USGS ScienceSearch

Geology topics

James E. Lyons

Publications and source records attributed to James E. Lyons.

At least 37 records · Page 2Linked to original sources

Optimization of salt marsh management at the Petit Manan National Wildlife Refuge of the Maine Coastal Islands National Wildlife Refuge Complex, Maine, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Petit Manan National Wildlife Refuge of the Maine Coastal Islands National Wildlife Refuge Complex in Maine. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of two marsh management units within the refuge complex, totaling about 47 hectares, and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to $ 9,545, and may continue to increase at a lower rate with further expenditures. Potential management actions in optimal portfolios at total costs less than or equal to $ 9,545 included removing dikes to restore tidal flow in the Gouldsboro Bay management unit and installing runnels to improve surface-water drainage in the Sawyers Marsh management unit. The potential management benefits were derived from expected increases in the numbers of tidal marsh obligate breeding birds and density of spiders (as an indicator of trophic health), reduced duration of flooding, and increased capacity of marsh elevation to keep pace with sea-level rise. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Maine Coastal Islands National Wildlife Refuge Complex that can be updated for implementation as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuge complex.

Maine

Red knot stopover population size and migration ecology at Delaware Bay, USA, 2022

Red Knots (Calidris canutus rufa) stop at Delaware Bay on the mid-Atlantic coast of North America during northward migration to feed on eggs of horseshoe crabs (Limulus polyphemus). In the late 1990s and early 2000s, the number of Red Knots found at Delaware Bay declined from ~50,000 to ~13,000. Horseshoe crabs have been harvested for use as bait in eel (Anguilla rostrata) and whelk (Busycon) fisheries since at least 1990, and some avian conservation biologists hypothesized that horseshoe crab harvest levels in the 1990s prevented sufficient refueling for successful migration to the breeding grounds, nesting, and survival for the remainder of the annual cycle. Since 2013, the harvest of horseshoe crabs in the Delaware Bay region has been managed using an Adaptive Resource Management (ARM) framework. The objective of the ARM framework is to manage sustainable harvest of Delaware Bay horseshoe crabs while maintaining ecosystem integrity and supporting Red Knot recovery with adequate stopover habitat for Red Knots and other migrating shorebirds. For annual harvest recommendations, the ARM framework requires annual estimates of horseshoe crab population size and the Red Knot stopover population size. We conducted a mark-recapture-resight investigation to estimate the passage population of Red Knots at Delaware Bay in 2022. We used a Bayesian analysis of a Jolly-Seber model, which accounts for turnover in the population and the probability of detection during surveys. The 2022 Red Knot mark-resight dataset

Delaware, New Jersey

Optimization of salt marsh management at the Moosehorn National Wildlife Refuge, Maine, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Moosehorn National Wildlife Refuge in Maine. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of four marsh management units within the refuge, totaling about 13 hectares, and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to $ 1,000, and may continue to increase at a lower rate with further expenditures. Potential management actions in optimal portfolios at total costs less than or equal to $ 1,000 included improving nesting habitat for Ammodramus nelsoni (Nelson’s sparrow) or restoring hydrologic connections to the upper marsh in one marsh management unit (Hobart Stream West). The potential management benefits were derived from expected increases in the density of nekton and of spiders (as an indicator of trophic health). The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Moosehorn National Wildlife Refuge that can be updated for implementation as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuge.

