USGS ScienceSearch

Geology topics

Donald L. Song

Publications and source records attributed to Donald L. Song.

12 recordsLinked to original sources

Level II scour analysis for Bridge 30 (BRNATH00470030) on Town Highway 47, crossing Locust Creek, Barnard, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRNATH00470030 on Town Highway 47 crossing Locust Creek, Barnard, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in central Vermont. The 4.18-mi 2 drainage area is a predominantly rural and forested basin. In the vicinity of the study site, the surface cover consists of trees, shrubs, and brush. In the study area, Locust Creek has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 32 ft and an average bank height of 4 ft. The predominant channel bed material is gravel with a median grain size (D 50 ) of 49.5 mm (0.162 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 13, 1994, indicated that the reach was stable. The Town Highway 47 crossing of Locust Creek is a 28-ft-long, one-lane bridge consisting of one 25-foot concrete span (Vermont Agency of Transportation, written communication, August 23, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening. Historical bridge data indicates that the opening-skew-to-roadway is 45 degrees, but 35 degrees was computed by use of survey data from this study. A minor scour hole, 0.5 ft deeper than the mean thalweg depth was observed along the left abutment wall during the Level I assessment. The scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) on the upstream wingwalls. There also is type-3 stone fill on the downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 1.4 feet. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 2.3 to 8.9 feet. The worst-case abutment scour occurred at the 100-year discharge at the right abutment. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 22 (JAY-TH00400022) on Town Highway 40, crossing Jay Branch, Jay, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure JAY-TH00400022 on Town Highway 40 crossing Jay Tributary, Jay, Vermont (figures 1– 8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province in northern Vermont. The 2.15-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is primarily pasture on the upstream and downstream left overbank while the immediate banks have dense woody vegetation. The downstream right overbank of the bridge is forested. In the study area, Jay Branch Tributary has an incised, sinuous channel with a slope of approximately 0.02 ft/ft, an average channel top width of 26 ft and an average bank height of 3 ft. The channel bed material ranges from gravel to cobble with a median grain size (D 50 ) of 40.5 mm (0.133 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 7, 1995, indicated that the reach was stable. The Town Highway 40 crossing of Jay Branch Tributary is a 27-ft-long, two-lane bridge consisting of one 25-foot steel-beam span (Vermont Agency of Transportation, written communication, March 6, 1995). The opening length of the structure parallel to the bridge face is 23.5 ft. The bridge is supported by vertical, concrete abutments with wingwalls. The channel skew and the opening-skew-to-roadway are zero degrees. The scour counter-measures at the site included type-2 stone fill (less than 36 inches diameter) at the upstream end of the left and right abutments, at the upstream right wingwall, and at the downstream left wingwall. There was also type-3 stone fill (less than 48 inches diameter) at the upstream left and downstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and recommended rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.7 to 1.1 ft. The worst-case contraction scour occurred at the 500-year discharge. Left abutment scour ranged from 4.6 to 4.9 ft. The worst-case left abutment scour occurred at the 100-year discharge. Right abutment scour ranged from 4.0 to 5.0 ft. The worst-case right abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 46 (NORWTH00030046) Town Highway 3 (VT132) crossing the Ompompanoosuc River, Norwich, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure NORWTH00030046 on town highway 3, which is also Vermont State Route 132 crossing the Ompompanoosuc River, Norwich, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, available from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland physiographic province of east-central Vermont. The 135-mi 2 drainage area is a predominantly rural basin. A flood-control reservoir located approximately 2 mi upstream has 1.66 billion cubic feet of usable storage. In the vicinity of the study site, the left bank is forested and the right bank is covered by shrubs and brush, adjacent to woods. The Ompompanoosuc River is parallel to Town Highway 3. In the study area, the Ompompanoosuc River has a sinuous channel with a slope of approximately 0.003 ft/ft, an average channel top width of 166 ft and an average channel depth of 6 ft. The predominant channel bed material is sand (D 50 is 0.744 mm or 0.00244 ft). The geomorphic assessment at the time of the Level I and Level II site visit on August 19, 1994, indicated that the reach was stable. The town highway 3 crossing of the Ompompanoosuc Riveris a 100-ft-long, two-lane bridge consisting of two steel-beam spans (Vermont Agency of Transportation, written commun., July 29, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 12 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 38 (BETHTH00070038) on Town Highway 007, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00070038 on town highway 7 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 8.83-mi 2 drainage area is predominantly rural and forested. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, Gilead Brook is an incised, straight channel with a slope of approximately 0.028 ft/ft, an average channel top width of 46 ft and an average channel depth of 3 ft. The predominant channel bed material is gravel (D 50 is 43.9 mm or 0.144 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 18, 1994, indicated that the reach was stable. The town highway 5 crossing of the Black River is a 70-ft-long, two-lane bridge consisting of one 65-foot clear span (Vermont Agency of Transportation, written commun., August 2, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. There is also a retaining wall along the upstream side of the road embankments. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 3.0 ft deeper than the mean thalweg depth was observed along the right abutment. The scour hole was 27 feet long, 15 feet wide, and was 2.5 feet below the abutment footing at the time of the Level I assessment. This right abutment had numerous cracks and had settled. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The scour analysis results are presented in tables 1 and 2 and a graph of the scour depths is presented in figure 8.

