USGS ScienceSearch

Geology topics

Justin Toby Minear

Publications and source records attributed to Justin Toby Minear.

4 recordsLinked to original sources

Sediment transport in two tributaries to the San Joaquin River immediately below Friant Dam—Cottonwood Creek and Little Dry Creek, California

Two tributaries to the greater San Joaquin River watershed, Cottonwood and Little Dry Creeks, in California’s Central Valley, were assessed for sediment and streamflow dynamics between October 1, 2011, and September 30, 2019. The two systems deliver sediment to the San Joaquin River below Friant Dam, California. Dams create downstream discontinuities in streamflow and sediment transport and therefore influence fish habitat and sediment dynamics. Because these two creeks are directly downriver from Friant Dam, they become the most upstream source of sediment to the San Joaquin River below Friant Dam. The quality and quantity of spawning habitat for fish in the gravel-bedded reach of the San Joaquin River relies on a range of bed material particle size suitable for redd structure. The effects of coarse-sand to fine-gravel supply on salmonid habitat depends primarily on the size of the sediment and the timing of its addition from tributaries to the San Joaquin River; thus, understanding the timing, quantity, and size of sediment supplied from these two tributaries is critical to the management of ecological and biological sustainability. Streamflow from Cottonwood and Little Dry Creeks, along with streamflow from the San Joaquin River below Friant Dam, were compared to continuously measured water-surface elevations to quantify the timing and direction of streamflow. Suspended-sediment samples were collected with multiple automatic samplers and analyzed for concentration and grain-size distribution. Measured suspended-sediment concentrations and streamflows were used to develop sediment rating curves and compute continuous estimates of suspended-sediment load for each tributary. Satellite imagery was used to qualify spatial and temporal dynamics through the lower watersheds and support more quantitative sediment-load estimates. Computed annual sediment loads ranged from 1.32x10 1 to 2.68x10 4 metric tons for Little Dry Creek and 9.82 to 1.98x10 3 metric tons for Cottonwood Creek. Sediment loads computed during the study period for both watersheds show that annual loads were highest during water year 2017 (October 1, 2016, to September 30, 2017). Sediment transport primarily occurred between the months of January and March. In both tributaries, grain-size distributions of suspended sediment were predominantly coarse-sized sand and were finer than the remnant bed material. Both creeks demonstrate backwater effects from the San Joaquin River, but the more tortuous stream channel and historical mining pits within Little Dry Creek provide more capacity for sediment storage compared to the less complex stream network of Cottonwood Creek. Because loads were computed based on upstream streamgages and not at the confluence of each tributary to the San Joaquin River, annual load estimates do not represent direct flux into the San Joaquin River; instead, these results indicated that in Little Dry Creek, particularly, the lowest portion of the watershed stores sediment before it reaches the San Joaquin River.

California

Characterizing changes in streamflow and sediment supply in the Sacramento River Basin, California, using hydrological simulation program—FORTRAN (HSPF)

A daily watershed model of the Sacramento River Basin of northern California was developed to simulate streamflow and suspended sediment transport to the San Francisco Bay-Delta. To compensate for sparse data, a unique combination of model inputs was developed, including meteorological variables, potential evapotranspiration, and parameters defining hydraulic geometry. A slight decreasing trend of sediment loads and concentrations was statistically significant in the lowest 50% of flows, supporting the observed historical sediment decline. Historical changes in climate, including seasonality and decline of snowpack, contribute to changes in streamflow, and are a significant component describing the mechanisms responsible for the decline in sediment. Several wet and dry hypothetical climate change scenarios with temperature changes of 1.5 °C and 4.5 °C were applied to the base historical conditions to assess the model sensitivity of streamflow and sediment to changes in climate. Of the scenarios evaluated, sediment discharge for the Sacramento River Basin increased the most with increased storm magnitude and frequency and decreased the most with increases in air temperature, regardless of changes in precipitation. The model will be used to develop projections of potential hydrologic and sediment trends to the Bay-Delta in response to potential future climate scenarios, which will help assess the hydrological and ecological health of the Bay-Delta into the next century.

