Geology topics
Gloria J. Stiltner
Publications and source records attributed to Gloria J. Stiltner.
Elevations and discharges produced by a simulated flood wave on the lower Sabine River, Louisiana and Texas, caused by a theoretical dam failure
The Toledo Bend Reservoir is located on the lower Sabine River between Louisiana and Texas. The objective of this study was to calculate the flood wave that would result from the theoretical failure of 25 percent of Toledo Bend Dam and route the wave downstream to Orange, Tex. Computations assumed failure (1) at the peak of the 100-year flood when discharge of the Sabine River would be 102,000 cubic feet per second and (2) when the average discharge would be 10,000 cubic feet per second. Two techniques were used in the dam-break model. The method of characteristics was used to propagate the shock wave after the dam fails. The linear implicit finite-difference solution was used to route the flood wave after the shock wave has dissipated. The magnitude of the flood was determined for sites near Burkeville, Bon Wier, Ruliff, and Orange, Tex., along the lower Sabine River. For these sites, respectively, the following peak elevations were calculated: 119, 82, 31, and 13 feet for the 100-year flood and 110, 75, 27, and 9 feet for the average discharge.
Probable hydrologic effects of a hypothetical failure of Mackay Dam on the Big Lost River Valley from Mackay, Idaho to the Idaho National Engineering Laboratory
Mackay Dam is an irrigation reservoir on the Big Lost River, Idaho, approximately 7.2 kilometers northwest of Mackay, Idaho. Consequences of possible rupture of the dam have long concerned the residents of the river valley. The presence of reactors and of a management complex for nuclear wastes on the reservation of the Idaho National Engineering Laboratory (INEL), near the river , give additional cause for concern over the consequences of a rupture of Mackay Dam. The objective of this report is to calculate and route the flood wave resulting from the hypothetical failure of Mackay Dam downstream to the INEL. Both a full and a 50 percent partial breach of this dam are investigated. Two techniques are used to develop the dam-break model. The method of characteristics is used to propagate the shock wave after the dam fails. The linear implicit finite-difference solution is used to route the flood wave after the shock wave has dissipated. The time of travel of the flood wave, duration of flooding, and magnitude of the flood are determined for eight selected sites from Mackay Dam, Idaho, through the INEL diversion. At 4.2 kilometers above the INEL diversion, peak discharges of 1,550.2 and 1,275 cubic meters per second and peak flood elevations of 1,550.3 and 1,550.2 meters were calculated for the full and partial breach, respectively. Flood discharges and flood peaks were not compared for the area downstream of the diversion because of the lack of detailed flood plain geometry. (Kosco-USGS)