Vermont

Level II scour analysis for Bridge 24 (WODSTH00190024) on Town Highway 19, crossing North Bridgewater Brook, Woodstock, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure WODSTH00190024 on Town Highway 19 crossing North Bridgewater Brook, Woodstock, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of east-central Vermont in the town of Woodstock. The 3.6-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the left and right banks are covered by moderate tree cover along the immediate banks with some pasture/ grassland beyond. In the study area, the North Bridgewater Brook has a sinuous channel with a slope of approximately 0.03 ft/ft, an average channel top width of 44 ft and an average channel depth of 4 ft. The channel bed materials ranges from sand to boulders with a D 50 (median diameter)of 70.1 mm or 0.229 ft. The geomorphic assessment at the time of the Level I and Level II site visits on August 17, 1994 and December 13, 1994, indicated that the reach was stable. Localized bank cutting existed at the immediate downstream left bank. The Town Highway 19 crossing of the North Bridgewater Brook is a 26-ft-long, one-lane bridge consisting of one 23-ft steel-beam span (Vermont Agency of Transportation, written commun., August 3, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. Type-2 (less than 3 ft diameter) stone fill protects the upstream left wingwall which is impacted by flow. The channel bed under the bridge is constructed of wood. This construction is preventing channel degradation along the impacted left abutment.The channel is skewed approximately 40 degrees to the opening; the opening-skew-to-roadway is 10 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. Abutment scour ranged from 6.6 to 14.9 ft. with the worst-case scenario occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 35 (BETHTH00190035) on Town Highway 19, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00190035 on town highway 19 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 6.40-mi 2 drainage area is predominantly rural and forested. In the vicinity of the study site, the immediate banks have woody vegetation coverage with pasture beyond. In the study area, Gilead Brook is an incised, sinuous channel with a slope of approximately 0.015 ft/ft, an average channel top width of 31 ft and an average channel depth of 2.5 ft. The predominant channel bed material is gravel and cobble (D 50 is 62.5 mm or 0.205 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 20, 1994, indicated that the reach was stable. The town highway 19 crossing of Gilead Brook is a 30-ft-long, one-lane bridge consisting of one 24-foot steel-beam span with timber deck (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 10 degrees. The scour protection measures at the site included type-1 stone fill (less than 12 inches diameter) at the downstream wingwalls, left abutment, and upstream right road embankment; type-2 stone fill (less than 36 inches diameter) is at the upstream right wingwall. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.1 to 2.1 ft. with the worst-case scenario occurring at the 500-year discharge. Abutment scour ranged from 3.9 to 9.5 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 48). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection measures, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 42 (BETHTH00860042) on Town Highway 86, crossing Gilead Brook, Bethel, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BETHTH00860042 on town highway 86 crossing Gilead Brook, Bethel, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge available from VTAOT files were compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bethel. The 11.4-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the upstream banks are tree covered and the downstream banks are covered with shrubs and brush. In the study area, Gilead Brook is probably incised, has a sinuous channel with a slope of approximately 0.012 ft/ft, an average channel top width of 53 ft, and an average channel depth of 5 ft. The predominant channel bed material is gravel to cobbles (D 50 is 85.6 mm or 0.281 ft). The geomorphic assessment at the time of the Level I and Level II site visit on September 30, 1994, indicated that the reach was stable. The town highway 86 crossing of Gilead Brook is a 28-ft-long, one-lane bridge consisting of one 25-foot clear-span structure with a concrete deck (Vermont Agency of Transportation, written commun., August 24, 1994). The bridge is supported by concrete abutments with wingwalls. The bridge skew is approximately 5 degrees and there is no opening-skew-to-roadway. A scour hole approximately 1 ft deeper than the mean thalweg depth was observed along the left bank, near the upstream bridge face during the Level I assessment. There is also approximately 1 ft of scour along the left abutment of the bridge, near the upstream wing wall, exposing the footing. There is type-one (less than 12 in diameter) protection on the US left wingwall and type-two (less than 36 in diameter) along the US and DS right wingwalls. There is no protection along the abutments. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0 to 1.9 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge and the 100-year discharge. Abutment scour ranged from 8.6 to 15.7 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and engineering judgement.