California

Large-scale dam removal on the Elwha River, Washington, USA: river channel and floodplain geomorphic change

A substantial increase in fluvial sediment supply relative to transport capacity causes complex, large-magnitude changes in river and floodplain morphology downstream. Although sedimentary and geomorphic responses to sediment pulses are a fundamental part of landscape evolution, few opportunities exist to quantify those processes over field scales. We investigated the downstream effects of sediment released during the largest dam removal in history, on the Elwha River, Washington, USA, by measuring changes in riverbed elevation and topography, bed sediment grain size, and channel planform as two dams were removed in stages over two years. As 10.5 million t (7.1 million m 3 ) of sediment was released from two former reservoirs, downstream dispersion of a sediment wave caused widespread bed aggradation of ~ 1 m (greater where pools filled), changed the river from pool–riffle to braided morphology, and decreased the slope of the lowermost river. The newly deposited sediment, which was finer than most of the pre-dam-removal bed, formed new bars (largely pebble, granule, and sand material), prompting aggradational channel avulsion that increased the channel braiding index by almost 50%. As a result of mainstem bed aggradation, floodplain channels received flow and accumulated new sediment even during low to moderate flow conditions. The river system showed a two- to tenfold greater geomorphic response to dam removal (in terms of bed elevation change magnitude) than it had to a 40-year flood event four years before dam removal. Two years after dam removal began, as the river had started to incise through deposits of the initial sediment wave, ~ 1.2 million t of new sediment (~ 10% of the amount released from the two reservoirs) was stored along 18 river km of the mainstem channel and 25 km of floodplain channels. The Elwha River thus was able to transport most of the released sediment to the river mouth. The geomorphic alterations and changing bed sediment grain size along the Elwha River have important ecological implications, affecting aquatic habitat structure, benthic fauna, salmonid fish spawning and rearing potential, and riparian vegetation. The response of the river to dam removal represents a unique opportunity to observe and quantify fundamental geomorphic processes associated with a massive sediment influx, and also provides important lessons for future river-restoration endeavors.

Washington

Assessing geomorphic change along the Trinity River downstream from Lewiston Dam, California, 1980-2011

The Trinity River Restoration Program, one of the nation’s largest adaptively managed river restoration programs, requires periodic assessment to determine the effectiveness of management actions in restoring channel dynamics and habitat features. This study documents riparian and channel changes along an intensively managed 65-kilometer reach of the Trinity River in California, downstream from Lewiston Dam. The two primary periods of interest, from 1980 to 2001 and from 2001 to 2011, are separated by a shift in restoration activities mandated by the U.S. Department of the Interior December 2000 Record of Decision. The post-2001 restoration strategy increased managed-flow releases, gravel augmentation, watershed restoration, and mechanical channel rehabilitation. We assessed the nature and extent of geomorphic change and a series of ecological performance measures (channel complexity, shoreline length, and channel–floodplain connectivity) by using a series of maps digitized from available rectified orthophotography acquired during low-flow conditions in 1980, 1997, 2001, 2006, 2009, and 2011. Lateral changes in riparian and channel features were used to quantify alluvial processes, and a review of existing streamflow, sediment, and restoration records was used to assess causal mechanisms. During the study period, natural bank erosion and mechanical rehabilitation of channel margins converted riparian features to channel features and expanded the active-channel area. The primary period of bank erosion and expansion of the active channel was from 1980 to 1997. Subsequent bar accretion from 1997 to 2001, followed by slightly greater bar scour from 2001 to 2006, took place primarily in the central and lower reaches of the study area, downstream of Indian Creek. In comparison, post‑2006 bank and bar changes were spatially limited to reaches that had sufficient local transport capacity or sediment supply supported by gravel augmentation, mechanical channel rehabilitation, and tributary contributions. The highest rates of change in the areal extents of channel and riparian features were observed during the pre‑2001 period, which was longer and relatively wetter than the post-2001 period. A series of tributary floods in 1997, 1998, and 2006 increased channel complexity and floodplain connectivity. During the post-2006 period, managed-flow releases, in the absence of tributary flooding, combined with gravel augmentation and mechanical restoration, caused localized increases in sediment supply and transport capacity that led to smaller, but measurable, increases in channel complexity and floodplain connectivity in the upper river near Lewiston Dam. Extensive pre-2001 channel widening and the muted geomorphic response of channel rehabilitation sites to post-2001 managed flows highlight the need for continued monitoring and assessment of the magnitude, duration, and timing of prescriptive flows and associated geomorphic responses.

California