Maine

Optimization of salt marsh management at the Eastern Shore of Virginia and Fisherman Island National Wildlife Refuges, Virginia, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Eastern Shore of Virginia and Fisherman Island National Wildlife Refuges in Virginia. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of six marsh management units within the refuges, totaling about 575 hectares, and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to approximately $ 143,000, but that further expenditures may yield diminishing return on investment. Potential management actions in optimal portfolios at total costs less than $ 143,000 included digging runnels by hand to improve drainage from the marsh surface, breaching a road to restore natural hydrology, trapping predators to enhance nest success of tidal marsh birds, and reducing the abundance of Odocoileus virginianus (white-tailed deer) to minimize their effects on marsh vegetation. The potential management benefits were derived from expected increases in number of tidal marsh obligate breeding birds, species richness of nekton, and density of spiders (as an indicator of trophic health); and an expected decrease in duration of surface flooding. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Eastern Shore of Virginia and Fisherman Island National Wildlife Refuges that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

Virginia

Optimization of salt marsh management at the Rachel Carson National Wildlife Refuge, Maine, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop an example of a prototype tool for optimizing tidal marsh management decisions for selected marsh management units at the Rachel Carson National Wildlife Refuge in Maine. The goal was to create a prototype that could be available for future implementation. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of seven marsh management units within the refuge and estimated the outcomes of each action in terms of regional performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Management costs were estimated using limited available information, and estimated costs of individual management actions reflected relative differences among actions rather than actual expected expenditures. Results from this prototype showed how, for the objectives, actions, and estimated outcomes used for this example, total management benefits may increase consistently up to a certain estimated cost, and may continue to increase, at a lower rate, with further expenditures. Potential management actions in optimal portfolios at moderate total estimated costs included breaching or removing dikes, roads, or embankments; planting Spartina alterniflora (smooth cordgrass); and digging runnels, or shallow creeks, on the marsh platform to improve surface-water drainage. Potential management actions in optimal portfolios at high estimated costs (for example, up to $550,000) included breaching embankments to restore tidal exchange followed by planting salt marsh vegetation. The potential management benefits were derived from predicted increases in the numbers of tidal marsh obligate birds and spiders (as an indicator of trophic health), and expected improvement in the capacity of marsh elevation to keep pace with sea-level rise and reduced duration of marsh-surface inundation. The prototype presented here does not resolve current management decisions; rather, it provides a framework for decision making at the Rachel Carson National Wildlife Refuge that can be updated for implementation as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

Maine

Structured decision making and optimal bird monitoring in the northern Gulf of Mexico

The avian conservation community struggles to design and implement large scale, long-term coordinated bird monitoring programs within the northern Gulf of Mexico due to the complexity of the conservation enterprise in the region; this complexity arises from the diverse stakeholders, multiple jurisdictions, complex ecological processes, myriad habitats, and over 500 species of birds using the region for at least some part of their annual cycle. In addition, long-term monitoring over large spatial scales is difficult because of the need for monitoring data to both (1) evaluate management and restoration outcomes, and (2) provide reliable information about the status and trends of bird populations over time. To address these challenges, the Gulf of Mexico Avian Monitoring Network developed a problem statement: “How can a cost-effective monitoring strategy for the Gulf Coast bird community and ecosystem be developed that evaluates ongoing conservation activities and chronic and acute threats; maximizes learning; and is flexible and holistic enough to detect novel ecological threats and evaluate new and emerging conservation activities?” A structured decision-making framework was then used to articulate and quantify stakeholder values related to the problem statement. One use of the stakeholder values was to develop a regional, strategic plan for bird monitoring, which is presented elsewhere. A formal and complete decision support tool for conservation investments in monitoring and research guided by the stakeholder values is presented in this report. The technical aspects of the stakeholder value model and a portfolio analysis that could be used to guide decision making when allocating resources for monitoring activities is described. Whereas the decision analysis presented here could be useful to any decision maker faced with difficult choices about resource allocation, it is designed for decision makers who request monitoring study proposals and then determine which combination of proposals to fund. The portfolio decision support tool is designed to help funding agencies and organizations identify resource allocation strategies to maximize stated objectives. To begin the decision analysis, an objectives hierarchy and quantitative performance metrics from the values of the Gulf of Mexico bird conservation community were created by a panel of regional stakeholders. Each fundamental objective and sub-objective in the hierarchy is composed of several performance metrics. To test the decision support tool, the authors evaluated a combination of monitoring study proposals written for the region and simulated proposals. Each proposal was scored against the performance metrics and used multi-attribute utility theory to combine the multiple objectives into a measure of total monitoring benefit. The total monitoring benefit and costs of each proposal were then used in a constrained optimization routine to identify optimal monitoring portfolios, that is, a combination of activities that maximizes monitoring benefits while meeting cost and other constraints of interest to stakeholders. A graphical solution based on the concept of Pareto efficiency, which is useful in situations when cost constraints and exact budgets are not known, is also provided. Finally, an evaluation of the sensitivity of the decision-making framework to the weights assigned to objectives by stakeholders is included. This decision support tool allows decision makers to identify an optimal suite of monitoring proposals with a transparent portfolio analysis that includes user-defined constraints (such as costs).

