USGS Science⌕ Search

Geology topics

C.L. Sanders

Publications and source records attributed to C.L. Sanders.

8 recordsLinked to original sources

The use of three-parameter rating table lookup programs, RDRAT and PARM3, in hydraulic flow models

Subroutines RDRAT and PARM3 enable computer programs such as the BRANCH open-channel unsteady-flow model to route flows through or over combinations of critical-flow sections, culverts, bridges, road- overflow sections, fixed spillways, and(or) dams. The subroutines also obstruct upstream flow to simulate operation of flapper-type tide gates. A multiplier can be applied by date and time to simulate varying numbers of tide gates being open or alternative construction scenarios for multiple culverts. The subroutines use three-parameter (headwater, tailwater, and discharge) rating table lookup methods. These tables may be manually prepared using other programs that do step-backwater computations or compute flow through bridges and culverts or over dams. The subroutine, therefore, precludes the necessity of incorporating considerable hydraulic computational code into the client program, and provides complete flexibility for users of the model for routing flow through almost any affixed structure or combination of structures. The subroutines are written in Fortran 77 language, and have minimal exchange of information with the BRANCH model or other possible client programs. The report documents the interpolation methodology, data input requirements, and software.

Water-Resources Investigations Report↗

Flood frequency of the Savannah River at Augusta, Georgia

To fill an increasing need for reliable information on floods of various recurrence intervals on the Savannah River a flood-frequency relation was developed for the long-term gaging station at Augusta, Georgia. The flood-frequency analysis was complicated by the fact that the Savannah River upstream of Augusta has experienced increasing regulation of flow caused by three large dams constructed since 1952. The pre-impoundment period was important to the flood-frequency analysis because it included a number of large floods that, even when adjusted for regulation, exceed all floods since 1952. A reservoir routing model was used to adjust nine such floods for the effects of regulation, and to develop a relation for estimating regulated peak discharges for additional unregulated floods. The 1% chance exceedance flood for regulated conditions on the Savannah River at Augusta was computed as 180,000 cu ft/sec. (USGS)

Georgia↗

Freshwater supply potential of the Atlantic Intracoastal Waterway near Myrtle Beach, South Carolina

A study was conducted to determine the low-flow frequency of freshwater flow in the Atlantic Intracoastal Waterway (AICW) near Myrtle Beach, South Carolina and to determine the effects of proposed freshwater withdrawals of 45 cu ft/sec at the location of the saltwater-freshwater interface. Discharges simulated in the AICW for 1982-86 using BRANCH one-dimensional flow model were used to establish a relation of 7-day average flows in the AICW to summed 7-day average flows of four tributary streams. This relation was used with the tributary records for 1954-86 climatic years to generate 7-day minimum flows of the AICW, which were then used to develop a low-flow frequency relation. The relation indicated that the 7-day, 10-year flow of the Atlantic Intracoastal Waterway is 192 ct ft/s. A relation of the mile position of the saltwater-freshwater interface to recorded specific conductances at Vereen 's Marina was established. The 1982-85 period of record of specific conductance was used to simulate interface positions which were then used to establish a relation of 7-day average interface position to 7-day average discharge of the AICW. This relation indicated that the 7-day average interface position would be at mile 355.5 for the 7Q10 and at mile 356.2 if 45 cu ft were withdrawn during the 7Q10. The analysis indicates that the AICW can provide a reliable supply of freshwater at the proposed withdrawal location at mi 363.3 in the vicinity of Myrtle Beach, even during the 7Q10 low-flow conditions. (USGS)

South Carolina↗

Floodflow characteristics of Filbin Creek for pre- and post-construction conditions, 1986, at North Charleston, South Carolina

A study to determine the effect of the construction of a shopping and business center, and of the construction and improvement of several highways on floodflow in the Filbin Creek drainage basin near North Charleston, South Carolina was performed. Discharge hydrographs were synthesized using computerized U.S. Soil Conservation Service unit hydrograph methods and routed using reservoir, step backwater, and culvert flow programs. Construction of the shopping and business center, according to plans of July 1986, will raise the water surface elevations upstream of Interstate Highway 26 by about 2.0 ft for runoff from 100-yr rainfall. Structures at Seaboard Railroad downstream of U.S. Highway 52, U.S. Highway 52, and Virginia Avenue would cause about 2.0, 2.6, and 4.1 ft of backwater, respectively. (Author 's abstract)

South Carolina↗