USGS ScienceSearch

Geology topics

Donald P. Roseboom

Publications and source records attributed to Donald P. Roseboom.

3 recordsLinked to original sources

Monitoring of green infrastructure at The Grove in Bloomington, Illinois

The City of Bloomington, Illinois, restored Kickapoo Creek to a more natural state by incorporating green infrastructure—specifically flood-plain reconnection, riparian wetlands, meanders, and rock riffles—at a 90-acre park within The Grove residential development. A team of State and Federal agencies and contractors are collecting data to monitor the effectiveness of this stream restoration in improving water quality and stream habitat. The U.S. Geological Survey (USGS) is collecting and analyzing water resources data; Illinois Department of Natural Resources (IDNR) is collecting fish population data; Illinois Environmental Protection Agency (IEPA) is collecting macroinvertebrates and riparian habitat data; and Prairie Engineers of Illinois, P.C., is collecting vegetation data. The data collection includes conditions upstream, within, and downstream of the development and restoration. The 480-acre development was designed by the Farnsworth Group to reduce peak stormwater flows by capturing runoff in the reconnected flood plains with shallow wetland basins. Also, an undersized park bridge was built at the downstream end of the park to pass the 20-percent annual exceedance probability flows (historically referred to as the 5-year flood), but detain larger floods. This design also helps limit sediment deposition from sediments transported in the drainage ditches in the upper 9,000 acres of agricultural row crops. Maintaining sediment-transport capacity minimizes sediment deposition in the restored stream segments, which reduces the loss of riparian and wetland-plant communities and instream habitat. Two additional goals of the restoration were to reduce nutrient loads and maintain water quality to support a diverse community of biotic species. Overall, 2 miles of previously managed agricultural-drainage ditches of Kickapoo Creek were restored, and the park landscape maximizes the enhancement of native riparian, wetland, and aquatic species for the park’s trail system. The purpose of this fact sheet is to give an overview and examples of the data being collected.

Illinois

Suspended-sediment yields and stream-channel processes on Judy's Branch watershed in the St. Louis Metro East region in Illinois

Judy's Branch watershed, a small basin (8.64 square miles) in the St. Louis Metro East region in Illinois, was selected as a pilot site to determine suspended-sediment yields and stream-channel processes in the bluffs and American Bottoms (expansive low-lying valley floor in the region). Suspended-sediment and stream-chan-nel data collected and analyzed for Judy's Branch watershed are presented in this report to establish a baseline of data for water-resource managers to evaluate future stream rehabilitation and manage-ment alternatives. The sediment yield analysis determines the amount of sediment being delivered from the watershed and two subwatersheds: an urban tributary and an undeveloped headwater (pri-marily agricultural). The analysis of the subwater-sheds is used to compare the effects of urbanization on sediment yield to the river. The stream-channel contribution to sediment yield was determined by evaluation of the stream-channel processes operat-ing on the streambed and banks of Judy's Branch watershed. Bank stability was related to hydrologic events, bank stratigraphy, and channel geometry through model development and simulation. The average suspended-sediment yield from two upland subwatersheds (drainage areas of 0.23 and 0.40 sq.mi. was 1,163 tons per square mile per year (tons/sq.mi.-year) between July 2000 and June 2004. The suspended-sediment yield at the Route 157 station was 2,523 tons/sq.mi.-year, near the outlet of Judy's Branch watershed (drainage area = 8.33 sq.mi.). This is approximately 1,360 tons/sq.mi.-year greater than the average at the upland stations for the same time period. This result is unexpected in that, generally, the suspended-sediment yield decreases as the watershed area increases because of sediment stored in the channel and flood plain. The difference indicates a possible increase in yield from a source, such as bank retreat, and supports the concept that land-use changes increase stream-flows that may in turn result in higher rates of bank retreat. Utilizing both bank-rod data and resurveyed cross-section data, it was determined that approxi-mately half of the suspended- sediment yield at Route 157 during July 2000-June 2004 came from bank retreat. Given that bank retreat can be a substantial portion of the sediment yield, understanding bank stability processes is important. Bank stability can be assessed mathematically by computing the factor of safety, which is defined by the ratio of the shear strength (resisting force) along the failure surface and the shear stress (driving gravitational force). Once the factor of safety falls below one, the bank theoretically becomes unstable. Bank-stability conditions were related to hydrologic events, bank type, and channel geometry through model develop-ment and simulation. The most common type of bank in the watershed consists of cohesive alluvial soil deposits overlying a stiff glacial till. A stabil-ity chart for different bank types was developed using a bank-stability analysis. Banks steeper than 70 degrees and higher than from 10 to 11.5 feet (depending on bank type) become at risk for mass failure in the watershed under conditions that pro-mote saturation of the bank and a sudden drop in the river level.

Scientific Investigations Report

Sediment coring and sedimentation analysis on Rasmussen Lake in Ethel's Woods Forest Preserve near Old Mill Creek, Illinois in 2005

The Lake County Forest Preserve District (LCFPD) is investigating the possibility of modifying the dam on Rasmussen Lake in Ethel's Woods Forest Preserve. The lake is of low water quality with an eroding shoreline. Sediments have been deposited in the impoundment over the last 50 years. Twenty-eight sediment sampling locations were identified along seven transects over a 51.4 acre area in Rasmussen Lake to determine sediment thickness and obtain sediment material for physical and chemical analyses. The maximum sediment thickness was consistently 3.0-4.5 feet (ft) from the dam to the upper end of the lake. The sediment thickness was less than 2.5 ft near the shore and in transect 5, near the northern part of the lake. Sediment thickness did not increase either in the upstream or downstream direction. The average-transect sediment thicknesses ranged from 1.8 to 2.7 ft. The approximate total sediment volume that has accumulated in the 51.4 acres of the lake over the past 50 years is 115.1 acre-feet.

Scientific Investigations Report