Alabama, Florida, Louisiana, Mississippi, Texas

Multicriteria decisions and portfolio analysis: Land acquisition for biological and social objectives

Resource allocation for land acquisition is a common multi-objective problem that involves complex trade-offs. The National Wildlife Refuge System (NWRS) of the U.S. Fish and Wildlife Service currently uses the Targeted Resource Acquisition Comparison Tool (TRACT) to allocate funds from the Migratory Bird Conservation Fund (MBCF; established through the Migratory Bird Hunting and Conservation Act of 1934) for land acquisition based on cost-benefit analysis, regional priority rankings of candidate land parcels available for acquisition, and the overall biological contribution to duck population objectives. However, current policy encourages decision makers to consider societal and economic benefits of lands acquired, in addition to their biological benefits to waterfowl. These decisions about portfolio elements (i.e. individual land parcels) require an analysis of the difficult trade-offs among multiple objectives. In the last decade the application of multi-criteria decision analysis (MCDA) methods has been instrumental in aiding decision makers with complex multi-objective decisions. In this study, we present an alternative approach to developing land acquisition portfolios using MCDA and Modern Portfolio Theory (MPT). We describe the development of a portfolio decision analysis tool using constrained optimization for land acquisition decisions by the NWRS. We outline the decision framework, describe development of the prototype tool in Microsoft Excel, and test the results of the tool using land parcels submitted as candidates for MBCF funding in 2019. Our results indicate that the constrained optimization outperformed the traditional TRACT method and ad hoc portfolios developed using current NWRS criteria.

Ecological Applications

Species-specific demographic and behavioral responses to food availability during migratory stopover

Understanding the effects of migratory stopover site conditions on both demographic rates and migratory behaviors is critical for interpreting changes in passage population sizes at stopover sites and predicting responses to future changes and conservation actions. We used a Bayesian formulation of the open robust design model to analyze mark-resight observations of three migratory shorebird species using Delaware Bay, USA during spring stopover from 2005 to 2018. We tested for an effect of stopover food availability and weather conditions on survival probability and the probability of returning to this site in the next year and found species differences in these relationships. After years with greater food availability, red knot Calidris canutus rufa had higher survival probability but ruddy turnstone Arenaria interpres were more likely to return to the site. Estimates of within-year probabilities of arrival and persistence at the stopover site showed relatively consistent migration schedules for ruddy turnstone, but more interannual variation for red knot and sanderling Calidris alba . Shorebird use of this site typically peaked during May 26–28, but the estimated proportion of the population present during this period varied dramatically among years for red knot (range: 0.07–0.59) but less so for ruddy turnstone and sanderling. This demonstrates that both the proportion of the flyway population using this stopover site and the proportion present during a given sampling period vary among years, and both should be considered in analyzing and interpreting monitoring data. Stopover conditions can influence both migratory behavior and demographics, underscoring the importance of flyway-wide monitoring.

