USGS ScienceSearch

Geology topics

John F. Wernly

Publications and source records attributed to John F. Wernly.

3 recordsLinked to original sources

Characterization of the bathymetry, hydrodynamics, water quality, infrastructure, and channel condition of the Old Erie Canal from DeWitt to its junction with the current Erie Canal in Verona, near Rome, New York, 2018–19

The Old Erie Canal has undergone sedimentation and aquatic growth that have restricted flow and diminished the aesthetic quality of the canal during the nearly 200 years since its construction. During 2018–2019, the U.S. Geological Survey (USGS) in cooperation with the Madison County Planning Department and the New York State Canal Corporation conducted a study of the Old Erie Canal between the Town of DeWitt, New York, and its junction with the current Erie Canal of the New York State Canal System near Rome, N.Y. The study comprised bathymetric, velocity, and water-quality surveys and documentation of the canal infrastructure. The USGS established benchmarks and staff gages along the 30.8 miles of the canal study area to reference the water-surface level in the canal to the North American Vertical Datum of 1988 (NAVD 88). Bathymetric survey results indicated that during the time of the survey, the canal depths ranged from 1.26 feet (ft) to 7.33 ft between the Butternut and Durhamville aqueducts (with a mean depth of 3.52 ft). Shallow depths are located throughout the canal, but the section north of the Durhamville aqueduct was the shallowest, with depths ranging from 0.68 ft to 2.44 ft (and a mean depth of 1.36 ft). The reach-averaged water velocity was 0.28 feet per second. The system generally flows west to east from the Butternut aqueduct to the entrance to the Erie Canal. Water-quality data (dissolved oxygen, water temperature, specific conductance, pH, and turbidity) were collected concurrently with the bathymetric survey (spring 2018) to characterize changes in water quality along the length of the canal. Specific-conductance values measured upstream from the hamlet of Kirkville, Manlius, N.Y. may reflect road salts being flushed into the canal through the Butternut and Limestone feeder system (designed to divert water from nearby creeks to supply water for the Old Erie Canal) from recent stormwater runoff. Increases in pH in the downstream direction are possibly caused by increasing amounts of aquatic vegetation. During the time of the survey, turbidity was highest near inflows from the canal feeder system and tributary inputs which were elevated by stormwater runoff that transported sediment into the canal. The canal infrastructure was documented to provide a baseline assessment. The feeder system, designed to bring water into the canal, does not deliver flow when the creeks supplying water to those feeders are at base flow, but does bring water into the system when flows in the feeder creeks are elevated. A recent report provides an example of repair work completed on the Chittenango feeder to improve flow through the feeder into the canal (Welch and Madison County Planning Department, 1996). Two non-regulated tributaries, Meadow Brook and Pools Brook, consistently delivered flow to the canal. Outfalls where canal water discharges into nearby creeks were sealed in the Butternut and Limestone aqueducts. Outfalls in the Chittenango, Cowaselon, and Durhamville aqueducts were found with flashboards installed at an elevation that allows water to be discharged from the canal. These structures are designed to accept additional flashboards to raise the canal water surface with the potential to convey flow farther down the system. The general condition of the channel was open and navigable between Butternut aqueduct and Chittenago aqueduct. On the segment of the canal east of the Chittenango aqueduct, an increasing number of downed trees and tangled wads of vegetation affected flow and made navigation by boat difficult to the Durhamville aqueduct. North of the Durhamville aqueduct, numerous downed trees and an increased density of aquatic vegetation limited navigation by boat and reduced the flow rate.

New York

Bathymetric survey of the Cayuga Inlet flood-control channel and selected tributaries in Ithaca, New York, 2016

From July 14 to July 20, 2016, the U.S. Geological Survey, in cooperation with the City of Ithaca, New York, and the New York State Department of State, surveyed the bathymetry of the Cayuga Inlet flood-control channel and the mouths of selected tributaries to Cayuga Inlet and Cayuga Lake in Ithaca, N.Y. The flood-control channel, built by the U.S. Army Corps of Engineers between 1965 and 1970, was designed to convey flood flows from the Cayuga Inlet watershed through the City of Ithaca and minimize possible flood damages. Since that time, the channel has infrequently been maintained by dredging, and sediment accumulation and resultant shoaling have greatly decreased the conveyance of the channel and its navigational capability. U.S. Geological Survey personnel collected bathymetric data by using an acoustic Doppler current profiler. The survey produced a dense dataset of water depths that were converted to bottom elevations. These elevations were then used to generate a geographic information system bathymetric surface. The bathymetric data and resultant bathymetric surface show the current condition of the channel and provide the information that governmental agencies charged with maintaining the Cayuga Inlet for flood-control and navigational purposes need to make informed decisions regarding future maintenance measures.

New York

Bathymetric survey and estimation of storage capacity of lower Sixmile Creek reservoir, Ithaca, New York

During 2015, the U.S. Geological Survey, in cooperation with the City of Ithaca, New York, and the New York State Department of State, conducted a bathymetric survey of the lower Sixmile Creek reservoir in Tompkins County, New York. A former water-supply reservoir for the City of Ithaca, the reservoir is no longer a functional component of Ithaca’s water-supply system, having been replaced by a larger reservoir less than a mile upstream in 1911. Excessive sedimentation has substantially reduced the reservoir’s water-storage capacity and made the discharge gate at the base of the 30-foot dam, which creates the reservoir, inoperable. U.S. Geological Survey personnel collected bathymetric data by using an acoustic Doppler current profiler. Across more than half of the approximately 14-acre reservoir, depths were manually measured because of interference from aquatic vegetation with the acoustic Doppler current profiler. City of Ithaca personnel created a bottom-elevation surface from these depth data. A second surface was created from depths that were manually measured by City of Ithaca personnel during 1938. Surface areas and storage capacities were computed at 1-foot increments of elevation for both bathymetric surveys. The results indicate that the current storage capacity of the reservoir at its normal water-surface elevation is about 84 acre-feet and that sediment accumulated between 1938 and 2015 has decreased the reservoir’s capacity by about 68 acre-feet. This sediment load is attributed to annual inputs from the watershed above the reservoir, as well as from an episodic landslide that filled a large part of the reservoir along its northern edge in 1949.

New York