wide habitat analysis and synthesize life stage specific quantitative thresholds and 2. identify locations of cold water refugia under a changing climate). This is the first use of the scenario planning process (NPS 2013) by NOAA Fisheries. This report documents an important example of applying scenario planning to marine species/environments and may serve as a useful reference for other case studies.

Atlantic Ocean

Distribution and abundance of stream fishes in relation to barriers: implications for monitoring stream recovery after barrier removal

Dams are ubiquitous in coastal regions and have altered stream habitats and the distribution and abundance of stream fishes in those habitats by disrupting hydrology, temperature regime and habitat connectivity. Dam removal is a common restoration tool, but often the response of the fish assemblage is not monitored rigorously. Sedgeunkedunk Stream, a small tributary to the Penobscot River (Maine, USA), has been the focus of a restoration effort that includes the removal of two low-head dams. In this study, we quantified fish assemblage metrics along a longitudinal gradient in Sedgeunkedunk Stream and also in a nearby reference stream. By establishing pre-removal baseline conditions and associated variability and the conditions and variability immediately following removal, we can characterize future changes in the system associated with dam removal. Over 2 years prior to dam removal, species richness and abundance in Sedgeunkedunk Stream were highest downstream of the lowest dam, lowest immediately upstream of that dam and intermediate farther upstream; patterns were similar in the reference stream. Although seasonal and annual variation in metrics within each site was substantial, the overall upstream-to-downstream pattern along the stream gradient was remarkably consistent prior to dam removal. Immediately after dam removal, we saw significant decreases in richness and abundance downstream of the former dam site and a corresponding increase in fish abundance upstream of the former dam site. No such changes occurred in reference sites. Our results show that by quantifying baseline conditions in a small stream before restoration, the effects of stream restoration efforts on fish assemblages can be monitored successfully. These data set the stage for the long-term assessment of Sedgeunkedunk Stream and provide a simple methodology for assessment in other restoration projects.

Maine