Delaware, New Jersey

Optimization of salt marsh management at the Long Island National Wildlife Refuge Complex, New York, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Long Island National Wildlife Refuge Complex in New York. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of five marsh management units within the refuge complex and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge-complex scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to about $24,000 , but that further expenditures may yield diminishing return on investment. Potential management actions in optimal portfolios at total costs less than $24,000 consistently included approaches for increasing drainage from the marsh surface within the marsh management units. The potential management benefits were derived from expected improvements in surface-water drainage and capacity for marsh elevation to keep pace with sea-level rise, and presumed increases in numbers of spiders (as an indicator of trophic health) and tidal marsh obligate birds. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Long Island National Wildlife Refuge Complex that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

New York

Optimization of salt marsh management at the Edwin B. Forsythe National Wildlife Refuge, New Jersey, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Edwin B. Forsythe National Wildlife Refuge in New Jersey. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of 23 marsh management units within the refuge and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that could be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that could maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to about \$980,000, but that further expenditures may yield diminishing return on investment. Potential management actions in optimal portfolios at total costs less than \$980,000 included applying sediment to the marsh surface to increase elevation in five marsh management units, digging runnels on the marsh surface to improve drainage in five marsh management units, and breaching roads and berms to improve tidal flow in five marsh management units. The potential management benefits were derived from expected reduction in the duration of surface flooding, improved capacity for marsh elevation to keep pace with sea-level rise and increases in numbers of spiders (as an indicator of trophic health), tidal marsh obligate birds, and wintering American black ducks. The prototype presented here does not resolve management decisions; rather, it provides a framework for decision making at the Edwin B. Forsythe National Wildlife Refuge that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

New Jersey

Stopover ecology of red knots in southwestern James Bay during southbound migration

Many shorebirds rely on small numbers of staging sites during long annual migrations. Numerous shorebird species are declining and understanding the importance of these staging sites is important for successful conservation. We surveyed endangered rufa red knots ( Calidris canutus rufa ) staging in James Bay, Ontario, Canada, during southbound migration in 2017 and 2018. We used mark‐resight data and count data in an integrated Bayesian analysis to quantify migration phenology, estimate passage population size, and model the age structure of the stopover population. Many adult red knots arrived in James Bay in a single wave in early August in 2017, whereas adult red knots arrived in multiple smaller waves in July and mid‐August in 2018. These waves may correspond with breeding phenology where more red knots bred successfully and arrived in one large event in 2017 and the higher number of earlier arrivals in July 2018 may have been failed breeders. We included a binomial generalized linear model in the integrated analysis to estimate that 20% and 10% of staging red knots were juveniles in 2017 and 2018, respectively. In future applications, this method could provide a metric to assess breeding performance and develop our understanding of its role in population declines. Overall, we estimated that up to 23% of the estimated rufa red knot population staged in southwestern James Bay for an average of 10–12 days. The region is a key staging site for endangered red knots and could be included in conservation planning.

James Bay

Using decision science for monitoring threatened western snowy plovers to inform recovery

Western Snowy Plovers ( Charadrius nivosus nivosus ) are federally listed under the US Endangered Species Act as Threatened. They occur along the US Pacific coastline and are threatened by habitat loss and destruction and excessive levels of predation and human disturbance. Populations have been monitored since the 1970s for distribution, reproduction, and survival. Since the species was federally listed in 1993 and a recovery plan was approved under the US Fish and Wildlife Service in 2007, recovery actions have resulted in growing populations with increased presence at breeding and wintering sites throughout their Pacific Coast range. This success has created logistical challenges related to monitoring a recovering species and a need for identifying and instituting the best monitoring approach given recovery goals, budgets, and the likelihood of monitoring success. We devised and implemented a structured decision analysis to evaluate nine alternative monitoring strategies. The analysis included inviting plover biologists involved in monitoring to score each strategy according to a suite of performance measures. Using multi-attribute utility theory, we combined scores across the performance measures for each monitoring strategy, and applied weighted utility values to show the implications of tradeoffs and find optimal decisions. We evaluated four scenarios for weighting the monitoring objectives and how risk attitude affects optimal decisions. This resulted in identifying six strategies that best meet recovery needs and were Pareto optimal for cost-effective monitoring. Results were presented to the US Fish and Wildlife Service, responsible for monitoring as well as for consideration to ensure consistent monitoring methods across the species’ range. Our use of structured decision-making can be applied to cases of other species once imperiled but now on the road to recovery.