Vermont

Level II scour analysis for Bridge 46 (BRIDTH00050046) on Town Highway 05, crossing North Branch Ottauquechee River, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00050046 on town highway 5 crossing the North Branch Ottauquechee River, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). A Level I study is included in Appendix E of this report. A Level I study provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the Green Mountain physiographic province of central Vermont in the town of Bridgewater. The 5.61-mi 2 drainage area is a predominantly rural and forested basin. In the vicinity of the study site, the banks are forested. Town highway 5 parallels the upstream left bank. In the study area, the North Branch Ottauquechee River has a sinuous channel with a slope of approximately 0.015 ft/ft, an average channel top width of 48 ft and an average channel depth of 6 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 66.2 mm (0.217 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 2 and 3, 1994, indicated that the reach was stable. The town highway 5 crossing of North Branch Ottauquechee Riveris a 40-ft-long, one-lane bridge consisting of a 34-ft steel-beam span, supported by vertical abutments with no wingwalls (Vermont Agency of Transportation, written communication, August 25, 1994). The left abutment is stone; the right abutment is log cribwork with type-2 stone fill (less than 36 inches diameter) along its base. Type-2 stone fill has also been placed on the upstream and downstream sides of the road embankments, except the upstream left which has type-3 (less than 48 inches diameter). The channel is skewed approximately 60 degrees; the opening-skew-to-roadway is 30 degrees. Additional details describing conditions at the site are included in the Level II Summary, Appendix D, and Appendix E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of these computed results follow. Contraction scour for all modelled flows was 0.0 ft. Abutment scour ranged from 5.7 ft to 7.7 ft. with the worst-case abutment scour occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated depths, are presented in tables 1 and 2. A cross-section of the computed scour at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1993, p. 22). Many factors, including historical performance during flood events, the geomorphic assessment, scour protection, and the results of the hydraulic analyses, must be considered to properly assess the validity of abutment scour results. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein, based on the consideration of additional contributing factors and experienced engineering judgement.

Vermont

Level II scour analysis for Bridge 33 (BRIDTH00050033) on Town Highway 5, crossing the North Branch Ottauquechee River, Bridgewater, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure BRIDTH00050033 on town highway 5 crossing the North Branch Ottauquechee River, Bridgewater, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of central Vermont in the town of Bridgewater. The 5.01-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the downstream banks are forested and the upstream banks have dense woody brush; the upstream right overbank is an open field. In the study area, the North Branch Ottauquechee River has an incised, sinuous channel with a slope of approximately 0.017 ft/ft, an average channel top width of 30 ft and an average channel depth of 3 ft. The predominant channel bed materials are gravel and cobble with a median grain size (D 50 ) of 83.2 mm (0.273 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 3, 1994, indicated that the reach was stable. Also at the time of the site visit, there was considerable backwater at the bridge site due to a three foot tall beaver dam 40 feet downstream. The beaver dam was assumed destroyed by flood flow and was ignored in the analyses. The town highway 5 crossing of the North Branch Ottauquechee Riveris a 25-ft-long, onelane bridge consisting of one 23-foot steel-beam span with a timber deck (Vermont Agency of Transportation, written communication, August 25, 1994). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 20 degrees to the opening while the opening-skew-to-roadway is 10 degrees. A scour hole 1.0 ft deeper than the mean thalweg depth was observed along the right abutment and upstream right wingwall during the Level I assessment. Scour protection measures at the site include type-2 stone fill (less than 36 inches diameter) at the ends of all the wingwalls except the upstream left which has type-3 stone fill (less than 48 inches diameter). Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1993). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.7 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge, which was less than the 100-year discharge. Abutment scour ranged from 5.3 to 7.2 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 46 (CHELTH00680046) on Town Highway 68, crossing the First Branch of the White River, Chelsea, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure CHELTH00680046 on town highway 68 crossing the First Branch of the White River, Chelsea, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of central Vermont in the town of Chelsea. The 58.2-mi 2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the banks have dense woody vegetation coverage. In the study area, the First Branch of the White River has a sinuous channel with a slope of approximately 0.0054 ft/ft, an average channel top width of 92 ft and an average channel depth of 4 ft. The predominant channel bed material is gravel and cobble (D 50 is 52.7 mm or 0.173 ft). The geomorphic assessment at the time of the Level I and Level II site visit on November 16, 1994, indicated that the reach was stable. The town highway 68 crossing of the First Branch of the White River is a 61-ft-long, onelane covered bridge with a 52-foot clear-span (Vermont Agency of Transportation, written commun., August 26, 1994). The bridge is supported by vertical, stone abutments with a concrete wingwall on the downstream right. The left abutment is laid-up stone supported by concrete at the upstream and downstream ends of the laid-up stone abutment. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 15 degrees. A scour hole 1.5 ft deeper than the mean thalweg depth was observed under the bridge during the Level I assessment. The scour protection measures in place at the site were type- 2 stone fill (less than 36 inches diameter) at the road approach embankments except the downstream left embankment which had no protection. The upstream right road embankment, impacted by the channel bend, has an extensive covering of stone fill for erosion protection. Type-3 stone fill (less than 48 inches diameter) was noted along the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.9 to 2.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 14.3 to 24.0 ft. The worst-case abutment scour occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. The left abutment sits atop a bedrock outcrop. The results of the calculated scour depths will be limited by the bedrock. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont

