USGS ScienceSearch

Geology topics

Motoi Wakatsuki

Publications and source records attributed to Motoi Wakatsuki.

3 recordsLinked to original sources

Planning and operations of the Hydrate 01 Stratigraphic Test Well, Prudhoe Bay Unit, Alaska North Slope

The National Energy Technology Laboratory, the Japan Oil, Gas and Metals National Corporation, and the U.S. Geological Survey are leading an effort to conduct an extended gas hydrate production test in northern Alaska. The proposed production test required the drilling of an initial stratigraphic test well (STW) to confirm the geologic conditions of the proposed test site. This well was completed in January 2019 in cooperation with the Prudhoe Bay Unit Working Interest Owners. The Prudhoe Bay Unit Hydrate-01 STW was spudded on 10-December-2018. Downhole data acquisition was completed on 25-December-2018, and the rig was released on 01-January-2019. The Hydrate-01 STW was drilled in two sections, including the surface hole that was drilled to a depth of 2248 ft measured depth (MD) (685 m MD) and cased, and the production hole section that was drilled to a depth of 3558 ft MD (1084 m MD) and also cased. A thermally chilled mineral-oil-based mud was used in the main (production) hole section of the well to maintain wellbore stability and quality of the wellbore acquired data. The primary wellbore data were acquired using logging-while-drilling tools. A sidewall pressure core system was also deployed to gather grain size and other data needed for the design of the future production test wells. In addition to confirming the geologic conditions at the test site, the Hydrate-01 STW was designed to serve as a monitoring well during future field operations. Therefore, two sets of fiber-optic cables, each including a bundled distributed acoustic sensor (DAS) and a distributed temperature sensor (DTS), were clamped to the outside of the production casing and cemented in place. In March 2019, the project team acquired three-dimensional (3D) DAS vertical seismic profiling data in the Hydrate-01 STW. Temperature surveys were also acquired with the DTS as deployed in the Hydrate-01 STW during the completion of the well and nearly continuously since March-2019.

Alaska

Design and operations of the Hydrate 01 Stratigraphic test well, Alaska North Slope

The National Energy Technology Laboratory, the Japan Oil, Gas and Metals National Corporation, and the U.S. Geological Survey are leading an effort to conduct an extended gas hydrate production test in northern Alaska. The proposed production test required the drilling of an initial stratigraphic test well (STW) to confirm the geologic conditions of the proposed test site. This well was completed in December 2018 in cooperation with the Prudhoe Bay Unit Interest Owners. With the success of the STW, the project leadership group is developing plans to drill a geologic data well and a production test well. Drilling plans for the STW were advanced in late 2018. The Prudhoe Bay Unit Hydrate-01 well was spudded on 10-December-2018. Downhole data acquisition was completed on 25-December-2018 and the rig was released on 01-January-2019. The STW was drilled in two sections. The surface hole was drilled to a depth of 2248 ft (MD, measured depth) and cased, and the “production hole section” was drilled to a depth of 3558 ft (MD) and also cased. A thermally chilled mineral-oilbased mud was used to maintain drillhole stability and quality of the borehole acquired data. The primary borehole data were acquired using a suite of Schlumberger logging-while-drilling tools. To gather grain size and other data needed to inform the design of the production test well, sidewall pressure cores were collected using Halliburton’s CoreVault tool. In addition to confirming the geologic conditions at the test site, the Hydrate-01 well was designed to serve as a monitoring well during future field operations. Therefore, two sets of fiber optic cables, each including bundled Distributed Acoustic Sensors (DAS) and Distributed Temperature Sensors (DTS), were clamped to the outside of the well casing and cemented in place. In March 2019, the project team worked with SAExploration to acquire 3D DAS Vertical Seismic Profiling (VSP) data in the Hydrate-01 well, which was the largest 3D DAS-VSP ever conducted. Additionally, since the December 2018 completion of the STW, several borehole temperature surveys have been acquired with the DTS deployed in the Hydrate-01 well.

Alaska

Viable long-term gas hydrate testing site confirmed on the Alaska north slope

In December 2018, data acquired in a Stratigraphic Test Well drilled from the 7-11-12 pad in the western part of the Prudhoe Bay Unit, Alaska North Slope confirmed the occurrence of two high-quality reservoirs fully saturated with gas hydrate. The drilling was the initial phase of a planned, three-well program designed to conduct an extended duration test of the response to gas hydrate reservoirs to controlled depressurization. The Stratigraphic Test Well (formally “PBU Hydrate-01”) was operated by the PBU Operator BP Exploration, (Alaska), Inc. (BPXA) using the Parker 272 drilling rig (Figure 1) through a Drilling Services Agreement executed with Petrotechnical Resources of Alaska (PRA) in association with a contract between NETL and PRA. The science program executed by BPXA was developed over a two-year period through extensive discussions and scientific evaluation undertaken by NETL, the Japan, Oil, Gas, and Metals, National Corporation (JOGMEC), the U.S. Geological Survey (USGS), and PRA. The effort also benefitted greatly from the support of the Alaska Department of Natural Resources (ADNR) and the PBU Working Interest Owners (WIOs).

Alaska