California, Oregon, Washington

Red knot stopover population size and migration ecology at Delaware Bay, USA, 2021

Red Knots ( Calidris canutus rufa ) stop at Delaware Bay during northward migration to feed on eggs of horseshoe crabs ( Limulus polyphemus ). The northward migration of C. c. rufa coincides with the spawning of horseshoe crabs whose eggs are the perfect food for a migrating Red Knot (Karpanty et al. 2006, Haramis et al. 2007). Horseshoe crabs are therefore an important food resource for Red Knots as well as other shorebirds at Delaware Bay. Horseshoe crabs have been harvested since at least 1990 for use as bait in American eel ( Anguilla rostrata ) and whelk ( Busycon ) fisheries (Kreamer and Michels 2009). In the late 1990s and early 2000s the number of Red Knots found at Delaware Bay declined dramatically from ~50,000 to ~13,000 (Niles et al. 2008). At the same time the number of horseshoe crabs harvested also declined and avian conservation biologists hypothesized that unregulated harvest of horseshoe crabs from Delaware Bay in the 1990s prevented sufficient refueling during stopover for successful migration to the breeding grounds, nesting, and survival for the remainder of the annual cycle (McGowan et al. 2011). The harvest of horseshoe crabs in the Delaware Bay region has been managed by the Atlantic States Marine Fisheries Commission (ASMFC) since 2012 using an Adaptive Resource Management (ARM) framework (McGowan et al. 2015b). The ARM framework was designed to constrain the harvest so that number of spawning crabs would not limit the number of Red Knots stopping at Delaware Bay during migration. This management framework to achieve multiple objectives requires an estimate each year of both the crab population and the Red Knot stopover population size to inform harvest recommendations (McGowan et al. 2015a). We have estimated the stopover population size using mark-resight data on individually-marked birds and a Jolly-Seber model for open populations since 2011.

Delaware, New Jersey

Optimization of salt marsh management at the Stewart B. McKinney National Wildlife Refuge, Connecticut, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Stewart B. McKinney National Wildlife Refuge in Connecticut. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of two marsh management units within the refuge and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that would be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that would maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to approximately $ 1,190,000, but that further expenditures may yield diminishing return on investment. Management actions in optimal portfolios at total costs less than $1,190,000 included controlling avian predators in both management units, managing stormwater on lands adjacent to one marsh management unit, and removing a tide gate and breaching a dike to improve tidal flow in the other marsh management unit. The management benefits were derived from expected increases in the numbers of spiders (as an indicator of trophic health) and tidal marsh obligate birds, and an expected decrease in the use of herbicides to control invasive vegetation. The prototype presented here provides a framework for decision making at the Stewart B. McKinney National Wildlife Refuge that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

Connecticut

Research priorities for migratory birds under climate change—A qualitative value of information assessment