Level II scour analysis for Bridge 5 (IRASTH00010005) on Town Highway 1, crossing Lords Creek, Irasburg, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure IRASTH00010005 on town highway 1 crossing Lords Creek, Irasburg, Vermont (figures 1– 8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from VTAOT files, was compiled prior to conducting Level I and Level II analyses and can be found in Appendix D. The site is in the New England Upland section of the New England physiographic province of north-central Vermont in the town of Irasburg. The 15.1-mi 2 drainage area is in a predominantly rural and forested basin with some pasture land mainly along the valley bottom. In the vicinity of the study site, the bank vegetation coverage is pasture grasses. In the study area, Lords Creek has a meandering channel with a slope of approximately 0.0026 ft/ft, an average channel top width of 32 ft and an average channel depth of 3 ft. The channel bed material ranged from gravel (D50 is 46.6 mm or 0.153 ft) to silt/clay material (D 50 of 1.006 mm or 0.0033 ft). The geomorphic assessment at the time of the Level I and Level II site visit on October 5 and 6, 1994, indicated that the reach was laterally unstable. The town highway 1 crossing of Lords Creek is a 65-ft-long, two-lane bridge consisting of one 61-foot, steel-beam span (Vermont Agency of Transportation, written communication, August 2, 1994). The bridge is supported by vertical, concrete abutments on wooden piles driven to bedrock with no wingwalls. Each abutment wall has a spill-through slope protected with type-2 stone fill (less than 36 inches diameter). The channel is skewed approximately 25 degrees to the opening while the opening-skew-to-roadway is 15 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 2.4 to 4.6 ft. The worst-case contraction scour occurred at the 500-year discharge. Abutment scour ranged from 7.2 to 9.8 ft. The worst-case abutment scour also occurred at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermot

Level II scour analysis for Bridge 6 (RICHTH00030006) on Town Highway 3, crossing an unnamed tributary to the Missisquoi River, Richford, Vermont

This report provides the results of a detailed Level II analysis of scour potential at structure RICHTH00030006 on Town Highway 3 crossing an unnamed tributary to the Missisquoi River, Richford, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the Green Mountain section of the New England physiographic province of northern Vermont. The 4.5-mi 2 drainage area is in a predominantly rural basin. In the vicinity of the study site, the surface cover is pasture upstream and downstream of the bridge. In the study area, the unnamed tributary to the Missisquoi River is a sinuous channel with a slope of approximately 0.008 ft/ft, an average channel top width of 39 ft and an average channel depth of 2 ft. The channel slope was obtained from a topographic map (USGS, 1986). The predominant channel bed material is gravel with a median grain size (D 50 ) of 26.2 mm (0.0861 ft). The geomorphic assessment at the time of the Level I and Level II site visit on June 28, 1995, indicated that the reach was stable. The Town Highway 3 crossing of an unnamed tributary to the Missisquoi River is a 26-ftlong, two-lane bridge consisting of one 24-foot concrete T-beam span (Vermont Agency of Transportation, written communication, March 9, 1995). The bridge is supported by vertical, concrete abutments with wingwalls. The channel is skewed approximately 40 degrees to the opening while the opening-skew-to-roadway is 0.0 degrees. The only scour protection measures at the site were type-2 stone fill (less than 36 inches diameter) along the upstream right wingwall and at the upstream end of the right abutment. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 1.7 to 1.8 ft. The worst-case contraction scour occurred at the 500-year discharge. Scour at the left abutment ranged from 7.6 to 12.6 ft with the worst case occurring at the 100-year event. Scour at the right abutment ranged from 1.6 to 5.6 ft with the worst case occurring at the 500-year event. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A cross-section of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Vermont