The mission of the U.S. Geological Survey National Climate Adaptation Science Center is to provide actionable, management-relevant research on climate change effects on ecosystems and wildlife to U.S. Department of the Interior bureaus. Providing this kind of useful scientific information requires understanding how natural-resource managers make decisions and identifying research priorities that support those decision-making processes. Migratory bird management and conservation of migratory bird habitat are central components of the U.S. Department of the Interior’s mission. In particular, the U.S. Fish and Wildlife Service has an intensive, complex decision-making process for identifying high-priority parcels of land that will contribute to migratory bird conservation through permanent acquisition or easement. Climate change introduces several uncertainties into this decision-making process, and additional climate change research should help to support more informed decision making regarding habitat acquisition. Not all climate change related uncertainties, however, will have a meaningful effect on acquisition decisions; therefore, understanding which uncertainties have the most potential to alter decision making is crucial. This document summarizes a multiyear effort to clarify the major sources of climate change uncertainty that affect migratory bird management and to articulate related research priorities. We worked with U.S. Fish and Wildlife Service staff to assess the primary ways in which climate change is likely to affect migratory birds and their habitats; to clarify uncertainties surrounding these effects; and to assess how uncertainties may affect habitat acquisition decisions. Using a modified structured decision-making approach, we assessed a set of hypotheses about how climate change will affect migratory birds and their habitats. Then, we used a qualitative value of information assessment to rank the most important topics for future research. The ranking process was built on an assessment of three primary characteristics: the magnitude of uncertainty, the topic’s relevance to habitat acquisition decision making, and the feasibility of reducing the uncertainty. Based on the results of this process, high-priority topics for future research include the following: The effects of rising temperatures on spatial distributions of migratory birds during the breeding and nonbreeding seasons; Climate-driven changes to avian community composition through homogenization and loss of specialists; The effects of decreased precipitation on abundance in the breeding season; and The effects of rising temperatures on abundance in the nonbreeding season. In addition to describing high-priority research needs, this document provides a summary of the methodology used to identify, assess, and rank uncertainties. This method was developed for a climate change related topic where a full quantitative value of information approach may not be feasible. The results and methodology described here may be useful for U.S. Geological Survey and other science-funding agencies interested in improving the applicability of their research to natural-resource management decision making.

Circular

Optimization of tidal marsh management at the Cape May and Supawna Meadows National Wildlife Refuges, New Jersey, through use of structured decision making

Structured decision making is a systematic, transparent process for improving the quality of complex decisions by identifying measurable management objectives and feasible management actions; predicting the potential consequences of management actions relative to the stated objectives; and selecting a course of action that maximizes the total benefit achieved and balances tradeoffs among objectives. The U.S. Geological Survey, in cooperation with the U.S. Fish and Wildlife Service, applied an existing, regional framework for structured decision making to develop a prototype tool for optimizing tidal marsh management decisions at the Cape May and Supawna Meadows National Wildlife Refuges in New Jersey. Refuge biologists, refuge managers, and research scientists identified multiple potential management actions to improve the ecological integrity of 13 marsh management units within the refuges and estimated the outcomes of each action in terms of performance metrics associated with each management objective. Value functions previously developed at the regional level were used to transform metric scores to a common utility scale, and utilities were summed to produce a single score representing the total management benefit that would be accrued from each potential management action. Constrained optimization was used to identify the set of management actions, one per marsh management unit, that would maximize total management benefits at different cost constraints at the refuge scale. Results indicated that, for the objectives and actions considered here, total management benefits may increase consistently up to approximately $ 785,000, but that further expenditures may yield diminishing return on investment. Management actions in optimal portfolios at total costs less than $ 785,000 included applying sediment to the marsh surface (thin layer deposition) in seven marsh management units, controlling the invasive reed Phragmites australis in four marsh management units, remediating hydrologic alterations in two marsh management units, and planting native vegetation in one marsh management unit. The management benefits were derived from expected improvements in the capacity for marsh elevation to keep pace with sea-level rise, increases in numbers of spiders (as an indicator of trophic health) and tidal marsh obligate birds, and increased cover of native vegetation. The prototype presented here provides a framework for decision making at the Cape May and Supawna Meadows National Wildlife Refuges that can be updated as new data and information become available. Insights from this process may also be useful to inform future habitat management planning at the refuges.

New Jersey

Using value of information to prioritize research needs for migratory bird management under climate change: A case study using federal land acquisition in the United States

In response to global habitat loss, many governmental and non‐governmental organizations have implemented land acquisition programs to protect critical habitats permanently for priority species. The ability of these protected areas to meet future management objectives may be compromised if the effects of climate change are not considered in acquisition decisions. Unfortunately, the effects of climate change on ecological systems are complex and plagued by uncertainty, making it difficult for organizations to prioritize research needs to improve decision‐making. Herein, we demonstrate the use of qualitative value of information analysis to identify and prioritize which sources of uncertainty should be reduced to improve land acquisition decisions to protect migratory birds in the face of climate change. The qualitative value of information analysis process involves four steps: ( i ) articulating alternative hypotheses; ( ii ) determining the magnitude of uncertainty regarding each hypothesis; ( iii ) evaluating the relevance of each hypothesis to acquisition decision‐making; and ( iv ) assessing the feasibility of reducing the uncertainty surrounding each hypothesis through research and monitoring. We demonstrate this approach using the objectives of 3 U.S. federal land acquisition programs that focus on migratory bird management. We used a comprehensive literature review, expert elicitation, and professional judgement to evaluate 11 hypotheses about the effect of climate change on migratory birds. Based on our results, we provide a list of priorities for future research and monitoring to reduce uncertainty and improve land acquisition decisions for the programs considered in our case study. Reducing uncertainty about how climate change will influence the spatial distribution of priority species and biotic homogenization were identified as the highest priorities for future research due to both the value of this information for improving land acquisition decisions and the feasibility of reducing uncertainty through research and monitoring. Research on how changes in precipitation patterns and winter severity will influence migratory bird abundance is also expected to benefit land acquisition decisions. By contrast, hypotheses about phenology and migration distance were identified as low priorities for research. By providing a rigorous and transparent approach to prioritizing research, we demonstrate that qualitative value of information is a valuable tool for prioritizing research and improving management decisions in other complex, high‐uncertainty cases where traditional quantitative value of information analysis is not possible. Given the inherent complexity of ecological systems under climate change, and the difficulty of identifying management‐relevant research priorities, we expect this approach to have wide applications within the field of natural resource management.

Biological Reviews

Black oystercatcher (Haematopus bachmani) population size, use of marine reserve complexes, and spatial distribution in Oregon

The Black Oystercatcher is a large shorebird found along the west coast of North America. Because of their small global population size, low reproductive rate, and dependence on rocky intertidal habitats, they are considered a “species of high conservation concern” and may act as an indicator of intertidal ecosystem health. In 2015, the Audubon Society of Portland initiated a 3-year shore-based population survey in Oregon building upon long-term monitoring previously conducted by the U.S. Geological Survey (USGS) and others. The objectives were to 1) Estimate the current minimum population of breeding Black Oystercatchers in Oregon and to compare that to previous estimates to better understand the population trend; 2) Document oystercatcher abundance adjacent to the Oregon’s system of Marine Reserves and Marine Protected Areas; and 3) Describe spatial distribution of breeding oystercatchers along the coast. We targeted all rocky shoreline habitats along Oregon’s coastline to perform abundance surveys each spring. A total of 75 survey routes were sampled using a standardized protocol. Trained volunteer community scientists conducted the majority of the surveys. We used N-mixture statistical models to estimate oystercatcher population size and probability of detection. Population estimates from the best fitting models were consistent, with estimates ranging from 506 oystercatchers in 2016 (95% credible interval, 463-560) to 629 (548-743) in 2015. These estimates indicated a small but stable population. Probability of detection remained consistent across years (ranging from 0.51 to 0.53). The effect of geographic region corresponded with greater bird density in the southern region of Oregon. Oystercatcher abundance adjacent to MR/MPAs accounted for between 12.4-18.3% of the total population estimate which was lower than expected (~25%). We recommend that subsequent conservation efforts directed on Black Oystercatchers in Oregon balance limiting human disturbance, particularly on the north and central coasts, with ensuring protection of core habitats on the south coast where much of the population resides.

Oregon